You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. HIGH TEMPERATURE EVALUATION OF NEW FERROELASTIC TOUGHENED CERAMIC MATERIALS

    SBC: Technology Holding, LLC            Topic: N/A

    IT IS PROPOSED THAT NEW CERAMIC MATERIALS WITH POTENTIAL FOR STRENGTH AND TOUGHNESS RETENTION TO ELEVATED TEMPERATURES WILL BE FABRICATED AND CHARACTERIZED. THESE NEW CERAMIC MATERIALS EXHIBIT A PHENOMENON KNOWN AS FERROELASTICITY. THE PHENOMENON OF FERROELASTICITY IS VERY SIMILAR TO THAT OF FERROELECTRICITY AND FERROMAGNETISM. THE FERROELASTIC STATE IS CHARACTERIZED BY THE EXISTENCE OF AT LEAST T ...

    SBIR Phase I 1987 Department of DefenseArmy
  2. ELECTRONICALLY STEERABLE AGILE BEAM ANTENNA

    SBC: Technical research Associates, Inc.            Topic: N/A

    TRA PROPOSES THE DEVELOPMENT OF A LOW COST, ELECTRONICALLY STEERABLE AGILE BEAM ANTENNA. PHASE I DEVELOPMENT WILL EXAMINE THE FEASIBILITY OF THE DEVICE CONFIGURED AS FOUR QUARTER WAVE-LENGTH VERTICAL ELEMENTS(OVER A GROUND PLANE), A PIN DIODE SWITCHING AND PHASING ASSEMBLY, A DEDICATED CONTROL MICROCOMPUTER, AND AN INTERFACED TRANSCEIVER OPERATING WITH A DIGITAL COMMUNICATIONS SYSTEM. THE BEAM WIL ...

    SBIR Phase II 1987 Department of DefenseArmy
  3. Enhanced Mobility for Small Vehicle Platforms

    SBC: AUTONOMOUS SOLUTIONS INC            Topic: A03215

    This SBIR proposal consists of three (3) related research efforts. Research effort 1 will focus on further development of the configurable running gear / shape shifting track concept as started by ASI during the Phase I award. Research effort 2 will focus on the development and completion of the hardware and electronics systems of the T4 robot as started at the Center for Self Organizing and Int ...

    SBIR Phase II 2005 Department of DefenseArmy
  4. Sodium-Air Batteries Based on Sodium Super-Ionic Conducting Electrolyte

    SBC: Technology Holding, LLC            Topic: A04052

    High energy density battery will be developed by combining metallic sodium anode with an air cathode. The proposed sodium-air battery is expected to dominate the performance of lithium-air battery. This battery technology is based on sodium conducting solid-electrolyte developed at Ceramatec Inc. The sodium conducting solid-electrolyte has conductivity in the range of 10-2 S/cm at ambient tempera ...

    SBIR Phase I 2005 Department of DefenseArmy
  5. Shelf Life Prediction of Rocket Motors

    SBC: COGNITECH CORPORATION            Topic: A04165

    Stockpiles of weapons with composite rocket motors have been expensive to acquire. In the fortunate occurrence that these weapons are not used, they are too expensive to discard based upon simple expiration dates. However, use of these weapons can be dangerous if their integrity is compromised due to aging and deterioration. CogniTech proposes to build a software suite containing a graphical ...

    SBIR Phase I 2005 Department of DefenseArmy
  6. L-Band High Power Amplifiers for Directed Energy Weapons

    SBC: INNOSYS, INC.            Topic: A05021

    This solicitation calls for research and exploration on approaches to find solutions to high power W-band amplifiers for use in directed energy (DE) weapons that are more affordable and compact and have additional desirable features including low standby power and instant-on capabilities and are, for example, HUMVEE field friendly. In addition the ability to produce such amplifiers in relatively ...

    SBIR Phase I 2005 Department of DefenseArmy
  7. Field Deployable Electroencephalogram (EEG) for Assessing Nonconvulsive Seizures

    SBC: RIPPLE LLC            Topic: A05162

    The goal of this program is to produce a small disposable forehead patch for quickly detecting non-convulsive seizures in an unconscious patient. The patch device will include a small coin battery, surface electrodes, EEG processing electronics, and LED indicators. The patch is activated by removing the adhesive backing tab, and once applied it will display seizure status for several hours as th ...

    SBIR Phase I 2005 Department of DefenseArmy
  8. Advanced multi-axis control system using Blind Source surface EMG

    SBC: RIPPLE LLC            Topic: OSD05T005

    The goal of this program is to use Blind Source Separation (BSS) signal processing techniques to create a novel multi-axis controller for prosthetic limbs based on surface EMG electrode array recordings.

    STTR Phase I 2005 Department of DefenseArmy
  9. Artifact Reduced Tomographic Algorithms

    SBC: JDLL, INC.            Topic: A03019

    Current computed tomography (CT) techniques for nondestructive testing (NDT) of munitions and other non-medical specimens often produce inferior imagery due to artifacts, impairing detection, identification, and measurement of anomalies. In this Phase II, JDLL generalizes its Phase I artifact-reducing CT algorithms to 3D cone-beam configurations, testing these algorithms against real data, perman ...

    SBIR Phase II 2005 Department of DefenseArmy
  10. Frame Rate Hyperspectral Target Segmentation

    SBC: JDLL, INC.            Topic: A04002

    Practical use of hyperspectral imagery for target recognition relies on hardware speed and the ability of algorithms to properly separate (segment) targets from image background in the presence of changing illumination. Recent hardware advances have put frame-rate hyperspectral target segmentation on the horizon. Such applications are computationally intense -- requiring over 200 billion arithme ...

    SBIR Phase I 2005 Department of DefenseArmy
US Flag An Official Website of the United States Government