You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Novel, High Speed, Linear Modulators with Domain Inverted Sections

    SBC: Advanced Photonics            Topic: N/A

    Advanced Photonics Technology (APT) proposes to develop novel, wide-band, highly linear integrated-optical modulators based on low-loss waveguides in ferroelectric (e.g., lithium niobate and lithium tantalate) crystals with domain-inverted sections. The application of domain inversion to electro-optical modulators introduces a novel approach that allows the development of devices with low levels o ...

    SBIR Phase II 1996 Department of DefenseAir Force
  2. AIR-SPARGED HYDROCYCLONE TECHNOLOGY FOR REMOVAL OF OIL AND AFFF FROM WASTE WATER

    SBC: Advanced Processing Tech.,            Topic: N/A

    It is difficult to remove oil and AFFF from voluminous streams. Research has been continously carried out to develop new technologies to be employed in this field of application with little success. Air-sparged hydrocyclone (ASH) flotation technology is a new technology developed by the University of Utah and Advanced Processing Technologies, Inc. It combines the advantages from both conventional ...

    SBIR Phase II 1996 Department of DefenseNavy
  3. Statistical Design of Complementary Power FET for High Efficiency Amplifiers

    SBC: AET, Inc.            Topic: N/A

    The United States Army has identified the need for high power efficiency transmitter systems. The goals of the U.S. Army can be achieved through the use of switched mode amplifiers used as Class D or E. The objective of this proposed Phase I SBIR program is to design a pair of complementary FET's (N-Channel and P-Channel) capable of switching at frequencies sufficient to provide switch mode ampl ...

    SBIR Phase I 1996 Department of DefenseArmy
  4. LOW-COST DESIGN AND ANALYSIS METHOD FOR HYDROSTATIC BEARINGS

    SBC: AFAB Technologies, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 National Aeronautics and Space Administration
  5. H-Mutant Phage Control of Harmful Plant Bacteria

    SBC: Agriphi, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Agriculture
  6. High Throughput Multiple Access Digital Wireless Communications

    SBC: AIMS, INC.            Topic: N/A

    We propose a radically innovative approach to the problem of multiple access communication which promises to revolutionize the modern communication industry by dramatically increasing network throughput. Our approach is based upon two major novel components: (i) hybrid time-frequency allication of communication channel resources, and(ii) non-orthogonal, i.e., overlaping, multiplexed signals. Toge ...

    SBIR Phase I 1996 Department of DefenseOffice of the Secretary of Defense
  7. Advanced Technology Speech Recognition System

    SBC: Amdyne Corp            Topic: N/A

    This effort will integrate an advanced technology speech recognition system (SRS) with a computer-assisted contingency planning training model. The SRS makes use of algorithms developed in the Speech Technology and Research Labratory of SRI International. Its state-of-the-art approach provides significant improvements in accuracy and robustness over other approaches. It provides for speaker ind ...

    SBIR Phase I 1996 Department of DefenseArmy
  8. Propulsion Capability for 3-Inch Submarine Countermeasures

    SBC: ZIMMERMAN ASSOC., INC.            Topic: N/A

    An operational requirement is projected for an inexpensive, mobile, submarine acoustic countermeasure capability. A significant tactical advantage is gained by putting as much distance as possible between the submarine (launch platform) and the mobile countermeasure. An additional advantage is gained if the submarine has the ability to place the ADC between itself and the torpedo threat. Adding ...

    SBIR Phase II 1996 Department of DefenseNavy
  9. Low Frequency (50-500 Mhz) Radar Sensor System For Measurement Of Terrestrial Vegetative Biomass

    SBC: ZIMMERMAN ASSOC., INC.            Topic: N/A

    N/A

    SBIR Phase II 1996 National Aeronautics and Space Administration
  10. Encapsulating Aqueous Diets for Beneficial Insects Using Synthetic Polymers

    SBC: AMERICAN SUPERCONDUCTOR CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Agriculture
US Flag An Official Website of the United States Government