You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
ACOUSTO-OPTIC PROCESSOR FOR SYNTHETIC APERTURE RADAR
SBC: Photonic Systems, Inc. Topic: N/APROCESSING OF SAR DATA IN REAL TIME REQUIRES HIGH SPEED COMPUTATION DEVICES CURRENTLY BEYOND THE STATE-OF-THE-ART OF CONVENTIONAL METHODS. DESIRED PROCESSORS MUST ALSO BE SMALL, RUGGED AND LOW POWER TO BE DEPLOYED ON AIRCRAFT. OPTICAL TECHNIQUES CAN SATISFY THESE REQUIREMENTS WITH IMAGINATIVE ARCHITECTURES. THIS PROPOSAL PRESENTS AN INNOVATIVE APPROACH FOR REAL TIME SAR IMAGE RECONSTRUCTION THAT C ...
SBIR Phase I 1987 Department of DefenseAir Force -
ADVANCED CONTINUUM MECHANICS WORKSTATION DEVELOPMENT: SUBSYSTEM (HULL)
SBC: Orlando Technology Inc Topic: N/ATHIS PROGRAM IS TO EVALUATE THE FEASIBILITY OF DEVELOPING A PARALLEL HARDWARE/SOFTWARE SUBSYSTEM FOR RUNNING A PARALLEL VERSION OF THE HULL CODE. THE HARDWARE INTERFACE WOULD BE THE VME BUS. THE SOFTWARE INTERFACE ASSUMES UNIX V.X OR BSD 4.X. IMPLEMENTATION WOULD BE ON EXISTING BOARD-LEVEL HARDWARE COMPONENTS. IF FEASIBLE, THIS SYSTEM WOULD BE DEMONSTRATED DURING PHASE II ON A COMPLETE WORKSTATION ...
SBIR Phase I 1989 Department of DefenseAir Force -
ADVANCED FACILITIES TO EXPEDITE DESIGN AND EVALUATION OF COMMUNICATIONS SYSTEMS
SBC: Information Research Topic: N/ATHE TECHNICAL OBJECTIVE OF THIS PROJECT IS TO ESTABLISH THE FEASILBILITY OF SATISFYING THE REQUIREMENTS OF THE U.S. ARMY COMMUNICATIONS ELECTRONICS COMMAND (CECOM) FOR RAPID AND EFFECTIVE MODELING OF U.S. ARMY COMMUNICATION SYSTEMS. THE METHOD WE PROPOSE FOR SATISFYING THESE REQUIREMENTS IS TO ADAPT A TOP-DOWN DESIGN SYSTEM FOR ELECTRONIC SYSTEMS BEING DEVELOPED FOR THE U.S. NAVY TO MODEL-ING OF C ...
SBIR Phase I 1987 Department of DefenseArmy -
ADVANCED RADIOGRAPHIC TECHNIQUES UTILIZING A SOLID-STATE ELECTRONIC IMAGER
SBC: General Imaging Corp. Topic: N/ANONDESTRUCTIVE EVALUATION OF MUNITIONS PRESENTS SPECIAL PROBLEMS THAT CANNOT BE SOLVED WITH CONVENTIONAL TECHNIQUES. AN ELECTRONIC X-RAY IMAGING SYSTEM WILL BE STUDIED TO DETERMINE THE FEASIBILITY OF ITS USE IN ADVANCED RADIOGRAPHIC IMAGING TECHNIQUES SUCH AS REMOTE ON-LINE INSPECTION, MULTISPECTRAL RADIOGRAPHY AND BACKSCATTER TOMOGRAPHY.
SBIR Phase I 1987 Department of DefenseAir Force -
ADVANCED SENSORS FOR CLOSE PROXIMITY ROBOTIC MINE DETECTION
SBC: Coleman Research Corp. Topic: N/AN/A
SBIR Phase I 1987 Department of DefenseArmy -
ADVANCED SYSTEMS AND CONCEPTS FOR FUTURE NAVAL WARFARE
SBC: Trymer Company Topic: N/AN/A
SBIR Phase I 1989 Department of DefenseNavy -
A FUZZY SET APPROACH FOR SEISMIC SAFETY MARGINS ASSESSMENT.
