You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Large-Area, High-Uniformity Photodiodes for Infrared Trap Detectors
SBC: AMETHYST RESEARCH INC Topic: 9020168Rmethyst Research Inc. will design, fabricate and test a high uniformity, large area, low noise infrared trap-detector detector for the 1- 4.5 μm wavelength range. This state of the art detector will have a large area (e.g., 1-1.8 cm diameter active area) with a spatial variability of internal quantum efficiency of less than 0.1 % between 1 μm and 4.5 μm. In addition, the internal quantum effici ...
SBIR Phase I 2015 Department of CommerceNational Institute of Standards and Technology -
A Tool for Building Semantically Interoperable Specification and Standards
SBC: XSB INC Topic: 9010273RStandards and specifications are widely used in government and industry to define requirements for products and processes and insure interoperability, safety, and quality of industrial and domestic products. Specifications and standards documents almost always cross-reference other standards and specification. Taken together, the web of interdependent standards forms an immensely important knowled ...
SBIR Phase I 2015 Department of CommerceNational Institute of Standards and Technology -
RISK-BASED ANALYSIS OF TECHNICAL SPECIFICATIONS
SBC: Applied Biomathematics Inc Topic: N/AN/A
SBIR Phase I 1987 Nuclear Regulatory Commission -
A FUZZY SET APPROACH FOR SEISMIC SAFETY MARGINS ASSESSMENT.
SBC: Eda Consultants Topic: N/ATHE CONTRACTOR SHALL DEVELOP A FUZZY SET METHODOLOGY FOR UNCERTAINTY ANALYSIS IN PROBABILISTIC SEISMIC SAFETY ASSESSMENT OF NUCLEAR POWER PLANTS. FUZZY SET LOGIC WILL BEUSED FOR COLLECTING, QUANTIFYING AND PROPAGATING SUBJECTIVE,ENGINEERING JUDGEMENT USED IN THE UNCERTAINTY ANALYSIS. IN PHASE I, FEASIBILITY OF THE PROPOSED APPROACH WILL BE DEMONSTRATED BY APPLYING IT TO SELECTED PARTS OF A PROBABI ...
SBIR Phase I 1987 Nuclear Regulatory Commission -
DEVELOP AN INHALATION SCREENING DOSE MONITOR FOR WORKERS AT NUCLEAR POWER PLANTS
SBC: Mikayola International Topic: N/AAN "INHALATION SCREENING DOSE COLLAR-STANCHION MONITOR" WITHEMBEDDED MINIATURE THIN-WALL GEIGER-MUELLER RADIATION DETECTORS EVALUATES THE THYROID GLAND FOR NANOCURIE ACTIVITYINVENTORY. THE PRIMARY TECHNICAL OBJECTIVE IS TO ESTABLISH THAT THE "COLLAR-STANCHION MONITOR" WILL BE CAPABLE OF DETECTING WITHIN 15 SECONDS AND WITH 2 SIGMA CONFIDENCE AN ACTIVITY INVENTORY OF 0.7 NANOCURIES OF I-131 DOSE EQ ...
SBIR Phase I 1987 Nuclear Regulatory Commission -
PREDICTION OF CHECK VALVE PERFORMANCE & DEGRADATION IN NUCLEAR POWER PLANT SYSTEMS
SBC: KALSI ENGINEERING, INC Topic: N/AN/A
SBIR Phase I 1987 Nuclear Regulatory Commission