You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. WEIGHING TRUCK COMBINATIONS IN MOTION, SOLELY ON THE TRACTOR

    SBC: Airsport Corp.            Topic: N/A

    AN IMPROVED METHOD OF WEIGHING TRUCKS WHILE IN MOTION IS PROPOSED. TO INCREASE EFFICIENCY AND REDUCE TIME LOST AT WEIGH STATIONS, THE TRUCKING INDUSTRY NEEDS TO EXCHANGE DATA, INCLUDING WEIGHT DATA, BETWEEN MOVING TRUCKS AND ENFORCEMENT FACILITIES. LEGALLY LOADED TRUCKS WOULD THEN BE ABLE TO PROCEED WITHOUT STOPPING. THIS INVOLVES WEIGH-IN-MOTION. PRESENT WEIGHING TECHNIQUES INVOLVE LOAD CELLS OR ...

    SBIR Phase II 1995 Department of Transportation
  2. BRL-CAD BASED LUGGAGE SIMULATION TOOL

    SBC: Applied Research Associates, Inc.            Topic: N/A

    MODELING ANBD SIMULATIONS ARE USED EXTENSIVELY IN THE DESIGN AND ANALYSIS OF "BULK" EXPLOSIVES DETECTION DEVICES. HOWEVER, OVERSIMPLIFICATION OF THE INPUT MODEL, NAMELY LUGGAGE AND EXPLOSIVE CONTENTS, CAN LEAD TO POOR DETECTOR DESIGNS. MANUAL PRODUCTION OF SUCH INPUT IS COSTLY AND ERROR PRONE. THIS EFFORT WILL AUTOMATE THE PRODUCTION OF SIMULATED LUGGAGE THROUGH THE DEVELOPMENT OF A COMPUTER TOOL. ...

    SBIR Phase II 1995 Department of Transportation
  3. DEVELOPMENT OF ANGULAR ACCELEROMETER

    SBC: A-TECH CORPORATION            Topic: N/A

    A RESEARCH EFFORT COMPLETED RECENTLY FOR THE AIR FORCE IDENTIFIED NEW TECHNOLOGIES FOR ANGULAR MOTION MEASUREMENT. TWO CONCEPTS WERE FOUND WHICH APPEAR TO OFFER POTENTIAL FOR AN EXCELLENT COMBINATION OF SMALL SIZE, WIDE DYNAMIC RANGE, WIDE BANDWIDTH AND EASE OF FABRICATION AND UTILIZATION. ONE DEVICE, CALLED A FLUID-FILLED BENDER BEAM, USES PIEZOCERAMICELEMENTS TO PRODUCE A SIGNAL PROPORTIONAL TO ...

    SBIR Phase II 1987 Department of Transportation
  4. EMBEDDED PAVEMENT STRESS SENSORS CONTAINING PIEZOELECTRIC COMPOSITES

    SBC: Fiber Materials, Inc.            Topic: N/A

    FIBER MATERIALS, INC. (FMI) PROPOSES SENSORS WHICH CAN BE EMBEDDED IN PAVEMENT TO MEASURE STRESS AND STRAIN FROM TRUCKS PASSING OVER AT SPEEDS UP TO 60 MPH. THESE SIMPLE, DURABLE SENSORS WILL BE MADE FROM PIEZOELECTRIC COMPOSITES WHICH ACT AS PASSIVE SENSORS AND DEVELOP A CHARGE PROPORTIONAL TO THE APPLIED PRESSURE. THE CHARGE IS CONVERTED TO A VOLTAGE WHICH IS RECORDED ON NEARBY EQUIPMENT. THE PH ...

    SBIR Phase II 1995 Department of Transportation
  5. LOW COST SMART MAGNETOMETER FOR TRAIN DETECTION/MONITORING

    SBC: KVH INDUSTRIES, INC.            Topic: N/A

    PRESENT TRAIN DETECTION SCHEMES RELY LARGELY ON A LOW RESISTANCE THROUGH THE TRAIN'S WHEELS TO PERTURBATE A STABLE ELECTRICAL CIRCUIT. WHILE ELEGANT IN PRINCIPLE, THE DESIGN IS PLAGUED BY OXIDE FILMS AND MATERIAL BUILDUP ON THE RAIL, SNEAK PATHS THROUGH THE BALLAST AND OTHER UNCONTROLLABLE VARIABLES. KVH INDUSTRIES PROPOSES TO DESIGN AND DELIVER A "SMART MAGNETOMETER"-BASED SENSOR PACKAGE WHICH WI ...

    SBIR Phase II 1995 Department of Transportation
  6. FIBER REINFORCED STRUCTURES FOR TURBINE ENGINE FRAGMENT CONTAINMENT

    SBC: PEPIN ASSOCIATES INC            Topic: N/A

    THE PROPOSED PROGRAM EXAMINES OPPORTUNITIES FOR LIGHTWEIGHT CONTAINMENT STRUCTURES IN AIRCRAFT AND ROTORCRAFT AND SEEKS TO DEVELOP FIBER REINFORCED MATERIALS AS THE ENERGY ABSORBING CORE OF POTENTIAL CONTAINMENT DESIGNS. THE PROGRAM BEGINS FROM BASELINE DESIGNS FOR FAN CONTAINMENT WHICH EMPLOY PLAIN WEAVE KEVLAR LAMINATES TO ABSORB BLADE FRAGMENT ENERGIES. VARIOUS ADVANCED FIBERS INCLUDING POLYETH ...

    SBIR Phase II 1989 Department of Transportation
  7. MEASURING LIVE LOAD STRESSES ON BRIDGES

    SBC: SCIENCE & ENGINEERING ASSOC., INC.            Topic: N/A

    THE DEPARTMENT OF TRANSPORTATION (DOT) IS REQUIRED TO MAIN- TAIN THE NATION'S BRIDGES AND ENSURE THEIR SAFETY. HOWEVER,A LARGE NUMBER OF BRIDGES HAVE NOT BEEN RECENTLY INSPECTED TO DETERMINE IF THEY ARE CAPABLE OF SAFELY SUPPORTING THE TRAFFIC THAT IS CROSSING THEM. THE CURRENT METHOD OF SURVEYING BRIDGES, TO DETERMINE THEIR STRESS CONDITION, IS COSTLY AND TIME-CONSUMING. THIS PROGRAM WILL DEVELOP ...

    SBIR Phase II 1989 Department of Transportation
  8. Seamless Flexible Fuel Tanks- 65% TOC Reduction

    SBC: Response Technologies, LLC            Topic: DLA152001

    The DoD uses flexible fuel bladders in multiple air, ground, and sea vehicles because they: 1) easily fit into almost any space, 2) are corrosion resistant, and can often be self-sealing and explosion resistant, 3) allow for customized placement of fittings and connection points, and 4) these flexible tanks can collapse as they empty, thereby reducing the need for venting and minimizing sloshing a ...

    SBIR Phase II 2016 Department of DefenseDefense Logistics Agency
US Flag An Official Website of the United States Government