You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
EXTREME ULTRAVIOLET AND SOFT X-RAY INSTRUMENTATION FOR MICROCHARACTERIZATION OF MATERIALS
SBC: Altex Corp. Topic: N/AN/A
SBIR Phase I 1983 Department of Energy -
SUPERCONDUCTING ACCELERATING RESONATOR FOR VERY LOW VELOCITY IONS
SBC: Applied Superconductivity Inc Topic: N/AN/A
SBIR Phase I 1983 National Science Foundation -
THIS PHASE I, 6-MONTH FEASIBILITY STUDY IS TO ADDRESS PROBLEMS OUTLINED BY THE FUNDAMENTAL NEUROSCIENCES PROGRAM OF THE NATIONAL INSTITUTE OF NEUROLOGICAL AND COMMUNICATIVE DISORDERS AND STROKE (NINCDS).
SBC: Biomaterials International Inc Topic: N/ATHIS PHASE I, 6-MONTH FEASIBILITY STUDY IS TO ADDRESS PROBLEMS OUTLINED BY THE FUNDAMENTAL NEUROSCIENCES PROGRAM OF THE NATIONAL INSTITUTE OF NEUROLOGICAL AND COMMUNICATIVE DISORDERS AND STROKE (NINCDS). ULTIMATE LONG TERM SUCCESS OF AN AUDITORY PROSTHESIS REQUIRES AN ELECTRODE DESIGN WHICHIS FLEXIBLE ENOUGH FOR EASY INSERTION, CAN BOND SUFFICIENTLYWITH METALS TO WITHSTAND BENDING AND ELIMINATE WI ...
SBIR Phase I 1983 Department of Health and Human Services -
SIX-COMPONENT ROBOTIC FORCE-TORQUE SENSOR
SBC: BONNEVILLE SCIENTIFIC, INC. Topic: N/AN/A
SBIR Phase I 1983 National Aeronautics and Space Administration -
THERE IS A GROWING MANDATE FOR EMPLOYEE TRAINING ABOUT THE POTENTIAL HAZARDS OF SUBSTANCES ESPECIALLY CARCINOGENS, USEDIN THE WORK ENVIRONMENT.
SBC: Carnow, Conibear, & Associates Topic: N/ATHERE IS A GROWING MANDATE FOR EMPLOYEE TRAINING ABOUT THE POTENTIAL HAZARDS OF SUBSTANCES ESPECIALLY CARCINOGENS, USEDIN THE WORK ENVIRONMENT. THIS RESEARCH PROPOSAL IS DESIGNEDTO ANSWER QUESTIONS RELATED TO THE RELATIVE EFFECTIVENESS OFVARIOUS TRAINING APPROACHES, NOT JUST THE ABSOLUTE VALUE OF TRAINING VERSUS NO TRAINING. THE OVERALL RESEARCH GOAL IS TO ESTABLISH THE BEST TRAINING INTERVENTIONS ...
SBIR Phase I 1983 Department of Health and Human Services -
CERVICAL CANCER DETECTION & SCREENING
SBC: Cell Analysis Systems Inc. Topic: N/AN/A
SBIR Phase I 1983 Department of Health and Human Services -
CERVICAL CANCER DETECTION AND SCREENING (PHASE I)
SBC: Cell Analysis Systems Inc. Topic: N/AN/A
SBIR Phase I 1983 Department of Health and Human Services -
DEVELOPMENT OF NB(X)TI(1-X)O(2-D) SEMICONDUCTING ELECTRODES FOR PHOTOELECTROLYSIS OF WATER
SBC: Technology Holding, LLC Topic: N/AN/A
SBIR Phase I 1983 National Science Foundation -
HIGH ENERGY HIGH POWER DENSITY SODIUM\MIXED CHALCOGENIDE BATTERIES FOR POWER APPLICATIONS.
SBC: Technology Holding, LLC Topic: N/AN/A
SBIR Phase I 1983 Department of DefenseAir Force -
THE PROPOSED PROGRAM IS DIRECTED TOWARDS THE "IN SITU" MEASUREMENT OF MINORITY-CARRIER LIFETIMES IN SEMICONDUCTOR DEVICES BY THE APPLICATION OF ELECTRO-OPTICAL BIREFRINGENCE RELATION SPECTROSCOPY.
SBC: ELTRON RESEARCH & DEVELOPMENT, INCORPORATED Topic: N/ATHE PROPOSED PROGRAM IS DIRECTED TOWARDS THE "IN SITU" MEASUREMENT OF MINORITY-CARRIER LIFETIMES IN SEMICONDUCTOR DEVICES BY THE APPLICATION OF ELECTRO-OPTICAL BIREFRINGENCE RELATION SPECTROSCOPY. THIS PROPOSED TECHNIQUE IS BASED UPON CHANGES THAT OCCUR IN OPTICAL PHASE RETARDATION UPON THE INTERACTION OF LIGHT WITH SEMICONDUCTOR INTERFACES. THEOPTICAL RETARDATION OR BIREFRINGENCE EFFECT IS INFLUE ...
SBIR Phase I 1983 Department of Energy