You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.

  1. A FUZZY SET APPROACH FOR SEISMIC SAFETY MARGINS ASSESSMENT.

    SBC: Eda Consultants            Topic: N/A

    THE CONTRACTOR SHALL DEVELOP A FUZZY SET METHODOLOGY FOR UNCERTAINTY ANALYSIS IN PROBABILISTIC SEISMIC SAFETY ASSESSMENT OF NUCLEAR POWER PLANTS. FUZZY SET LOGIC WILL BEUSED FOR COLLECTING, QUANTIFYING AND PROPAGATING SUBJECTIVE,ENGINEERING JUDGEMENT USED IN THE UNCERTAINTY ANALYSIS. IN PHASE I, FEASIBILITY OF THE PROPOSED APPROACH WILL BE DEMONSTRATED BY APPLYING IT TO SELECTED PARTS OF A PROBABI ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
  2. HEAT PUMP AUGMENTED SPACECRAFT HEAT REJECTION SYSTEM

    SBC: MAINSTREAM ENGINEERING CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseMissile Defense Agency
  3. HIGH INTENSITY SOLAR POWERED LASER

    SBC: GELTECH, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseMissile Defense Agency
  4. OPTICAL MULTIPLE TARGET SURVEILLANCE POINTING ACQUISITION AND TRACKING SENSORS

    SBC: E-tek Dynamics Inc.            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseMissile Defense Agency
  5. PREDICTION OF CHECK VALVE PERFORMANCE & DEGRADATION IN NUCLEAR POWER PLANT SYSTEMS

    SBC: Kalsi Engineering, Incorporated            Topic: N/A

    N/A

    SBIR Phase I 1987 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government