You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.

  1. A FUZZY SET APPROACH FOR SEISMIC SAFETY MARGINS ASSESSMENT.

    SBC: Eda Consultants            Topic: N/A

    THE CONTRACTOR SHALL DEVELOP A FUZZY SET METHODOLOGY FOR UNCERTAINTY ANALYSIS IN PROBABILISTIC SEISMIC SAFETY ASSESSMENT OF NUCLEAR POWER PLANTS. FUZZY SET LOGIC WILL BEUSED FOR COLLECTING, QUANTIFYING AND PROPAGATING SUBJECTIVE,ENGINEERING JUDGEMENT USED IN THE UNCERTAINTY ANALYSIS. IN PHASE I, FEASIBILITY OF THE PROPOSED APPROACH WILL BE DEMONSTRATED BY APPLYING IT TO SELECTED PARTS OF A PROBABI ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
  2. MOTION COMPENSATING SCALE

    SBC: General Oceanics Inc            Topic: N/A

    THE AIM OF THIS PROJECT IS TO DEVELOP A SCALE FOR WEIGHING LOADS OF UP TO 100 KG. ON MOVING PLATFORMS SUCH AS SHIPS. THE PROBLEM IN THESE SITUATIONS IS THAT ACCELERATION FORCES GENERATED BY THE MOTION OF THE VEHICLE CONSTANTLY VARY THE APPARENT WEIGHT OF ANY OBJECT RESTING ON THE SCALE. THE SOLUTION PROPOSED HERE IS TO USE AN ELECTRONIC SCALE AND COMBINE ITS ELECTRICAL OUTPUT SIGNAL WITH SIGNALS F ...

    SBIR Phase I 1987 Department of Commerce
  3. PREDICTION OF CHECK VALVE PERFORMANCE & DEGRADATION IN NUCLEAR POWER PLANT SYSTEMS

    SBC: Kalsi Engineering, Incorporated            Topic: N/A

    N/A

    SBIR Phase I 1987 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government