You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY21 is not expected to be complete until September, 2022.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

  1. AUTOMATED VIDEO DATA REDUCTION SYSTEM

    SBC: Dba Systems, Inc.            Topic: N/A

    DBA SYSTEMS, INC. PROPOSES TO FABRICATE AN ENGINEERING MODEL OF A PC-BASED VIDEO MENSURATION SYSTEM FOR THE DETAILED HUMAN FACTORS ANALYSIS ASSOCIATED WITH MOTOR VEHICLE OPERATION. THE BASELINE FOR THIS SYSTEM WILL BE DBA'S OFF-THE-SHELF 626 VIDEO TRACKER THAT TRACKS VIDEO IMAGES AT REAL-TIME RATES (60 HZ). ENHANCEMENBTS WILL INCLUDE THE DEVELOPMENT OF REAL-TIME FITTING AND LATERAL POSITIONING ALG ...

    SBIR Phase II 1995 Department of Transportation
  2. Build a Prototype "Grid In A Box" Software Product for NOAA

    SBC: FAIRFIELD TECHNOLOGIES INC.            Topic: 817

    Brief Description of Problem: NOAA¿s AWIPS is a cornerstone of NWS¿ forecast mission. As advanced as AWIPS is, it still faces challenges similar to many systems, including: system capacity over-/under-utilization; data and analysis stovepiping; and complex data management needs. Innovations: In Phase 1, FTI successfully demonstrated that grid computing and ontologies could enable communicati ...

    SBIR Phase II 2004 Department of Commerce
  3. LOW COST HRPT DIRECT READOUT STATION

    SBC: International Systems & Soft-            Topic: N/A

    THIS ABSTRACT COVERS THE PROPOSED DESIGN OF A LOW COST HRPT DIRECT READOUT STATION FOR A COST OF LESS THAN $100K DOLL ARS. THIS CONCEPT UTILIZES STATE-OF-THE-ART TECHNOLOGY PROVEN SUCCESSFUL IN COMMERCIAL APPLICATIONS. THE SUCCESSFULDEVELOPMENT OF THE LOW-COST HRPT STATION WILL OPEN A COMMERCIAL AND GOVERNMENT MARKET THAT HAS A NEED FOR CURRENT WEATHER INFORMATION. THESE POTENTIAL USERS HAVE DELAY ...

    SBIR Phase II 1987 Department of Commerce
  4. LOW COST SMART MAGNETOMETER FOR TRAIN DETECTION/MONITORING

    SBC: KVH INDUSTRIES, INC.            Topic: N/A

    PRESENT TRAIN DETECTION SCHEMES RELY LARGELY ON A LOW RESISTANCE THROUGH THE TRAIN'S WHEELS TO PERTURBATE A STABLE ELECTRICAL CIRCUIT. WHILE ELEGANT IN PRINCIPLE, THE DESIGN IS PLAGUED BY OXIDE FILMS AND MATERIAL BUILDUP ON THE RAIL, SNEAK PATHS THROUGH THE BALLAST AND OTHER UNCONTROLLABLE VARIABLES. KVH INDUSTRIES PROPOSES TO DESIGN AND DELIVER A "SMART MAGNETOMETER"-BASED SENSOR PACKAGE WHICH WI ...

    SBIR Phase II 1995 Department of Transportation
  5. Low Cost Transverse Rail Defect Detector

    SBC: WavesinSolids LLC            Topic: N/A

    This project will use an ultrasonic beam traveling logitudinally along the rail rather than the complex normal and angle-beams transducer assemblies in current systems. Detectio of transverse defects becomes a simple pulse-echo application and resolves many inherent speed, inspectin reliability and robustness problems in current rail inspection systems. The simplified procedure will increase the r ...

    SBIR Phase II 2004 Department of Transportation
US Flag An Official Website of the United States Government