You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. High-Throughput Manufacturing Methods for Engineered MRI Contrast Agents

    SBC: ADVANCED RESEARCH CORPORATION            Topic: 9010368R

    This project focuses on developing a magnetic resonance imaging (MRI) contrast agent that may increase the detection of tagged cells by a factor of 10-100. The ability to noninvasively track specifically labeled (tagged) cells, enables a researcher or medical treatment professional to dynamically monitor the delivery and targeted application of medicinal and bio-reactive agents.

    SBIR Phase I 2015 Department of CommerceNational Institute of Standards and Technology
  2. A Tool for Building Semantically Interoperable Specification and Standards

    SBC: XSB INC            Topic: 9010273R

    Standards and specifications are widely used in government and industry to define requirements for products and processes and insure interoperability, safety, and quality of industrial and domestic products. Specifications and standards documents almost always cross-reference other standards and specification. Taken together, the web of interdependent standards forms an immensely important knowled ...

    SBIR Phase I 2015 Department of CommerceNational Institute of Standards and Technology
  3. RISK-BASED ANALYSIS OF TECHNICAL SPECIFICATIONS

    SBC: Applied Biomathematics Inc            Topic: N/A

    N/A

    SBIR Phase I 1987 Nuclear Regulatory Commission
  4. A FUZZY SET APPROACH FOR SEISMIC SAFETY MARGINS ASSESSMENT.

    SBC: Eda Consultants            Topic: N/A

    THE CONTRACTOR SHALL DEVELOP A FUZZY SET METHODOLOGY FOR UNCERTAINTY ANALYSIS IN PROBABILISTIC SEISMIC SAFETY ASSESSMENT OF NUCLEAR POWER PLANTS. FUZZY SET LOGIC WILL BEUSED FOR COLLECTING, QUANTIFYING AND PROPAGATING SUBJECTIVE,ENGINEERING JUDGEMENT USED IN THE UNCERTAINTY ANALYSIS. IN PHASE I, FEASIBILITY OF THE PROPOSED APPROACH WILL BE DEMONSTRATED BY APPLYING IT TO SELECTED PARTS OF A PROBABI ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
  5. SEISMIC MONITORING SYSTEM FOR LOCAL AND REGIONAL NETWORK

    SBC: ENSCO Inc            Topic: N/A

    THE DEVELOPMENT OF A COMPUTERIZED SYSTEM FOR MONITORING LOCAL AND REGIONAL SEISMIC EVENTS IS PROPOSED. THIS AUTOMATED SYSTEM WILL INCORPORATE MANY OF THE ADVANCED SEISMIC ANALYSIS TECHNIQUES THAT CAN ONLY BE FOUND IN SPECIALIZED AND LARGE SYSTEMS FOR MONITORING UNDERGROUND NUCLEAR EXPLOSIONS THROUGHOUT THE WORLD. AMONG THE STATE-OF-THE-ART METHODOLOGIES WE WILL INTEGRATE INTO THE SYSTEM ARE THE NE ...

    SBIR Phase I 1993 Nuclear Regulatory Commission
  6. DEVELOP AN INHALATION SCREENING DOSE MONITOR FOR WORKERS AT NUCLEAR POWER PLANTS

    SBC: Mikayola International            Topic: N/A

    AN "INHALATION SCREENING DOSE COLLAR-STANCHION MONITOR" WITHEMBEDDED MINIATURE THIN-WALL GEIGER-MUELLER RADIATION DETECTORS EVALUATES THE THYROID GLAND FOR NANOCURIE ACTIVITYINVENTORY. THE PRIMARY TECHNICAL OBJECTIVE IS TO ESTABLISH THAT THE "COLLAR-STANCHION MONITOR" WILL BE CAPABLE OF DETECTING WITHIN 15 SECONDS AND WITH 2 SIGMA CONFIDENCE AN ACTIVITY INVENTORY OF 0.7 NANOCURIES OF I-131 DOSE EQ ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
  7. CONTINUOUS SPECTROGRAPHIC ANALYSIS OF VANADOUS AND VANADIC IONS

    SBC: Omni Tech International Ltd            Topic: N/A

    VANADOUS FORMATE IS USED IN THE LOMI PROCESS FOR CHEMICAL DECONTAMINATION OF NUCLEAR POWER PLANTS TO REDUCE THE EXPOSURE TO RADIATION BY PLANT PERSONNEL. IN THIS PROCESS, VANADOUS FORMATE IS USED TO PARTIALLY REDUCE IRON AND NICKEL OXIDES THAT CONTAIN RADIOACTIVE MATERIALS, PRIMARILY COBALT OXIDE. THESE METALS ARE THEN CHELATED IN SOLUTION, ABSORBED ON ION EXCHANGE RESINS, SOLIDIFIED AND BURIED. T ...

    SBIR Phase II 1993 Nuclear Regulatory Commission
  8. PREDICTION OF CHECK VALVE PERFORMANCE & DEGRADATION IN NUCLEAR POWER PLANT SYSTEMS

    SBC: KALSI ENGINEERING, INC            Topic: N/A

    N/A

    SBIR Phase I 1987 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government