You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
USB Firewall for Direct Connect USB Cyber Warfare Protection
SBC: CYBERNET SYSTEMS CORPORATION Topic: A10130Malware spreading from unprotected USB ports has been increasing for several years, resulting in a complete ban on using USB external devices on Army computers. As administrators have locked down auto-execute on Windows and other OSes, attackers have changed to spoofing hardware components, opening multiple devices (allowable under USB specs), and even exploiting holes in kernel drivers be sending ...
SBIR Phase I 2010 Department of DefenseArmy -
Enhanced Light Absorption in thin InGaN Layers for Radiation Hard Solar Cells Using Nano-Patterned Metallic Films
SBC: RoseStreet Laboratories Topic: SB092017We propose to develop and deliver a nano-patterned metallic light trap platform that will allow ultra-thin InGaN photovoltaics to exhibit extended lifetime by a factor of four when used in low orbit satellite operations. We will test the enhancement of light absorption in InGaN layers with In fraction of 25% for use as an effective method of realizing radiation ultra-hard solar cells for space-ba ...
SBIR Phase II 2010 Department of DefenseDefense Advanced Research Projects Agency -
Hybrid Impeller Disk for High Pressure Compressor Configurations in Future Turboshaft Engines
SBC: Keystone Synergistic Enterprises, LLC Topic: A10147Keystone Synergistic Enterprises, Inc. proposes to use induction heating to create a hot zone in the rim of radial impellers so that the rim of the rotors will be preferentially heated above the gamma prime solvus. This will cause the formation of a dual property microstructure in the impeller. A fine grain size, established by either the forging temperature will be maintained in the hub of the ro ...
SBIR Phase I 2010 Department of DefenseArmy -
Pulse Current Assisted Heat Treatment for Impeller Disks
SBC: ATS-MER, LLC Topic: A10147Advanced turboshaft engine impeller disks work at a high rotational speed at elevated temperatures which vary from the disk rim to its bore. Due to contact with combustion gases, the rim possesses a significantly greater temperature than the bore. This temperature gradient implies different requirements for the mechanical properties of the material in the rim and bore areas. A nickel based superal ...
SBIR Phase I 2010 Department of DefenseArmy -
Cast Encapsulation of Unfinished Ceramic Armor Tiles
SBC: REL, INC. Topic: A10063Presently, the Army experiences numerous problems with existing manufacturing processes for the metal encapsulation of ceramic tiles within the current inventory of armor solutions. REL, Inc. will address the specific problems of directly casting the encapsulated ceramic structure to net/near net shape and the high cost of ceramic tile finishing practices currently required for existing ceramic p ...
SBIR Phase I 2010 Department of DefenseArmy -
VLWIR HgCdTe FPA Reliability and Yield Enhancement through Nanostructural Analysis
SBC: FABMETRIX INC Topic: MDA08013The state-of-the-art FPA manufacturing technologies commonly generate some critical defects in the pixel elements, which adversely impact their operability and reliability. In Phase I, the feasibility of identifying, analyzing, and on exemplary basis, eliminating these defects indirectly through nanostructural analysis was demonstrated. In Phase II, this defect analysis and correlation approach ...
SBIR Phase II 2010 Department of DefenseMissile Defense Agency -
Design Tools For Highly Regular Circuit Geometries
SBC: systemIC Topic: SB102003We propose to develop a comprehensive mixed-signal design solution with an IP infrastructure, design methodology and design automation tools to enable the use of regular fabrics and mask re-use. The IP infrastructure will consist of metal-reconfigurable analog/RF templates built on top of the existing PDF Solutions’ pdBrixTM solution. The design methodology will allow designers to achieve perfor ...
SBIR Phase I 2010 Department of DefenseDefense Advanced Research Projects Agency -
Countermeasures to Malicious Hardware to Improve Software Protection Systems
SBC: Clear Hat Consulting, Inc. Topic: OSD10IA1Security concerns are driving the research and development of innovative techniques designed to detect, prevent, and respond to sophisticated threats in COTS hardware and firmware components. Because of the size and breadth of the attack surface, Clear Hat proposes to limit the scope of their research for this Phase I effort to malicious firmware alterations on disk based storage devices. To da ...
SBIR Phase I 2010 Department of DefenseAir Force -
Closed-Loop Fire Control (CLFC) for Small Caliber Weapons
SBC: CYBERNET SYSTEMS CORPORATION Topic: A10040A good method for improving the survivability of soldiers on the ground is to help ensure that threats can be eliminated quickly before posing a significant threat. One way to accomplish this is to ensure that shots fired by soldiers hit targets quickly and efficiently. A soldier’s preference is to impact the target with the first shot. However, there is a complex set of factors that dictate whe ...
SBIR Phase I 2010 Department of DefenseArmy -
Vocabulary Intelligence, Surveillance and Reconnaissance (V-ISR)
SBC: MODUS OPERANDI, INC. Topic: A08168The Army has recognized that its intelligence analysts are being swamped by the tremendous amounts of unstructured textual data they must try to manually process. While a number of systems have been developed to automatically extract information from text, these systems have suffered from the problem of requiring analysts to manually define and maintain lists of terms and phrases. What is needed ...
SBIR Phase II 2010 Department of DefenseArmy