You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A FUZZY SET APPROACH FOR SEISMIC SAFETY MARGINS ASSESSMENT.

    SBC: Eda Consultants            Topic: N/A

    THE CONTRACTOR SHALL DEVELOP A FUZZY SET METHODOLOGY FOR UNCERTAINTY ANALYSIS IN PROBABILISTIC SEISMIC SAFETY ASSESSMENT OF NUCLEAR POWER PLANTS. FUZZY SET LOGIC WILL BEUSED FOR COLLECTING, QUANTIFYING AND PROPAGATING SUBJECTIVE,ENGINEERING JUDGEMENT USED IN THE UNCERTAINTY ANALYSIS. IN PHASE I, FEASIBILITY OF THE PROPOSED APPROACH WILL BE DEMONSTRATED BY APPLYING IT TO SELECTED PARTS OF A PROBABI ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
  2. Development of a Nemeth math to Latex backtranslator system

    SBC: Logical Software Solutions            Topic: N/A

    N/A

    SBIR Phase I 2002 Department of Education
  3. DEVELOPMENT OF VISUAL INSTRUCTION MATERIALS FOR MATH AND SCIENCE CURRICULUM USING THE TOPOLOGICAL PANORAMA CAMERA

    SBC: Janet Gelphman Photography            Topic: N/A

    LEARNING ABILITIES IN MATHEMATICS AND THE SCIENCES ARE NOT MAXIMIZED BECAUSE OF THE LACK OF VISUAL INSTRUCTIONAL MATERIALS. THE IMPROVEMENT OF THESE SKILLS IS IMPORTANT BECAUSE BETTER SCIENCE AND MATH ABILITIES ARE NEEDED IN THE UNITED STATES IN ORDER TO KEEP UP WITH OTHER INDUSTRIALIZED NATIONS. OUR PROPOSED SOLUTION IS TO USE A NEW TECHNOLOGY, THE TOPOLOGICAL PANORAMA CAMERA, TO CREATE COST-EFFE ...

    SBIR Phase I 1987 Department of Education
  4. Emergency preparedness training software with universal access

    SBC: VCOM3D INC            Topic: N/A

    N/A

    SBIR Phase I 2002 Department of Education
  5. Integration of Academics and CTE: Interactive Teaching Modules for Mathematics

    SBC: CCI Publishing            Topic: N/A

    N/A

    SBIR Phase I 2002 Department of Education
  6. PREDICTION OF CHECK VALVE PERFORMANCE & DEGRADATION IN NUCLEAR POWER PLANT SYSTEMS

    SBC: KALSI ENGINEERING, INC            Topic: N/A

    N/A

    SBIR Phase I 1987 Nuclear Regulatory Commission
  7. RESEARCH AND DEVELOPMENT OF MODELS, GUIDES AND PLANS FOR HANDICAPPED POPULATIONS.

    SBC: Fineblum Educ Serv Inc            Topic: N/A

    THIS PROPOSAL WILL IDENTIFY PRESENT COLLABORATIVE PRACTICES BY SURVEYING HEALTH/EDUCATION COMMITTEES OF THE FIFTY STATES' INTERAGENCY COMMITTEES. POLICY IMPLEMENTATION, TRAINING PROGRAMMING, INFANT AND FAMILY SERVICES, INTRACOMMITTEE MECHANICS, LEAD AGENCY SELECTION, AND OTHER INTERAGENCY FUNCTIONS ARE DETAILED. A DELPHI PROCEDURE WILL BE UTILIZED WITH IDENTIFIED EXEMPLARY COMMITTEES TO ELICIT THE ...

    SBIR Phase I 1987 Department of Education
  8. SingSync: Software Tools for Synchronizing Sign language access to digital multimedia

    SBC: VCOM3D INC            Topic: N/A

    N/A

    SBIR Phase I 2002 Department of Education
  9. Toward Value-Added Productivity Analysis and Reporting

    SBC: STATPOINT, LLC.            Topic: N/A

    N/A

    SBIR Phase I 2002 Department of Education
  10. Virtual Interviews Exercises for Workplace Success

    SBC: VCOM3D INC            Topic: N/A

    N/A

    SBIR Phase I 2002 Department of Education
US Flag An Official Website of the United States Government