You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Modeling the Powder Injection Molding Process for Defect-Free, Net-Shape Metal and Ceramic Components.

    SBC: LONE PEAK ENGINEERING COMPANY            Topic: N/A

    The Army has identified a need for process innovations that would support the production of components for light weight vehicles out of advanced materials. The use of advanced, lightweight structural materials in vehicular applications presents an opportunity to enhance the effectiveness of Army units. Through more effective energy utilization, fuel will be conserved, which will simplify the log ...

    SBIR Phase I 1996 Department of DefenseArmy
  2. An Innovative Microwave Applicator for Paint Stripping

    SBC: MJR Scientific            Topic: N/A

    An effective removal of paint from many surfaces can result in increased safety and reduced maintenance cost for many systems. The ideal paint stripping system should; 1) easily strip paint from various structures, 2) allow safe operation and safe removal of paint hazardous by-products (e.g. lead paint dust), 3) not damage the surface, and 4) by simple and reliable for manual and automated operati ...

    SBIR Phase I 1996 Department of DefenseArmy
  3. Filterless Heat exchanger precleaner based on guide vane approach

    SBC: MJR Scientific            Topic: N/A

    The efficiency, maintenance cost, and service life of off-highway vehicles can be drastically improved with the development of a heat exchanger precleaner. Development challenges include ease of integration with present and new vehicles, the device compact size, high contaminates removal efficiency, low initial and maintenance cost, and high reliability. The objective of Phase I of this project is ...

    SBIR Phase II 1996 Department of DefenseArmy
  4. Radiofrequency Plasma Ionization/Time-of-flight Mass Spectrometer for Real-time MOnitoring of Trace Chemical Vapors During OB/OD Operations

    SBC: Sensar Corp            Topic: N/A

    Open burning/open detonation (OB/OD) operations for the disposal of obsolete, defective, and waste military energetic materials, such as propellants, explosives, and pyrotechnics now require emissions data to support RCRA subpart X permit applications. Many of the current analytical methods used to obtain these data, such as gas chromatography/mass spectrometry and supercritical fluid chromatogra ...

    SBIR Phase I 1996 Department of DefenseArmy
  5. Controllable Solid-State Pump for Missile Propulsion Systems

    SBC: Technical research Associates, Inc.            Topic: N/A

    New tactical missiles may require on-demand thrust control utilizing liquid propellent systems. the objective of this project is to develop a small, highly controllable, low cost. electrically driven high pressure liquid fuel pump to be used for tactical missile propulsion sustems. Phase I will investigate the feasibility of a novel solid-state pump technology. The device will operate at very h ...

    SBIR Phase I 1996 Department of DefenseArmy
  6. Light Weight Small Volume Stereoscopic Visual Sensors for Telepresence on Robotic Rotorcraft Research Vehicles

    SBC: Telerobotics International,            Topic: N/A

    The Department of Defense is actively pursuing the development of Remotely Operated Vehicles (ROV). Visual feedback provided to the operator is a major component required for the successful control of the ROV. The proposed approach utilizes dual units of a patented TRI imaging system, Omniview TM, in conjunction with a helmet tracking system to create a stereo image representation of the remote en ...

    SBIR Phase II 1996 Department of DefenseArmy
  7. Enhanced Mobility for Small Vehicle Platforms

    SBC: AUTONOMOUS SOLUTIONS INC            Topic: A03215

    This SBIR proposal consists of three (3) related research efforts. Research effort 1 will focus on further development of the configurable running gear / shape shifting track concept as started by ASI during the Phase I award. Research effort 2 will focus on the development and completion of the hardware and electronics systems of the T4 robot as started at the Center for Self Organizing and Int ...

    SBIR Phase II 2005 Department of DefenseArmy
  8. Sodium-Air Batteries Based on Sodium Super-Ionic Conducting Electrolyte

    SBC: Technology Holding, LLC            Topic: A04052

    High energy density battery will be developed by combining metallic sodium anode with an air cathode. The proposed sodium-air battery is expected to dominate the performance of lithium-air battery. This battery technology is based on sodium conducting solid-electrolyte developed at Ceramatec Inc. The sodium conducting solid-electrolyte has conductivity in the range of 10-2 S/cm at ambient tempera ...

    SBIR Phase I 2005 Department of DefenseArmy
  9. Shelf Life Prediction of Rocket Motors

    SBC: COGNITECH CORPORATION            Topic: A04165

    Stockpiles of weapons with composite rocket motors have been expensive to acquire. In the fortunate occurrence that these weapons are not used, they are too expensive to discard based upon simple expiration dates. However, use of these weapons can be dangerous if their integrity is compromised due to aging and deterioration. CogniTech proposes to build a software suite containing a graphical ...

    SBIR Phase I 2005 Department of DefenseArmy
  10. L-Band High Power Amplifiers for Directed Energy Weapons

    SBC: INNOSYS, INC.            Topic: A05021

    This solicitation calls for research and exploration on approaches to find solutions to high power W-band amplifiers for use in directed energy (DE) weapons that are more affordable and compact and have additional desirable features including low standby power and instant-on capabilities and are, for example, HUMVEE field friendly. In addition the ability to produce such amplifiers in relatively ...

    SBIR Phase I 2005 Department of DefenseArmy
US Flag An Official Website of the United States Government