You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ADVANCED SCANNING TUNNELING MICROSCOPE

    SBC: R D Young Consultants Inc            Topic: N/A

    THE SCANNING TUNNELING MICROSCOPE IS AN EVOLVING INSTRUMENT FOR MICROTOPOGRAPHIC MAPPING AND CHEMICAL ANALYSIS OF REFINED SURFACES WITH RESOLUTION ON THE ATOMIC SCALE. THE GOAL OF THIS CONTRACT IS TO PROVIDE A NEW AND INNOVATIVE DESIGN FOR THE STM, EXTENDING ITS FLEXIBILITY AND ACCURACY. MORE SPECIFICALLY, THE DESIGN GOALS ARE: 1) TO PROVIDE A COMPACT INSTRUMENT SUITABLE FOR VACUUM FLANGE MOUNTING ...

    SBIR Phase I 1987 Department of Commerce
  2. A FUZZY SET APPROACH FOR SEISMIC SAFETY MARGINS ASSESSMENT.

    SBC: Eda Consultants            Topic: N/A

    THE CONTRACTOR SHALL DEVELOP A FUZZY SET METHODOLOGY FOR UNCERTAINTY ANALYSIS IN PROBABILISTIC SEISMIC SAFETY ASSESSMENT OF NUCLEAR POWER PLANTS. FUZZY SET LOGIC WILL BEUSED FOR COLLECTING, QUANTIFYING AND PROPAGATING SUBJECTIVE,ENGINEERING JUDGEMENT USED IN THE UNCERTAINTY ANALYSIS. IN PHASE I, FEASIBILITY OF THE PROPOSED APPROACH WILL BE DEMONSTRATED BY APPLYING IT TO SELECTED PARTS OF A PROBABI ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
  3. AUTOMATED USER FEEDBACK AND INFORMATION REQUEST DATABASE DEVELOPED FOR A PC

    SBC: Dvp, Inc.            Topic: N/A

    HISTORICALLY, DATABASE MANAGEMENT HAS BEEN A TASK FOR EXPERTS, AND DATABASE MANAGEMENT SYSTEMS (DBMS) HAVE RESIDEDLARGELY ON MAINFRAME COMPUTERS. TODAY, HOWEVER, WITH THE TREMENDOUS VARIETY OF USER-FRIENDLY SOFTWARE, THE POWER OF MICROCOMPUTER HARDWARE, AND THE STORAGE CAPACITY OF PERIPHERALS, MANY DATABASES INITIALLY ESTABLISHED ON MAINFRAME MAY NOW PRACTICALLY BE INSTALLED ON PERSONAL COMPUTERS. ...

    SBIR Phase I 1987 Department of Commerce
  4. DEVELOPMENT OF VISUAL INSTRUCTION MATERIALS FOR MATH AND SCIENCE CURRICULUM USING THE TOPOLOGICAL PANORAMA CAMERA

    SBC: Janet Gelphman Photography            Topic: N/A

    LEARNING ABILITIES IN MATHEMATICS AND THE SCIENCES ARE NOT MAXIMIZED BECAUSE OF THE LACK OF VISUAL INSTRUCTIONAL MATERIALS. THE IMPROVEMENT OF THESE SKILLS IS IMPORTANT BECAUSE BETTER SCIENCE AND MATH ABILITIES ARE NEEDED IN THE UNITED STATES IN ORDER TO KEEP UP WITH OTHER INDUSTRIALIZED NATIONS. OUR PROPOSED SOLUTION IS TO USE A NEW TECHNOLOGY, THE TOPOLOGICAL PANORAMA CAMERA, TO CREATE COST-EFFE ...

    SBIR Phase I 1987 Department of Education
  5. INTEGRATED, INTELLIGENT AND INTERACTIVE TELECOMMUNICATION SYSTEM FOR HEARING/SPEECH IMPAIRED PERSONS

    SBC: Integrated Microcomputer Sys            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of Education
  6. MOTION COMPENSATING SCALE

    SBC: General Oceanics Inc            Topic: N/A

    THE AIM OF THIS PROJECT IS TO DEVELOP A SCALE FOR WEIGHING LOADS OF UP TO 100 KG. ON MOVING PLATFORMS SUCH AS SHIPS. THE PROBLEM IN THESE SITUATIONS IS THAT ACCELERATION FORCES GENERATED BY THE MOTION OF THE VEHICLE CONSTANTLY VARY THE APPARENT WEIGHT OF ANY OBJECT RESTING ON THE SCALE. THE SOLUTION PROPOSED HERE IS TO USE AN ELECTRONIC SCALE AND COMBINE ITS ELECTRICAL OUTPUT SIGNAL WITH SIGNALS F ...

    SBIR Phase I 1987 Department of Commerce
  7. PREDICTION OF CHECK VALVE PERFORMANCE & DEGRADATION IN NUCLEAR POWER PLANT SYSTEMS

    SBC: KALSI ENGINEERING, INC            Topic: N/A

    N/A

    SBIR Phase I 1987 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government