You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ELIMINATION OF TURBULENCE-INDUCED STRUCTURAL FAILURE AND CONTROL LOSS IN VERY LIGHT AIRCRAFT

    SBC: Daedalus Research Inc.            Topic: N/A

    A SYSTEM UTILIZING THE FREE-WING CONCEPT HAS BEEN DESIGNED FOR LIGHT AND VERY LIGHT WING-LOADING AIRCRAFT THAT ACCOMMODATES MODERATE TO HEAVY TURBULENCE WITHOUT TRANSMITTING HIGH GUST LOADINGS TO THE AIRFRAME OR THREATENING LOSS OF CONTROL. THE PROJECT WILL TEST THE SYSTEM IN A RESEARCH VEHICLE APPROXIMATING THE DESIGN CRITERIA SET FORTH IN 14 CFR, PART 103; THE RESEARCH VEHICLE IS UNMANNED.

    SBIR Phase II 1985 Department of Transportation
  2. INFLATABLE STRUCTURES FOR ENHANCED SIDE IMPACT CRASH PROTECTION

    SBC: Collison Safety Engineer Inc            Topic: N/A

    THIS PROPOSAL DESCRIBES A SIX-MONTH PROGRAM FOR THE INVESTIGATION INTO THE TECHNICAL FEASIBILITY OF A DEPLOYABLE, DOOR-MOUNTED PAD FOR ENHANCING THE PROTECTION LEVEL AFFORDED FRONT SEAT OCCUPANTS BY VEHICLES STRUCK IN THE SIDE DOOR AREA. THE CONCEPT PROPOSED FOR INVESTIGATION IS AN INFLATABLE STRUCTURE INTEGRATED INTO A PRODUCTION-CONFIGURED SMALL CAR DOOR. UPON IMPACT OF THE DOOR A STORED GAS OR ...

    SBIR Phase I 1987 Department of Transportation
  3. URBAN TRANSIT COST RECOVERY FEASIBILITY STUDY

    SBC: Williams-kuebelbeck & Assc Inc            Topic: N/A

    URBAN TRANSIT IMPROVEMENTS ENHANCE THE VALUE OF THE PROPERTY THEY SERVE. TRADITIONAL URBAN TRANSIT FINANCING TECHNIQUES NEGLECT THIS POTENTIAL SOURCE OF REVENUE. BENEFIT ASSESSMENT DISTRICTS AND IMPACT MITIGATION FEES, BASED ON CONCEPTS ORIGINALLY DEVISED FOR MINOR IMPROVEMENTS (EG. SIDEWALKS), HAVE BEEN APPLIED EXPERIMENTALLY TO URBAN TRANSIT, BUT DO NOT GENERATE THE MAJOR FUNDING URBAN TRANSIT R ...

    SBIR Phase I 1987 Department of Transportation
  4. LOW COST SMART MAGNETOMETER FOR TRAIN DETECTION/MONITORING

    SBC: KVH INDUSTRIES, INC.            Topic: N/A

    PRESENT TRAIN DETECTION SCHEMES RELY LARGELY ON A LOW RESISTANCE THROUGH THE TRAIN'S WHEELS TO PERTURBATE A STABLE ELECTRICAL CIRCUIT. WHILE ELEGANT IN PRINCIPLE, THE DESIGN IS PLAGUED BY OXIDE FILMS AND MATERIAL BUILDUP ON THE RAIL, SNEAK PATHS THROUGH THE BALLAST AND OTHER UNCONTROLLABLE VARIABLES. KVH INDUSTRIES PROPOSES TO DESIGN AND DELIVER A "SMART MAGNETOMETER"-BASED SENSOR PACKAGE WHICH WI ...

    SBIR Phase II 1995 Department of Transportation
US Flag An Official Website of the United States Government