You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A COMMUNICATION AND CONTROL SYSTEM FOR THE MENTALLY RETARDED

    SBC: Scott Instruments Corp            Topic: N/A

    THE TOPIC OF THIS PROPOSAL IS THE DESIGN OF AN ENVIRONMENTALCONTROL SYSTEM FOR THE MORE THAN TWO MILLION INDIVIDUALS IN THE UNITED STATES WHOSE PHYSICAL AND/OR MENTAL IMPAIRMENTS ARE SO SEVERE THAT THEY ARE UNABLE TO FUNCTION IN THEIR ENVIRONMENT IN A NORMAL AND EFFECTIVE MANNER. A TWO-YEAR COLLABORATIVE RESEARCH EFFORT BETWEEN THE BIOENGINEERING PROGRAM AT THE NATIONAL HEADQUARTERS OF THE ASSOCIA ...

    SBIR Phase I 1987 Department of Health and Human Services
  2. A DIGITAL TELEMETRY MONITOR WITH MODULAR FEATURES

    SBC: United States Control            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of Health and Human Services
  3. ADVANCED FACILITIES TO EXPEDITE DESIGN AND EVALUATION OF COMMUNICATIONS SYSTEMS

    SBC: Information Research            Topic: N/A

    THE TECHNICAL OBJECTIVE OF THIS PROJECT IS TO ESTABLISH THE FEASILBILITY OF SATISFYING THE REQUIREMENTS OF THE U.S. ARMY COMMUNICATIONS ELECTRONICS COMMAND (CECOM) FOR RAPID AND EFFECTIVE MODELING OF U.S. ARMY COMMUNICATION SYSTEMS. THE METHOD WE PROPOSE FOR SATISFYING THESE REQUIREMENTS IS TO ADAPT A TOP-DOWN DESIGN SYSTEM FOR ELECTRONIC SYSTEMS BEING DEVELOPED FOR THE U.S. NAVY TO MODEL-ING OF C ...

    SBIR Phase I 1987 Department of DefenseArmy
  4. ADVANCED SENSORS FOR CLOSE PROXIMITY ROBOTIC MINE DETECTION

    SBC: Coleman Research Corp.            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseArmy
  5. A FUZZY SET APPROACH FOR SEISMIC SAFETY MARGINS ASSESSMENT.

    SBC: Eda Consultants            Topic: N/A

    THE CONTRACTOR SHALL DEVELOP A FUZZY SET METHODOLOGY FOR UNCERTAINTY ANALYSIS IN PROBABILISTIC SEISMIC SAFETY ASSESSMENT OF NUCLEAR POWER PLANTS. FUZZY SET LOGIC WILL BEUSED FOR COLLECTING, QUANTIFYING AND PROPAGATING SUBJECTIVE,ENGINEERING JUDGEMENT USED IN THE UNCERTAINTY ANALYSIS. IN PHASE I, FEASIBILITY OF THE PROPOSED APPROACH WILL BE DEMONSTRATED BY APPLYING IT TO SELECTED PARTS OF A PROBABI ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
  6. AN INSTRUMENT FOR AUTOMATED AUDITORY SCREENING OF THE NEWBORN

    SBC: Metraco Inc            Topic: N/A

    METRACO, INC. PROPOSES TO DEVELOP A PROTOTYPE EVOKED-POTENTIAL INSTRUMENT THAT WILL ALLOW AUTOMATED SCREENING FOR HEARING PROBLEMS IN THE NEWBORN INFANT. THE INSTRUMENT WILL PROVIDE NEW, UNIQUE FEATURES AND TECHNOLOGY UNAVAILABLE IN EXISTING INSTRUMENTS. THE MAJOR GOALS ARE: (1) TO IMPROVE THE EFFECTIVE SIGNAL-TO-NOISE RATIO AND ERROR REDUCTION ABILITY BY COMPUTATION OF THE MEDIAN RATHER THAN THE ...

    SBIR Phase I 1987 Department of Health and Human Services
  7. ANTIGENICITY OF GONOCOCCAL PILUS OLIGOMERS

    SBC: Immunomed Corpon            Topic: N/A

    THE DEVELOPMENT OF A SAFE AND EFFICACIOUS VACCINE FOR GONORRHEA BASED ON OLIGOMERS FROM PILI IS A MAJOR GOAL OF IMMUNOMED CORPORATION. EARLY ATTEMPTS TO DEVELOP GONORRHEA VACCINES USING INTACT PILI FAILED BECAUSE OF ANTIGENIC DIVERSITY AMONG THE BACTERIAL STRAINS IN THE POPULATION. A PRELIMINARY STUDY OF OLIGOMERS FROM THE TYPE 2 COLONIAL FORM OF NEISSERIA GONORRHOEAE HAS SHOWN THAT THEY WERE BETT ...

    SBIR Phase I 1987 Department of Health and Human Services
  8. AUTOMATED REUSABLE COMPONENT SYSTEM (ARCS)

    SBC: MODUS OPERANDI, INC.            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseArmy
  9. BALLISTIC FACE SHIELD WITH DEICING/DEFOGGING CAPABILITIES IN EXTREME CLIMATE

    SBC: Polytronix Inc            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseArmy
  10. BARRIERLESS ULTRASONIC AIR CLEANER

    SBC: Taylor S R & Assocs            Topic: N/A

    MILITARY VEHICLE AIR CLEANER SYSTEM PERFORMANCE CAN BE EVALUATED IN SEVERAL WAYS, HOWEVER, ONE OF THE MOST IMPORTANT PERFORMANCE CONSIDERATIONS IS SERVICE LIFE. TODAY, AIR CLEANERS REQUIRE FREQUENT SERVICING IN DUSTY CONDITIONS AND POSE A CONTAMINATION RISK FACTOR TO MEDIA MATERIAL AND MAINTENANCE PERSONNEL DURING CLEANING IN AN NBC ENVIRONMENT. IN FACT, IT IS THIS PARAMETER THAT HAS LED TO THE US ...

    SBIR Phase I 1987 Department of DefenseArmy
US Flag An Official Website of the United States Government