You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A Verifier for Multicore C11 or C++11 Code

    SBC: The Formula Factory            Topic: 9030177R

    Galois will build a practical, efficient, modular, deductive code verifier and verification methodology for multithread C11 software. The verifier will take code written to the C11 standard, suitably annotated with function contracts, assertions, program/data invariants, ghost data/code, and any platform-specific assumptions beyond those guaranteed by the standard, and will prove that the code mee ...

    SBIR Phase I 2015 Department of CommerceNational Institute of Standards and Technology
  2. High Efficiency, Large-Area, 1550 nm InGaAs Photodiodes

    SBC: VOXTEL, INC.            Topic: N/A

    A back-illuminated planar InGaAs photodiode tested to have 95% quantum effiiency (QE) at 1550 nm, area greater than 1 mm2, low capacitance (125 MHz) will be improved. Although the existing Phase I device exhibited bulk material dark current generation better than commercially available devices, the sidewall-generated dark current was found to dominate the noise equiva ...

    SBIR Phase II 2010 Department of CommerceNational Institute of Standards and Technology
  3. Decision Support Tools for Sustainable Manufacturing

    SBC: BIMCON Inc.            Topic: N/A

    The objective of this proposal is to establish the feasibility of developing an integrated decision support tool that transforms the current time-consuming and reactive (post-design) sustainability assessment into a real-time, proactive approach available in the early phases of product design. This tool, called Sustainability Integrated into Early Design (SIED), will define and capture lifecycle-w ...

    SBIR Phase I 2010 Department of CommerceNational Institute of Standards and Technology
US Flag An Official Website of the United States Government