You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. HIGHWAY FOG WARNING SYSTEM

    SBC: SENTEC CORPORATION            Topic: N/A

    DENSE FOG HAS OFTEN BEEN A CAUSE OF TRAGIC ROAD ACCIDENTS. THE DEVELOPMENT OF A COST EFFECTIVE HIGHWAY FOG DETECTION SYSTEM WHICH MONITORS ROAD VISIBILITY AND PROVIDES WARNINGS TO MOTORISTS THROUGH ROADSIDE DISPLAYS OR RADIO COMMUNICATION IS PROPOSED FOR DOT 94-FH7. THE PROPOSED OPTICAL SENSOR MEASURES SCATTERED LIGHT FROM FOG PARTICLES. THE PHASE I EFFORT WILL BE FOCUSED ON DETERMINING THE FEASIB ...

    SBIR Phase II 1995 Department of Transportation
  2. Easy Access to Freight Locomotives

    SBC: GS ENGINEERING INC            Topic: 141FR3

    Accessing a freight locomotive is one of the most basic, daily tasks performed by a railroad engineer. However, this task has historically been difficult due to several factors such as the first step which may be 19 inches above the top of the rail, weather conditions which may make the steps slippery, and the fact that the ground surrounding the locomotive may be uneven or covered in debris or ba ...

    SBIR Phase II 2016 Department of Transportation
US Flag An Official Website of the United States Government