SBC: Eda Consultants Topic: N/ATHE CONTRACTOR SHALL DEVELOP A FUZZY SET METHODOLOGY FOR UNCERTAINTY ANALYSIS IN PROBABILISTIC SEISMIC SAFETY ASSESSMENT OF NUCLEAR POWER PLANTS. FUZZY SET LOGIC WILL BEUSED FOR COLLECTING, QUANTIFYING AND PROPAGATING SUBJECTIVE,ENGINEERING JUDGEMENT USED IN THE UNCERTAINTY ANALYSIS. IN PHASE I, FEASIBILITY OF THE PROPOSED APPROACH WILL BE DEMONSTRATED BY APPLYING IT TO SELECTED PARTS OF A PROBABI ...
SBIR Phase I 1987 Nuclear Regulatory Commission -
A LOW-COST SIMULATION-BASED ATC TRAINER
SBC: Wesson International Inc. Topic: N/ATHE CONSTRUCTION OF AN IBM PC-COMPATIBLE AIR TRAFFIC CONTROL TRAINING SYSTEM WITH COMPLETE VOICE INPUT AND OUTPUT IS PROPOSED. THIS SYSTEM, BUILT UPON AN UNDER-$10,000 HARDWARE PLATFORM, WILL BE CAPABLE OF DISPLAYING A REALTIME RADARSCOPE PICTURE OF ANY GEOGRAPHICAL SECTOR IN THE MILITARY OR CIVILIAN ENVIRONMENT. THE SIMULATOR WILL BE CAPABLE OF GENERATING REALISTIC TRAFFIC FLOWS FOR THE SECTOR CH ...
SBIR Phase I 1989 Department of DefenseAir Force -
AN ACTIVE NECK PROTECTION SYSTEM FOR CREWMEMBERS OF HIGH PERFORMANCE AIRCRAFT
SBC: Biodynamic Research Corporation Topic: N/ANECK STRAINS ARE FREQUENT AND NECK FRACTURES ARE OCCASIONALLY EXPERIENCED AMONG PILOTS AND HIGH PERFORMANCE AIRCRAFT. CURRENT ACCELERATION PROTECTION TECHNIQUES HAVE CONCENTRATED ON PHYSIOLOGICAL PROTECTION AND LARGELY IGNORE NECK PROTECTION REQUIREMENTS. PREVIOUSLY PROPOSED NECK PROTECTION SCHEMES PRIMARILY RELY UPON LIMITING HEAD DISPLACEMENTS, LEADING TO UNACCEPTABLE OPERATIONAL LIMITATIONS. TH ...
SBIR Phase I 1989 Department of DefenseAir Force -
AN ADDRESSING TECHNIQUE FOR U.S. NAVY TRAFFIC IN A MULTIMEDIA ENVIRONMENT
SBC: Lightbus Technology Inc Topic: N/APROPOSES DEVELOPMENT OF A ROUTINE TABLE ACCESS METHOD WHICH TREATS NETWORK ADDRESSES AS VARIABLE LENGTH OCTET STRINGS WITHOUT INTERNAL STRUCTURE 0 I.E. AS FLAT ADDRESSE - TO SIMPLIFY THE HANDLING OF MOBIL END-SYSTEM SIMULTANEOUSLY CONNECTED TO MULTIPLE ACCESS POINTS. SPECIFIC ROUTING TABLE ACCESS AND MANAGEMENT TECHNIQUES ARE PROPOSED WHICH ALLOW RAPID ACCESS IN A SINGLE PROBE WHILE LIMITING THE S ...
SBIR Phase I 1989 Department of DefenseNavy