You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. AN INTERACTIVE, NATIONWIDE GEOGRAPHICAL INFORMATION SYSTEM TO ADMINISTER HIGHWAY ROUTE DESIGNATIONS FOR THE TRANSPORTATION OF HAZARDOUS MATERIALS

    SBC: Aegis Information Systems            Topic: N/A

    IN ACCORDANCE WITH THE HAZARDOUS MATERIALS TRANSPORTATION UNIFORM SAFETY ACT OF 1990 (HMTUSA), DOT IS NOW REQUIRED TO CREATE A CENTRALIZED DATABASE OF STATE-DESIGNATED HAZARDOUS MATERIAL HIGHWAY ROUTES. DOT IS ALSO RESPONSIBLE FOR PERIODICALLY UPDATING AND PUBLISHING A LIST OF CURRENLY EFFECTIVE HAZARDOUS MATERIALS HIGHWAY ROUTE DESINGATIONS IN THE FEDERAL REGISTER. IN RESPONSE TO THIS NEED, AEGIS ...

    SBIR Phase II 1995 Department of Transportation
  2. WEIGHING TRUCK COMBINATIONS IN MOTION, SOLELY ON THE TRACTOR

    SBC: Airsport Corp.            Topic: N/A

    AN IMPROVED METHOD OF WEIGHING TRUCKS WHILE IN MOTION IS PROPOSED. TO INCREASE EFFICIENCY AND REDUCE TIME LOST AT WEIGH STATIONS, THE TRUCKING INDUSTRY NEEDS TO EXCHANGE DATA, INCLUDING WEIGHT DATA, BETWEEN MOVING TRUCKS AND ENFORCEMENT FACILITIES. LEGALLY LOADED TRUCKS WOULD THEN BE ABLE TO PROCEED WITHOUT STOPPING. THIS INVOLVES WEIGH-IN-MOTION. PRESENT WEIGHING TECHNIQUES INVOLVE LOAD CELLS OR ...

    SBIR Phase II 1995 Department of Transportation
  3. Software Package for Material Model Evaluation

    SBC: APTEK, Inc.            Topic: N/A

    This Phase I and II SBIR will develop a user-friendly, run-time efficient software package dedicated to fitting and evaluating material models used in finite element codes like LS-DYNA. The software package will consist of a pre-processor, a core driver, and a post-processor. The pre-processor will allow the user to specify the material model, model parameters, and desired load history. The dri ...

    SBIR Phase II 2004 Department of Transportation
  4. METHODOLOGY FOR CORRELATION OF ATC CONTROLLER WORKLOAD AND ERRORS

    SBC: Computer Technology Associates            Topic: N/A

    THE PURPOSE OF THIS RESEARCH IS TO STUDY THE FEASIBILITY OF QUANTIFYING THE EFFECTS OF IREASED AUTOMATION ON THE WORKLOAD AND PERFORMANCE OF THE FEDERAL AVIATION ADMINISTRA-TION'S AIR TRAFFIC CONTROLLER. IN PHASE I, RESEARCH WILL FOCUS ON ADAPTRING OUR CURRENT HUMAN PERFORMANCE MODEL TO REPRESENT THE JOB CHARACTERISTICS OR ATTRIBUTES THAT WILL DETERMINE LEVELS OF WORKLOAD AND PERFORMANCE IN THE AD ...

    SBIR Phase II 1987 Department of Transportation
  5. EMBEDDED PAVEMENT STRESS SENSORS CONTAINING PIEZOELECTRIC COMPOSITES

    SBC: Fiber Materials, Inc.            Topic: N/A

    FIBER MATERIALS, INC. (FMI) PROPOSES SENSORS WHICH CAN BE EMBEDDED IN PAVEMENT TO MEASURE STRESS AND STRAIN FROM TRUCKS PASSING OVER AT SPEEDS UP TO 60 MPH. THESE SIMPLE, DURABLE SENSORS WILL BE MADE FROM PIEZOELECTRIC COMPOSITES WHICH ACT AS PASSIVE SENSORS AND DEVELOP A CHARGE PROPORTIONAL TO THE APPLIED PRESSURE. THE CHARGE IS CONVERTED TO A VOLTAGE WHICH IS RECORDED ON NEARBY EQUIPMENT. THE PH ...

