You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
ELECTRONIC BOMB FUZE DETECTION
SBC: Household Data Services Topic: N/ASEVERAL METHODS OF RAPIDLY SCREENING AIRLINE PASSENGERS AND BAGGAGE FOR EXPLOSIVE DEVICES ARE PROPOSED. TWO OF THESE METHODS USE NONLINEAR DEVICE DETECTION (NLDD) TO DETERMINE THE PRESENCE OF ACTIVE OR PASSIVE SEMICONDUCTOR DEVICES WHICH MAY BE PART OF AN ELECTRONIC BOMB FUZE. ANOTHER TWO DETECT THE PRESENCE OF RUNNING OSCILLATORS WHICH ARE LIKELY SUBSYSTEMS OF A FUZING DEVICE.
SBIR Phase I 1987 Department of Transportation -
Microwave measurement of rail distance traveled
SBC: Systems & Materials Research Corporation Topic: 081FR3Rail vehicle distance traveled measurements don't currently meet the precision requirement of 5ft./mile. An innovative microwave technique is proposed using two X band transceiver assemblies separated by a known distance. Reflected energy from metal objects such as tie-plates or dielectric contrast between ties and rail bed are used as replicate pairs to measure the time passage between transcei ...
SBIR Phase I 2009 Department of Transportation -
NATIONAL HIGHWAY TRAFFIC SAFETY ADMINISTRATION-- EMERGENCY MEDICAL SERVICES
SBC: Humrro International Inc. Topic: N/AN/A
SBIR Phase I 1987 Department of Transportation -
Non-contact Track Gage Measurement System (NC-TGMS)
SBC: DFUZION, INC. Topic: 081FR4One of the causes of derailments occurs when the track gage is no longer compliant with the FRA track safety standards for gage measurments. Ensuring track gage is in compliance with the FRA track safety standards is therefore of paramount importance to the FRA. Currently, the FRA wishes to develop a non-contact track gage measurement system that overcomes the limitations of current systems (unr ...
SBIR Phase I 2009 Department of Transportation -
Portable Active Thermographic Coating Inspection System
SBC: Fuchs Consulting Inc Topic: 091FH2This proposal seeks to produce a unique thermographic coating inspection system that is customized for the inspection of bridge coatings. This system uses active thermography where IR sources are used to provide controlled heating to a coating system. The presence of a defect in a coating system will result in differences in heat flow, which can be imaged with an infrared camera. An off-the-she ...
SBIR Phase I 2009 Department of Transportation -
PROGRAMMABLE REFLECTANCE OF ARTIFICIAL FLAWS IN RAIL MATERIALS
SBC: REINHART & ASSOC., INC. Topic: N/AA PROGRAMMABLE DEFECT SIMULATOR IS NEEDED TO TEST ULTRASONIC RAIL FLAW DETECTION SYSTEMS. CALIBRATION STANDARDS CAN BE DEVELOPED WITH VARIABLE PHYSICAL CHARACTERISTICS ACCORDING TO A PREDESCRIBED SCHEME THAT SIMULATES COMMONLY-OCCURRING FLAWS (CROSS-HEAD FATIGUE CRACKS) IN RAILWAY SYSTEM RAILS. THIS PROJECT WOULD DEVELOP A METHOD OF ALTERING THE EFFECTIVE REFLECTIVITY OF A SOLID-GAS INTERFACE THRO ...
SBIR Phase I 1987 Department of Transportation -
Roadway Waste Heat Electricity Production Using Impoved Roadway Paving Technologies
SBC: Planphoria LLC Topic: 091FH5Planphoria will research, define and develp methods to turn our nation's roadways into a giant energy collection and transference system that produces low cost electrical energy close to point of use. Though roadway environmental conditions change, and different roadway requirements vastly differ from the requirements of other roadways, we will determine the feasibility of this concept by leading ...
SBIR Phase I 2009 Department of Transportation