You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
PROGRAMMABLE REFLECTANCE OF ARTIFICIAL FLAWS IN RAIL MATERIALS
SBC: REINHART & ASSOC., INC. Topic: N/AA PROGRAMMABLE DEFECT SIMULATOR IS NEEDED TO TEST ULTRASONIC RAIL FLAW DETECTION SYSTEMS. CALIBRATION STANDARDS CAN BE DEVELOPED WITH VARIABLE PHYSICAL CHARACTERISTICS ACCORDING TO A PREDESCRIBED SCHEME THAT SIMULATES COMMONLY-OCCURRING FLAWS (CROSS-HEAD FATIGUE CRACKS) IN RAILWAY SYSTEM RAILS. THIS PROJECT WOULD DEVELOP A METHOD OF ALTERING THE EFFECTIVE REFLECTIVITY OF A SOLID-GAS INTERFACE THRO ...
SBIR Phase I 1987 Department of Transportation -
URBAN TRANSIT COST RECOVERY FEASIBILITY STUDY
SBC: Williams-kuebelbeck & Assc Inc Topic: N/AURBAN TRANSIT IMPROVEMENTS ENHANCE THE VALUE OF THE PROPERTY THEY SERVE. TRADITIONAL URBAN TRANSIT FINANCING TECHNIQUES NEGLECT THIS POTENTIAL SOURCE OF REVENUE. BENEFIT ASSESSMENT DISTRICTS AND IMPACT MITIGATION FEES, BASED ON CONCEPTS ORIGINALLY DEVISED FOR MINOR IMPROVEMENTS (EG. SIDEWALKS), HAVE BEEN APPLIED EXPERIMENTALLY TO URBAN TRANSIT, BUT DO NOT GENERATE THE MAJOR FUNDING URBAN TRANSIT R ...
SBIR Phase I 1987 Department of Transportation