    SBIR Phase II 1995 Department of Transportation
  6. TRAFFIC

    SBC: Kld Associates Inc.            Topic: N/A

    THE TRAFFIC ENGINEER RELIES UPON A COLLECTION OF SOFTWARE TOOLS TO COMPUTE TRAFFIC SIGNAL TIMING PLANS AND TO EVALUATE THE OPERATIONAL PERFORMANCE OF HIGHWAY NETWORKS. TRANSPORTATION PLANNERS EMPLOY DEMAND MODELING TOOLS TO PROJECT TRAFFIC DEMAND, DISTRIBUTION, ASSIGNMENT AND PERFORMANCE OVER LARGE NETWORKS. THESE TOOLS HAVE TWO OVERALL ATTRIBUTES IN COMMON. THE ARE: 1) NETWORK-BASED AND 2) DATA I ...

    SBIR Phase II 1995 Department of Transportation
  7. RESEARCH ON AN AIRBORNE WIND SHEAR SENSOR

    SBC: Ophir Corporation            Topic: N/A

    THE RECOGNIZED LOW LEVEL WIND SHEAR PHENOMENON KNOWN AS A MICROBURST POSES A SERIOUS AIR SAFETY THREAT TO COMMERCIAL AVIATION WHILE IN A LANDING OR POSES A SERIOUS COMMERCIAL AVIATION WHILE IN A LANDING OR TAKEOFF PATTERN. THIS LOW LEVEL WIND SHEAR HAS BEEN DEMONSTRATED TO DE A THIS LOW LEVEL WIND SHEAR HAS BEEN DEMONSTRATED TO BE A MAJOR CONTRIBUTING FACTOR TO SEVERAL CRASHES OF COMMERCIAL AIRLIN ...

    SBIR Phase II 1987 Department of Transportation
  8. Portland Cement Concrete Pavement Recycling

    SBC: Road Processing Resources Inc.            Topic: N/A

    RPR's Phase I contract proved the feasibility of concrete recycling based o a shock-producing hammer/anvil concept for fracturing and sizing aggregate and separating reinforcing steel into marketable scrap. The Phase II project will develop a portable self-propelled prototype to remove and process a 12 foot wide roadway at a rate of about a mile a day. This is called "Fast Track" highway removal ...

    SBIR Phase II 2004 Department of Transportation
  9. CARBON FIBER SENSOR FOR AXLE DETECTION ON ROADWAYS

    SBC: Sensor Plus, Inc.            Topic: N/A

    A FORCE/STRAIN SENSOR CONSISTING OF CARBON FIBERS EMBEDDED IN ASPHALT, CONCRETE AND OTHER CONSTRUCTION MATERIALS WILL BE USED AS A PERMANENT VEHICLE AXLE AND TRAFFIC SENSOR ON ROADWAYS. FOR TEMPORARY INSTALLATION, A PAINT OR ASPHALT STRIP WITH CARBON FIBERS IS APPLIED TO THE ROADWAY IN THE FORM OF STRIPS. THIS WILL BE DEVELOPED DURING PHASE I. A SIGNAL CONDITIONER/PROCESSOR PROVIDES AXLE WEIGHT AN ...

    SBIR Phase II 1995 Department of Transportation
  10. Environmentally Neutral Electric Bike Share System

    SBC: INNOVATIVE DYNAMICS INC.            Topic: 142OS1

    IDI is proposing an electrically assisted e-bike system, designed to increase the usage of bicycles for daily commuting. This design is intended for usage alongside traditional bike share programs in cities across the country. The primary benefit is attract those otherwise unwilling to use bicycles to commute, either due to personal reservation or perceived terrain difficulties. This is accomplish ...

    SBIR Phase II 2016 Department of Transportation
US Flag An Official Website of the United States Government