You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.
-
A FUZZY SET APPROACH FOR SEISMIC SAFETY MARGINS ASSESSMENT.
SBC: Eda Consultants Topic: N/ATHE CONTRACTOR SHALL DEVELOP A FUZZY SET METHODOLOGY FOR UNCERTAINTY ANALYSIS IN PROBABILISTIC SEISMIC SAFETY ASSESSMENT OF NUCLEAR POWER PLANTS. FUZZY SET LOGIC WILL BEUSED FOR COLLECTING, QUANTIFYING AND PROPAGATING SUBJECTIVE,ENGINEERING JUDGEMENT USED IN THE UNCERTAINTY ANALYSIS. IN PHASE I, FEASIBILITY OF THE PROPOSED APPROACH WILL BE DEMONSTRATED BY APPLYING IT TO SELECTED PARTS OF A PROBABI ...
SBIR Phase I 1987 Nuclear Regulatory Commission -
PREDICTION OF CHECK VALVE PERFORMANCE & DEGRADATION IN NUCLEAR POWER PLANT SYSTEMS
SBC: Kalsi Engineering, Incorporated Topic: N/AN/A
SBIR Phase I 1987 Nuclear Regulatory Commission -
PROGRAMMABLE REFLECTANCE OF ARTIFICIAL FLAWS IN RAIL MATERIALS
SBC: REINHART & ASSOC., INC. Topic: N/AA PROGRAMMABLE DEFECT SIMULATOR IS NEEDED TO TEST ULTRASONIC RAIL FLAW DETECTION SYSTEMS. CALIBRATION STANDARDS CAN BE DEVELOPED WITH VARIABLE PHYSICAL CHARACTERISTICS ACCORDING TO A PREDESCRIBED SCHEME THAT SIMULATES COMMONLY-OCCURRING FLAWS (CROSS-HEAD FATIGUE CRACKS) IN RAILWAY SYSTEM RAILS. THIS PROJECT WOULD DEVELOP A METHOD OF ALTERING THE EFFECTIVE REFLECTIVITY OF A SOLID-GAS INTERFACE THRO ...
SBIR Phase I 1987 Department of Transportation