You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ADVANCED COMPUTER INTEGRATED WIRELESS BI-DIRECTIONAL GROUP RESPONSE SYSTEM

    SBC: Computer Enhanced Tech            Topic: N/A

    THE POWER OF INSTANT FEEDBACK IN STIMULATING LEARING HAS BEEN WELL DEMONSTRATED IN THE EDUCATIONAL COMMUNITY, BUT MODERN TECHNOLOGY HAS BEEN SLOW IN PRODUCING A PRACTICAL, RELIABLE AND COST-EFFECTIVE METHOD OF PROVIDING SUCH FEEDBACK IN THE CLASSROOM. WE PROPOSE TO DEVELOP A SYSTEM WHICH UTILIZES CURRENT TECHNOLOGY TO ENHANCE THE LEARNING SITUATION FOR THE PUPIL AND INCREASE THE EFFICIENCY OF THE ...

    SBIR Phase I 1987 Department of Education
  2. A FUZZY SET APPROACH FOR SEISMIC SAFETY MARGINS ASSESSMENT.

    SBC: Eda Consultants            Topic: N/A

    THE CONTRACTOR SHALL DEVELOP A FUZZY SET METHODOLOGY FOR UNCERTAINTY ANALYSIS IN PROBABILISTIC SEISMIC SAFETY ASSESSMENT OF NUCLEAR POWER PLANTS. FUZZY SET LOGIC WILL BEUSED FOR COLLECTING, QUANTIFYING AND PROPAGATING SUBJECTIVE,ENGINEERING JUDGEMENT USED IN THE UNCERTAINTY ANALYSIS. IN PHASE I, FEASIBILITY OF THE PROPOSED APPROACH WILL BE DEMONSTRATED BY APPLYING IT TO SELECTED PARTS OF A PROBABI ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
  3. Development of a Nemeth math to Latex backtranslator system

    SBC: Logical Software Solutions            Topic: N/A

    N/A

    SBIR Phase I 2002 Department of Education
  4. DEVELOPMENT OF VISUAL INSTRUCTION MATERIALS FOR MATH AND SCIENCE CURRICULUM USING THE TOPOLOGICAL PANORAMA CAMERA

    SBC: Janet Gelphman Photography            Topic: N/A

    LEARNING ABILITIES IN MATHEMATICS AND THE SCIENCES ARE NOT MAXIMIZED BECAUSE OF THE LACK OF VISUAL INSTRUCTIONAL MATERIALS. THE IMPROVEMENT OF THESE SKILLS IS IMPORTANT BECAUSE BETTER SCIENCE AND MATH ABILITIES ARE NEEDED IN THE UNITED STATES IN ORDER TO KEEP UP WITH OTHER INDUSTRIALIZED NATIONS. OUR PROPOSED SOLUTION IS TO USE A NEW TECHNOLOGY, THE TOPOLOGICAL PANORAMA CAMERA, TO CREATE COST-EFFE ...

    SBIR Phase I 1987 Department of Education
  5. Emergency preparedness training software with universal access

    SBC: VCOM3D INC            Topic: N/A

    N/A

    SBIR Phase I 2002 Department of Education
  6. IDENTIFICATION OF MAJOR BARRIERS AFFECTING EMPLOYERS' DECISIONS TO HIRE HANDICAPPED WORKERS

    SBC: Psi Assoc Inc            Topic: N/A

    THIS RESEARCH WILL SURVEY A STRATIFIED SAMPLE OF 120 EMPLOYERS IN N.E. OHIO (BASED ON SIZE, FUNCTION, AND SIMILAR VARIABLES) TO DETERMINE WHAT MAJOR FACTORS AFFECT EMPLOYERS IN THEIR HIRING OF HANDICAPPED PERSONS. PSYCHOLOGISTS WILL INTERVIEW PERSONNEL DECISION MAKERS TO IDENTIFY EMPLOYER'S PERSPECTIVES ON BARRIERS TO THE GREATER EMPLOYMENT OF HANDICAPPED PERSONS. RESULTING FROM THIS INVESTIGATION ...

    SBIR Phase I 1987 Department of Education
  7. INPUT AND OUTPUT MECHANISMS AND DEVICES

    SBC: Stafftec            Topic: N/A

    A SIX MONTH EFFORT IS PROPOSED TO DEVELOP A 2-CHANNEL ELECTROMYOGRAM (EMG) ADAPTIVE-FIRMWARE CARD SYSTEM FOR IBM AND IBM COMPATIBLE COMPUTERS. THE ADAPTIVE-FIRMWARE CARD SYSTEM WILL PROVIDE KEYBOARD INPUT THAT IS CONTROLLED BY EMG SIGNALS. THE SYSTEM IS DESIGNED FOR DISABLED INDIVIDUALS WHO CAN NOT USE STANDARD KEYBOARDS IN THEIR NORMAL FASHION. THE SYSTEM WILL BE "TRANSPARENT" TO THE COMPUTER AND ...

    SBIR Phase I 1987 Department of Education
  8. Integration of Academics and CTE: Interactive Teaching Modules for Mathematics

    SBC: CCI Publishing            Topic: N/A

    N/A

    SBIR Phase I 2002 Department of Education
  9. PREDICTION OF CHECK VALVE PERFORMANCE & DEGRADATION IN NUCLEAR POWER PLANT SYSTEMS

    SBC: KALSI ENGINEERING, INC            Topic: N/A

    N/A

    SBIR Phase I 1987 Nuclear Regulatory Commission
  10. SingSync: Software Tools for Synchronizing Sign language access to digital multimedia

    SBC: VCOM3D INC            Topic: N/A

    N/A

    SBIR Phase I 2002 Department of Education
US Flag An Official Website of the United States Government