You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. STOCHASTIC MODELING OF ANTISYMMETRIC BUFFET LOADS ON HORIZONTAL STABILIZERS

    SBC: AEROTECH ENGINEERING & RESEARCH CORP.            Topic: N/A

    N/A

    SBIR Phase II 1995 Department of Transportation
  2. EMBEDDED PAVEMENT STRESS SENSORS CONTAINING PIEZOELECTRIC COMPOSITES

    SBC: Fiber Materials, Inc.            Topic: N/A

    FIBER MATERIALS, INC. (FMI) PROPOSES SENSORS WHICH CAN BE EMBEDDED IN PAVEMENT TO MEASURE STRESS AND STRAIN FROM TRUCKS PASSING OVER AT SPEEDS UP TO 60 MPH. THESE SIMPLE, DURABLE SENSORS WILL BE MADE FROM PIEZOELECTRIC COMPOSITES WHICH ACT AS PASSIVE SENSORS AND DEVELOP A CHARGE PROPORTIONAL TO THE APPLIED PRESSURE. THE CHARGE IS CONVERTED TO A VOLTAGE WHICH IS RECORDED ON NEARBY EQUIPMENT. THE PH ...

    SBIR Phase II 1995 Department of Transportation
  3. LOW COST SMART MAGNETOMETER FOR TRAIN DETECTION/MONITORING

    SBC: KVH INDUSTRIES, INC.            Topic: N/A

    PRESENT TRAIN DETECTION SCHEMES RELY LARGELY ON A LOW RESISTANCE THROUGH THE TRAIN'S WHEELS TO PERTURBATE A STABLE ELECTRICAL CIRCUIT. WHILE ELEGANT IN PRINCIPLE, THE DESIGN IS PLAGUED BY OXIDE FILMS AND MATERIAL BUILDUP ON THE RAIL, SNEAK PATHS THROUGH THE BALLAST AND OTHER UNCONTROLLABLE VARIABLES. KVH INDUSTRIES PROPOSES TO DESIGN AND DELIVER A "SMART MAGNETOMETER"-BASED SENSOR PACKAGE WHICH WI ...

    SBIR Phase II 1995 Department of Transportation
  4. THE OBJECTIVE OF THIS PROJECT IS TO DEVELOP A MISSION AND AND ENGINE OIL ANALYSIS BY WHICH TRANSMISSION AND ENGINE WEAROUT CAN BE PREDICTED BY MEASURING OIL TEMPERATURE, CAPACITANCE AND PRESENCE OF HYDROCHLORIC ACID.

    SBC: Tillman & Comeau Associates            Topic: N/A

    THE OBJECTIVE OF THIS PROJECT IS TO DEVELOP A MISSION AND AND ENGINE OIL ANALYSIS BY WHICH TRANSMISSION AND ENGINE WEAROUT CAN BE PREDICTED BY MEASURING OIL TEMPERATURE, CAPACITANCE AND PRESENCE OF HYDROCHLORIC ACID. THIS WILL BE ACCOMPLISHED BY TREATING THE OIL AS A LOSSY DIELECTRIC ACAND PLACING A TRANSDUCER IN THE OIL. BOTH CONDUCTANCE AND SUSCEPTANCE ON APPROPRIATE FREQUENCIES ARE MEASURED AND ...

    SBIR Phase I 1985 Department of Transportation
  5. URBAN TRANSIT COST RECOVERY FEASIBILITY STUDY

    SBC: Williams-kuebelbeck & Assc Inc            Topic: N/A

    URBAN TRANSIT IMPROVEMENTS ENHANCE THE VALUE OF THE PROPERTY THEY SERVE. TRADITIONAL URBAN TRANSIT FINANCING TECHNIQUES NEGLECT THIS POTENTIAL SOURCE OF REVENUE. BENEFIT ASSESSMENT DISTRICTS AND IMPACT MITIGATION FEES, BASED ON CONCEPTS ORIGINALLY DEVISED FOR MINOR IMPROVEMENTS (EG. SIDEWALKS), HAVE BEEN APPLIED EXPERIMENTALLY TO URBAN TRANSIT, BUT DO NOT GENERATE THE MAJOR FUNDING URBAN TRANSIT R ...

    SBIR Phase I 1987 Department of Transportation
US Flag An Official Website of the United States Government