You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.

  1. A FUZZY SET APPROACH FOR SEISMIC SAFETY MARGINS ASSESSMENT.

    SBC: Eda Consultants            Topic: N/A

    THE CONTRACTOR SHALL DEVELOP A FUZZY SET METHODOLOGY FOR UNCERTAINTY ANALYSIS IN PROBABILISTIC SEISMIC SAFETY ASSESSMENT OF NUCLEAR POWER PLANTS. FUZZY SET LOGIC WILL BEUSED FOR COLLECTING, QUANTIFYING AND PROPAGATING SUBJECTIVE,ENGINEERING JUDGEMENT USED IN THE UNCERTAINTY ANALYSIS. IN PHASE I, FEASIBILITY OF THE PROPOSED APPROACH WILL BE DEMONSTRATED BY APPLYING IT TO SELECTED PARTS OF A PROBABI ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
  2. PREDICTION OF CHECK VALVE PERFORMANCE & DEGRADATION IN NUCLEAR POWER PLANT SYSTEMS

    SBC: Kalsi Engineering, Incorporated            Topic: N/A

    N/A

    SBIR Phase I 1987 Nuclear Regulatory Commission
  3. SEISMIC MONITORING SYSTEM FOR LOCAL AND REGIONAL NETWORK

    SBC: ENSCO Inc            Topic: N/A

    THE DEVELOPMENT OF A COMPUTERIZED SYSTEM FOR MONITORING LOCAL AND REGIONAL SEISMIC EVENTS IS PROPOSED. THIS AUTOMATED SYSTEM WILL INCORPORATE MANY OF THE ADVANCED SEISMIC ANALYSIS TECHNIQUES THAT CAN ONLY BE FOUND IN SPECIALIZED AND LARGE SYSTEMS FOR MONITORING UNDERGROUND NUCLEAR EXPLOSIONS THROUGHOUT THE WORLD. AMONG THE STATE-OF-THE-ART METHODOLOGIES WE WILL INTEGRATE INTO THE SYSTEM ARE THE NE ...

    SBIR Phase I 1993 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government