You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Equipment and Facilities for Rapid Installation of Buried Innerduct Network for Utility Lines

    SBC: Outside Plant Consulting Services, Inc.            Topic: N/A

    The proposed buried innerduct/duct network (BIN) comprises an integrated system to facilitate future upgrades of buried communications (telephony, CATV) and power lines. The objective of the project is to provide improved, cost-effective hardware and practices relative to present buried construction procedures, which do not otherwise allow for future upgrades or replacement of initially installed ...

    SBIR Phase II 2007 Department of Transportation
  2. LOW COST SMART MAGNETOMETER FOR TRAIN DETECTION/MONITORING

    SBC: KVH INDUSTRIES, INC.            Topic: N/A

    PRESENT TRAIN DETECTION SCHEMES RELY LARGELY ON A LOW RESISTANCE THROUGH THE TRAIN'S WHEELS TO PERTURBATE A STABLE ELECTRICAL CIRCUIT. WHILE ELEGANT IN PRINCIPLE, THE DESIGN IS PLAGUED BY OXIDE FILMS AND MATERIAL BUILDUP ON THE RAIL, SNEAK PATHS THROUGH THE BALLAST AND OTHER UNCONTROLLABLE VARIABLES. KVH INDUSTRIES PROPOSES TO DESIGN AND DELIVER A "SMART MAGNETOMETER"-BASED SENSOR PACKAGE WHICH WI ...

    SBIR Phase II 1995 Department of Transportation
  3. Gigabit/Second Random Number Generator Using White Noise Generated by Delayed Optical Homodyne

    SBC: STRUCTURED MATERIALS INDUSTRIES, INC.            Topic: N/A

    SMI proposes Gigabit/second Random Number Generator using the white phase noise generated by delayed optical homodyne. In Phase 1, we have successfully demonstrated and delivered to NIST a bench-top proof of concept of the proposed random noise generator operating at >10 Mega-bit/second. This bench-top demonstration unit is operating today in the NIST laboratories. The delivered system successfull ...

    SBIR Phase II 2007 Department of CommerceNational Institute of Standards and Technology
  4. COMPUTER TECHNOLOGY TO EVALUATE AIRCRAFT VORTEX WAKE INTENSITY

    SBC: CONTINUUM DYNAMICS INC            Topic: N/A

    THERE DOES NOT EXIST TODAY A UNIFIED MEANS OF EVALUATING THE VORTEX INTENSITY BEHIND COMMERCIAL JET LINERS PRIOR TO PROTOTYPE DEVELOPMENT AND TESTING AT FULLSCALE. OVER THE PAST SEVERAL YEARS, DATA AND ANALYTICAL DEVELOPMENTS HAVE PROVIDED MUCH ADDITIONAL TECHNOLOGY WHICH MAY MAKE POSSIBLE THE PREDICTION OF WAKE INTENSITY AND DECAY FROM FIRST PRINCIPLES. THE OBJECT OF THIS INVESTIGATION IS TO DEMO ...

    SBIR Phase II 1985 Department of Transportation
US Flag An Official Website of the United States Government