You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
ADVANCED ADAPTIVE COMPUTATIONAL METHODS FOR NAVIER-STOKES SIMULATIONS IN ROTORCRAFT AERODYNAMICS
SBC: Computational Mechan Topic: N/AN/A
SBIR Phase I 1988 Department of DefenseArmy -
ADVANCED FACILITIES TO EXPEDITE DESIGN AND EVALUATION OF COMMUNICATIONS SYSTEMS
SBC: Information Research Topic: N/ATHE TECHNICAL OBJECTIVE OF THIS PROJECT IS TO ESTABLISH THE FEASILBILITY OF SATISFYING THE REQUIREMENTS OF THE U.S. ARMY COMMUNICATIONS ELECTRONICS COMMAND (CECOM) FOR RAPID AND EFFECTIVE MODELING OF U.S. ARMY COMMUNICATION SYSTEMS. THE METHOD WE PROPOSE FOR SATISFYING THESE REQUIREMENTS IS TO ADAPT A TOP-DOWN DESIGN SYSTEM FOR ELECTRONIC SYSTEMS BEING DEVELOPED FOR THE U.S. NAVY TO MODEL-ING OF C ...
SBIR Phase I 1987 Department of DefenseArmy -
ADVANCED SENSORS FOR CLOSE PROXIMITY ROBOTIC MINE DETECTION
SBC: Coleman Research Corp. Topic: N/AN/A
SBIR Phase I 1987 Department of DefenseArmy -
A FUZZY SET APPROACH FOR SEISMIC SAFETY MARGINS ASSESSMENT.
SBC: Eda Consultants Topic: N/ATHE CONTRACTOR SHALL DEVELOP A FUZZY SET METHODOLOGY FOR UNCERTAINTY ANALYSIS IN PROBABILISTIC SEISMIC SAFETY ASSESSMENT OF NUCLEAR POWER PLANTS. FUZZY SET LOGIC WILL BEUSED FOR COLLECTING, QUANTIFYING AND PROPAGATING SUBJECTIVE,ENGINEERING JUDGEMENT USED IN THE UNCERTAINTY ANALYSIS. IN PHASE I, FEASIBILITY OF THE PROPOSED APPROACH WILL BE DEMONSTRATED BY APPLYING IT TO SELECTED PARTS OF A PROBABI ...
SBIR Phase I 1987 Nuclear Regulatory Commission -
A NEURAL NETWORK KALMAN FILTER FOR MULTI-SENSOR BASED ROBOTIC CONTROL
SBC: MARTINGALE RESEARCH CORPORATION Topic: N/AN/A
SBIR Phase I 1988 Department of DefenseArmy -
ARTIFICIAL INTELLIGENCE FOR LOGISTICS PLANNING SYSTEMS
SBC: Lb&m Assoc., Inc. Topic: N/AN/A
SBIR Phase I 1988 Department of DefenseArmy -
AUTOMATED REUSABLE COMPONENT SYSTEM (ARCS)
SBC: MODUS OPERANDI, INC. Topic: N/AN/A
SBIR Phase I 1987 Department of DefenseArmy -
BALLISTIC FACE SHIELD WITH DEICING/DEFOGGING CAPABILITIES IN EXTREME CLIMATE
SBC: Polytronix Inc Topic: N/AN/A
SBIR Phase I 1987 Department of DefenseArmy -
BARRIERLESS ULTRASONIC AIR CLEANER
SBC: Taylor S R & Assocs Topic: N/AMILITARY VEHICLE AIR CLEANER SYSTEM PERFORMANCE CAN BE EVALUATED IN SEVERAL WAYS, HOWEVER, ONE OF THE MOST IMPORTANT PERFORMANCE CONSIDERATIONS IS SERVICE LIFE. TODAY, AIR CLEANERS REQUIRE FREQUENT SERVICING IN DUSTY CONDITIONS AND POSE A CONTAMINATION RISK FACTOR TO MEDIA MATERIAL AND MAINTENANCE PERSONNEL DURING CLEANING IN AN NBC ENVIRONMENT. IN FACT, IT IS THIS PARAMETER THAT HAS LED TO THE US ...
SBIR Phase I 1987 Department of DefenseArmy -
BONDING TO UNPREPARED SURFACES
SBC: TEXAS RESEARCH INSTITUTE , AUSTIN, INC. Topic: N/ATHIS PROPOSAL DESCRIBES AN SBIR PROJECT TO PREPARE NOVEL PRIMERS FOR BONDING TO UNPREPARED HYDROPHILIC SUBSTRATES SUCH AS STEEL, ALUMINUM, AND TITANIUM AND TO COMPOSITES. THE PRIMERS WILL BE PREPARED FROM ORGANOFUNCTIONAL SILANE AND ZIRCO-ALUMINATE COUPLING AGENTS AND FROM POLYMERIZABLE PHOSPHATE COMPOUNDS AND WILL BE DESIGNED TO REACT WITH MOISTURE AT THE SUBSTRATE SURFACE AND TO REPEL ADDITIONAL ...
SBIR Phase I 1988 Department of DefenseArmy