You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Enhanced Mobility for Small Vehicle Platforms

    SBC: AUTONOMOUS SOLUTIONS INC            Topic: A03215

    This SBIR proposal consists of three (3) related research efforts. Research effort 1 will focus on further development of the configurable running gear / shape shifting track concept as started by ASI during the Phase I award. Research effort 2 will focus on the development and completion of the hardware and electronics systems of the T4 robot as started at the Center for Self Organizing and Int ...

    SBIR Phase II 2005 Department of DefenseArmy
  2. Artifact Reduced Tomographic Algorithms

    SBC: JDLL, INC.            Topic: A03019

    Current computed tomography (CT) techniques for nondestructive testing (NDT) of munitions and other non-medical specimens often produce inferior imagery due to artifacts, impairing detection, identification, and measurement of anomalies. In this Phase II, JDLL generalizes its Phase I artifact-reducing CT algorithms to 3D cone-beam configurations, testing these algorithms against real data, perman ...

    SBIR Phase II 2005 Department of DefenseArmy
  3. Miniature disposable drug infusion pumps with improved safety features and embedded computer control

    SBC: STERLING RESEARCH CORPORATION            Topic: OSD05H01

    Sarcos Research Corporation proposes the development of a miniature, disposable, embedded computer-controlled IV infusion pump for administration of drugs during casualty treatment, stabilization and transport on the battlefield. The pump will be based on the Company's proprietary design concepts that enable pumps that are accurate, power efficient, small size, light weight, rugged, and can opera ...

    SBIR Phase I 2005 Department of DefenseArmy
  4. A MEMS Smart Battery Monitoring and Hybrid Power System

    SBC: MICRON CORPORATION            Topic: A03236

    A hybrid power system for military vehicles, consisting of a battery status controlled generator for charging and a battery/capacitor hybrid is proposed. The components of the system are controlled by identical MEMS based integrated smart controllers which are integral parts of the battery/capacitor/generator system and communicate wireless with each other, with the dashboard and with maintenance ...

    SBIR Phase II 2005 Department of DefenseArmy
  5. Development of Advanced Military Prosthetic Shoulder System

    SBC: STERLING RESEARCH CORPORATION            Topic: A05161

    Sarcos Research Corporation proposes to develop a high performance, ActiveShoulderTM military prosthetic system that will enable integration of upper extremity prostheses for performing, to the maximum extent possible, the basic functions of a natural arm. ActiveShoulderTM will be designed for an anatomical range of motions and physiological loads, permitting functional performance exceeding that ...

    SBIR Phase I 2005 Department of DefenseArmy
  6. Light Weight Electronic Pointing Device

    SBC: KVH INDUSTRIES, INC.            Topic: A05199

    In the proposed Phase I effort, KVH Industries will develop an Electronic Pointing Device (EPD) by implementing Northfinding software in its TG6000 Inertial Measurement Unit(IMU) product that is substantially smaller than the existing solution. Specifically, KVH will build three modified coils into a standard TG6000 system, modify the existing gyro digital filter to reduce noise, implement Northfi ...

    SBIR Phase I 2005 Department of DefenseArmy
  7. L-Band High Power Amplifiers for Directed Energy Weapons

    SBC: INNOSYS, INC.            Topic: A05021

    This solicitation calls for research and exploration on approaches to find solutions to high power W-band amplifiers for use in directed energy (DE) weapons that are more affordable and compact and have additional desirable features including low standby power and instant-on capabilities and are, for example, HUMVEE field friendly. In addition the ability to produce such amplifiers in relatively ...

    SBIR Phase I 2005 Department of DefenseArmy
  8. Digital Wound Detection System with Novel Ballistic Impact Sensor

    SBC: STERLING RESEARCH CORPORATION            Topic: A05163

    Sarcos Research Corporation proposes the development of signal and data processing system for the MRMC-developed acoustic wound detector (WD) for soldiers. The data interpretation system will be capable of detecting the impact and the location of the wound and will become an integral part of a physiological monitoring system in the next generation warfighter platform. The proposed novel method o ...

    SBIR Phase I 2005 Department of DefenseArmy
  9. Field Deployable Electroencephalogram (EEG) for Assessing Nonconvulsive Seizures

    SBC: RIPPLE LLC            Topic: A05162

    The goal of this program is to produce a small disposable forehead patch for quickly detecting non-convulsive seizures in an unconscious patient. The patch device will include a small coin battery, surface electrodes, EEG processing electronics, and LED indicators. The patch is activated by removing the adhesive backing tab, and once applied it will display seizure status for several hours as th ...

    SBIR Phase I 2005 Department of DefenseArmy
  10. Flame Resistant Material For Use in Protective Garment Applications

    SBC: NANOSYNTEX            Topic: A05188

    The objective of this proposal is to develop a lightweight, comfortable fire resistant fabric offering superior fire and thermal protection over conventional Nomexr products that can be incorporated into fire protective garments at significantly lower cost. Specific target for this proposal will be to provide a functional material that offers significant increase in personnel protection against a ...

    SBIR Phase I 2005 Department of DefenseArmy
US Flag An Official Website of the United States Government