You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
STAMINA (Survivable Tactical Ad hoc Mobile Network Architectures)
SBC: ARCHITECTURE TECHNOLOGY INC Topic: A04136The FCS (Future Combat Systems), WIN-T (Warfighter Information Network-Tactical), and JTRS (Joint Tactical Radio System) programs have all identified the need for secure and survivable ad hoc wireless tactical networks to support the network centric battlefield environment of the future. To address this need, Architecture Technology Corporation (ATC) will build and demonstrate STAMINA (Survivable ...
SBIR Phase II 2005 Department of DefenseArmy -
ZnO Based Light Emitters for UV/Blue Applications
SBC: SVT ASSOCIATES INC Topic: A04068This Phase II SBIR project addresses the development of novel solid state Zinc Oxide-based light emitting device. These devices will find widespread application in civilian and military markets. The objective of the Phase II is to develop UV/Blue emitters using the CdZnO/ZnO material system. SVT Associates utilize innovative approaches for material epitaxial growth p-type doping and device design. ...
SBIR Phase II 2005 Department of DefenseArmy -
Enhanced Mobility for Small Vehicle Platforms
SBC: AUTONOMOUS SOLUTIONS INC Topic: A03215This SBIR proposal consists of three (3) related research efforts. Research effort 1 will focus on further development of the configurable running gear / shape shifting track concept as started by ASI during the Phase I award. Research effort 2 will focus on the development and completion of the hardware and electronics systems of the T4 robot as started at the Center for Self Organizing and Int ...
SBIR Phase II 2005 Department of DefenseArmy -
Advanced Military Diesel Engine Technologies
SBC: HANSEN ENGINE CORP. Topic: A03233Diesel engines are attractive for military use because of good fuel economy and ability to use JP8-type fuels. However naturally-aspirated (n.a.) diesel engines have low power density, and small diesel engines are not amenable to turbo-charging. To overcome this disadvantage for weight-sensitive applications such as portable generators (gensets), the use of a novel supercharger is proposed. In ...
SBIR Phase II 2005 Department of DefenseArmy -
Artifact Reduced Tomographic Algorithms
SBC: JDLL, INC. Topic: A03019Current computed tomography (CT) techniques for nondestructive testing (NDT) of munitions and other non-medical specimens often produce inferior imagery due to artifacts, impairing detection, identification, and measurement of anomalies. In this Phase II, JDLL generalizes its Phase I artifact-reducing CT algorithms to 3D cone-beam configurations, testing these algorithms against real data, perman ...
SBIR Phase II 2005 Department of DefenseArmy -
Miniature disposable drug infusion pumps with improved safety features and embedded computer control
SBC: STERLING RESEARCH CORPORATION Topic: OSD05H01Sarcos Research Corporation proposes the development of a miniature, disposable, embedded computer-controlled IV infusion pump for administration of drugs during casualty treatment, stabilization and transport on the battlefield. The pump will be based on the Company's proprietary design concepts that enable pumps that are accurate, power efficient, small size, light weight, rugged, and can opera ...
SBIR Phase I 2005 Department of DefenseArmy -
A MEMS Smart Battery Monitoring and Hybrid Power System
SBC: MICRON CORPORATION Topic: A03236A hybrid power system for military vehicles, consisting of a battery status controlled generator for charging and a battery/capacitor hybrid is proposed. The components of the system are controlled by identical MEMS based integrated smart controllers which are integral parts of the battery/capacitor/generator system and communicate wireless with each other, with the dashboard and with maintenance ...
SBIR Phase II 2005 Department of DefenseArmy -
Development of Advanced Military Prosthetic Shoulder System
SBC: STERLING RESEARCH CORPORATION Topic: A05161Sarcos Research Corporation proposes to develop a high performance, ActiveShoulderTM military prosthetic system that will enable integration of upper extremity prostheses for performing, to the maximum extent possible, the basic functions of a natural arm. ActiveShoulderTM will be designed for an anatomical range of motions and physiological loads, permitting functional performance exceeding that ...
SBIR Phase I 2005 Department of DefenseArmy -
Light Weight Electronic Pointing Device
SBC: KVH INDUSTRIES, INC. Topic: A05199In the proposed Phase I effort, KVH Industries will develop an Electronic Pointing Device (EPD) by implementing Northfinding software in its TG6000 Inertial Measurement Unit(IMU) product that is substantially smaller than the existing solution. Specifically, KVH will build three modified coils into a standard TG6000 system, modify the existing gyro digital filter to reduce noise, implement Northfi ...
SBIR Phase I 2005 Department of DefenseArmy -
Geographically-Enabled Augmented Reality System for Dismounted Soldiers
SBC: Primordial, Inc. Topic: A05119To maintain situational awareness during combat operations, dismounted soldiers require access to updated battlefield information. Currently, the United States Army's Land Warrior soldier system provides this information via an opaque monocular display that presents a two-dimensional moving map and battlefield messages. By placing this display over an eye, however, a soldier sacrifices his or he ...
SBIR Phase I 2005 Department of DefenseArmy