You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
IMPROVEMENT OF AIR VOID ANALYSIS OF FRESH CONCRETE
SBC: Technical Innovations Topic: N/AWE WILL DETERMINE THE FEASIBILITY OF IMPROVED METHODS FOR DETERMING AIR CONTENT IN FRESH CONCRETE. WE EXPECT THAT A STUDY OF VOLUME CHANGE WITH VARYING PRESSURE AND VACUUM WILL LEAD TO A METHOD THAT WILL INDICATE BOTH AIR CONTENT AND VOID SIZE, AND YIELD AIR CONTENTS THAT T ARE UNAFFECTED BY THE NONTHEORETICAL COMPRESSIBILITY OF SMALL VOIDS. WE WILL DETERMINE THE FEACIBILITY OF SIMPLER METHODS OF ...
SBIR Phase II 1987 Department of Transportation -
LOW COST SMART MAGNETOMETER FOR TRAIN DETECTION/MONITORING
SBC: KVH INDUSTRIES, INC. Topic: N/APRESENT TRAIN DETECTION SCHEMES RELY LARGELY ON A LOW RESISTANCE THROUGH THE TRAIN'S WHEELS TO PERTURBATE A STABLE ELECTRICAL CIRCUIT. WHILE ELEGANT IN PRINCIPLE, THE DESIGN IS PLAGUED BY OXIDE FILMS AND MATERIAL BUILDUP ON THE RAIL, SNEAK PATHS THROUGH THE BALLAST AND OTHER UNCONTROLLABLE VARIABLES. KVH INDUSTRIES PROPOSES TO DESIGN AND DELIVER A "SMART MAGNETOMETER"-BASED SENSOR PACKAGE WHICH WI ...
SBIR Phase II 1995 Department of Transportation -
COMPUTER-BASED PAVEMENT DISTRESS IDENTIFICATION SYSTEM
SBC: Eres Consultants Inc. Topic: N/APAVEMENT DISTRESS DATA ARE UTILIZED DURING PAVEMENT EVALUATION, DESIGN, REHABILITATION, MAINTENANCE, MANAGEMENT, AND RESEARCH. CURRENTLY, THE MANUAL SURVEY METHOD, UTILIZING PAPER AND PENCIL, IS USED EXTENSIVELY IN COLLECTING THE DISTRESS DATA, BUT THIS PROCESS IS SLOW, TEDIOUS, EXPENSIVE, AND PRONE TO HUMAN ERROR. THE OBJECTIVE OF THIS RESEARCH IS TO DEVELOP A COMPUTERIZED PAVEMENT DISTRESS DATA ...
SBIR Phase II 1995 Department of Transportation -
Advanced Truck for High Speed Freight Operations
SBC: Sharma & Associates, Inc. Topic: N/ADuring Phase I of the project, Sharma & Associates, Inc. developed a concept for a high speed freight truck intended for 70-ton, regular freight and bi-modal operation at speeds up to 150 mph. The truck uses a rigid frame and an independent, compliant, primary suspension for its basic architecture. Constant contact side-bearings and yaw dampers were also added to improve dynamic performance. Ve ...
SBIR Phase II 2004 Department of Transportation