You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. VALIDATION & TESTING OF THE VAM2D COMPUTER CODE

    SBC: Hydrogeologic Inc.            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
  2. VALIDATION & TESTING OF THE VAM2D COMPUTER CODE

    SBC: Hydrogeologic Inc.            Topic: N/A

    SEVERAL STATES ARE CURRENTLY SEEKING MUCH-NEEDED NEW LOW-LEVEL RADIOACTIVE DISPOSAL SITES IN ACCORDANCE WITH THE LOW-LEVEL RADIOACTIVE WASTE POLICY ACT OF 1980. ANY NEW COMMERCIALREQUIREMENT THAT A SITE BE CAPABLE OF BEING MODELED AND THATITS PERFORMANCE BE ASSURED FOR 500 YEARS. FOR MOST SITES, THE HYDROGEOLOGICAL AND RADIONUCLIDE TRANSPORT CHARACTERIS- TICS OF THE UNSATURATED ZONE ARE MAJOR FACT ...

    SBIR Phase II 1989 Nuclear Regulatory Commission
  3. CONTROL VALVE CAVITATION GUIDE

    SBC: Tullis Engineering Consultants            Topic: N/A

    ONE OF THE IMPORTANT UNRESOLVED OPERATIONAL PROBLEMS AT NUCLEAR POWER PLANTS IS CAVITATION IN CONTROL VALVES. EACH YEAR COSTLY SHUTDOWNS ARE NECESSARY TO REPAIR VALVES DAMAGED BY CAVITATION. THE PROBLEM IS MORE THAN JUST AN ECONOMICAL BURDEN ON THE UTILITY, IT CAN CREATE SAFETY-RELATED PROBLEMS BECAUSE A VALVE DAMAGED BY CAVITATION MAY NOT BE ABLE TO PERFORM ITS INTENDED FUNCTION. THE PRIMARY REAS ...

    SBIR Phase I 1992 Nuclear Regulatory Commission
  4. AN YTTRIUM ALUMINUM PEROVSKITE BASED GAMMA-RAY DOSIMETER

    SBC: W Peter Trower Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Nuclear Regulatory Commission
  5. AN YTTRIUM ALUMINUM PEROVSKITE BASED GAMMA-RAY DOSIMETER

    SBC: W Peter Trower Inc.            Topic: N/A

    WE PROPOSE TO EXPLOIT THE PROPERTIES OF OUR NEW, FAST, BRIGHT SCINTILLATOR, YAIO3:CE(+3) (YAP), TO CONSTRUCT A DETECTOR FOR PHOTONS WITH ENERGIES FROM 20 KEV TO 3 MEV. AN ARRAY OF THESE INDIVIDUAL DETECTORS WILL SERVE AS THE BASIS FOR A BROAD-BAND Y-RAY DOSIMETER CAPABLE OF MEASURING EXPOSURES FROM 5 MR/H TO 1 R/H AND EQUIVALENT DOSES FROM 5 X 10(-2) TO 10 (+4) MSV/H. THEA ADVANTAGES OF YAP SCINTI ...

    SBIR Phase II 1995 Nuclear Regulatory Commission