You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. METHODOLOGY FOR CORRELATION OF ATC CONTROLLER WORKLOAD AND ERRORS

    SBC: Computer Technology Associates            Topic: N/A

    THE PURPOSE OF THIS RESEARCH IS TO STUDY THE FEASIBILITY OF QUANTIFYING THE EFFECTS OF IREASED AUTOMATION ON THE WORKLOAD AND PERFORMANCE OF THE FEDERAL AVIATION ADMINISTRA-TION'S AIR TRAFFIC CONTROLLER. IN PHASE I, RESEARCH WILL FOCUS ON ADAPTRING OUR CURRENT HUMAN PERFORMANCE MODEL TO REPRESENT THE JOB CHARACTERISTICS OR ATTRIBUTES THAT WILL DETERMINE LEVELS OF WORKLOAD AND PERFORMANCE IN THE AD ...

    SBIR Phase II 1987 Department of Transportation
  2. RESEARCH ON AN AIRBORNE WIND SHEAR SENSOR

    SBC: Ophir Corporation            Topic: N/A

    THE RECOGNIZED LOW LEVEL WIND SHEAR PHENOMENON KNOWN AS A MICROBURST POSES A SERIOUS AIR SAFETY THREAT TO COMMERCIAL AVIATION WHILE IN A LANDING OR POSES A SERIOUS COMMERCIAL AVIATION WHILE IN A LANDING OR TAKEOFF PATTERN. THIS LOW LEVEL WIND SHEAR HAS BEEN DEMONSTRATED TO DE A THIS LOW LEVEL WIND SHEAR HAS BEEN DEMONSTRATED TO BE A MAJOR CONTRIBUTING FACTOR TO SEVERAL CRASHES OF COMMERCIAL AIRLIN ...

    SBIR Phase II 1987 Department of Transportation
  3. Software Package for Material Model Evaluation

    SBC: APTEK, Inc.            Topic: N/A

    This Phase I and II SBIR will develop a user-friendly, run-time efficient software package dedicated to fitting and evaluating material models used in finite element codes like LS-DYNA. The software package will consist of a pre-processor, a core driver, and a post-processor. The pre-processor will allow the user to specify the material model, model parameters, and desired load history. The dri ...

    SBIR Phase II 2004 Department of Transportation
  4. High Precision Monitoring Instrumentation for Background Methane

    SBC: Atmospheric Observing Systems, Inc.            Topic: 811

    Our Phase I effort was successful. We upgraded our baseline methane analyzer to meet or surpass the levels of performance posed by DOC solicitation subtopic 8.1.1R: sensitivity of 10 ppb (dry mole fraction), low maintenance for extended periods at remote field sites, less than one liter (NTP) of reference gas per day, and negligible response to platform motion. The analyzer is a novel applicatio ...

    SBIR Phase II 2004 Department of Commerce
  5. Build a Prototype "Grid In A Box" Software Product for NOAA

    SBC: FAIRFIELD TECHNOLOGIES INC.            Topic: 817

    Brief Description of Problem: NOAA¿s AWIPS is a cornerstone of NWS¿ forecast mission. As advanced as AWIPS is, it still faces challenges similar to many systems, including: system capacity over-/under-utilization; data and analysis stovepiping; and complex data management needs. Innovations: In Phase 1, FTI successfully demonstrated that grid computing and ontologies could enable communicati ...

    SBIR Phase II 2004 Department of Commerce
  6. Portland Cement Concrete Pavement Recycling

    SBC: Road Processing Resources Inc.            Topic: N/A

    RPR's Phase I contract proved the feasibility of concrete recycling based o a shock-producing hammer/anvil concept for fracturing and sizing aggregate and separating reinforcing steel into marketable scrap. The Phase II project will develop a portable self-propelled prototype to remove and process a 12 foot wide roadway at a rate of about a mile a day. This is called "Fast Track" highway removal ...

    SBIR Phase II 2004 Department of Transportation
  7. Direct-Digital Phase-&-Amplitude-Noise Measurement-System

    SBC: TIMING SOLUTIONS            Topic: N/A

    The Direct Digital Phase Noise Measurement Phase 1 SBIR demonstrated the feasibility of the technology to make the measurements required by the commercial marketplace. This new approach to phase noise measurements uses fast digital-to-analog converters to digitize the input RF signal and performs all down-conversion and phase detection functions by digital signal processing. It has several signifi ...

    SBIR Phase II 2004 Department of CommerceNational Institute of Standards and Technology
US Flag An Official Website of the United States Government