You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Protocol-Transparent, Universal Optical Front-End for 10 Gb/s Network Interface Cards

    SBC: Acadia Optronics, Llc            Topic: 40

    72905-High speed networks will be required to deliver the large data volumes associated with DOE science experiments. Deployment scenarios for 10 Gb/s enterprise and access networks will require optical interfaces capable of spanning distances from 100 m to 10 km. Presently available 10 Gb/s optical front-ends are not generally applicable because they are either lacking in capability or are too ...

    SBIR Phase II 2004 Department of Energy
  2. Advanced High Temperature Dielectric Material

    SBC: Active Signal Technologies, Inc.            Topic: BMDO00014

    Active Signal Technologies and Alfred University have brought together a broad-based industrial consortium to rapidly advance the development and commercialization of bismuth sodium titanate (BNT), a novel high performance capacitor material for use in both high-temperature and high-field applications. While the dielectric properties of our Phase I BNT show great promise, this is a new-comer to t ...

    SBIR Phase II 2004 Department of DefenseMissile Defense Agency
  3. Brain Trauma Assessment System

    SBC: Active Signal Technologies, Inc.            Topic: N/A

    Active Signal Technologies proposes to further develop and field-test its innovative hand-held Brain Trauma Assessment System (BTAS) with the objective of equipping EMS providers to directly measure brain pathology with sufficient sensitivity to confident

    SBIR Phase II 2004 Department of Health and Human ServicesNational Institutes of Health
  4. Environmental Mission Planner- The Total Solution

    SBC: ADAPTIVE METHODS, INC.            Topic: N02152

    The objective of this research is to develop alternatives for a total planning system solution for use of environmental sensor data for the tactical ASW warfighter. This software will be used for pre-flight planning to evaluate alternatives and develop effective tactical search plans based on available environmental data and threat data, to provide recommendations for additional insitu environm ...

    SBIR Phase II 2004 Department of DefenseNavy
  5. Environmental Sensor Simulation System

    SBC: ADAPTIVE METHODS, INC.            Topic: N02182

    The objectives of this research are to design and develop a software prototype of a realistic ocean simulation system primarily to support development of environmental sensors through more precise evaluation of sensor design alternatives. This simulation system, the Environmental Sensor Simulation System (ESSS), must accurately represent the ocean''s spatial, azimuthal and temporal dependencies. ...

    SBIR Phase II 2004 Department of DefenseNavy
  6. Robust Towed Array Beamforming

    SBC: ADAPTIVE METHODS, INC.            Topic: N03146

    In Phase I Robust Towed Array Beamforming (RTAB) work, Applied Hydro-Acoustics Research, Inc. (AHA) developed and tested several candidate algorithms, including a data-adaptive "Hole-Filling" algorithm, that recover losses of acoustic performance resulting from acoustic channels failures. With SURTASS TwinLine-R sea-test data we have shown a 2 to 3 dB improvement in quiet beam levels by "hole-fill ...

    SBIR Phase II 2004 Department of DefenseNavy
  7. EMISSION STRATEGIES AND OPERATIONS IN MODERN NAVAL COMBAT SYSTEMS

    SBC: Adler Consultants, Inc.            Topic: N/A

    EMISSION CONTROL (EMCON), INCLUDING RADAR EMISSION MANAGEMENT, IS A SUBDIVISON OF THE MUCH GREATER SUBJECT OF BATTLE MANAGEMENT. AT PRESENT, THERE IS NOT A FULL DEVELOP AND NAVY ACCEPTED TECHNIQUE FOR EXAMINING THE ENTIRE TECHNICAL MANAGEMENT OF POTENTIAL SEA BATITLES. THIS PROPOSED EFFORT WILL FOCUS ON A VALUABLE SUBSET OF BATTLE STRATEGY, THE INTERPLAY BETWEEN ELECTROMAGNETIC EMISSION CONTROL AN ...

    SBIR Phase II 1985 Department of DefenseNavy
  8. Low-Cost Wireless Shipboard Local Area Network

    SBC: 3E TECHNOLOGIES INTERNATIONAL, INC.            Topic: N02042

    This Phase II proposal outlines a development plan for a low-cost Wireless LAN system to address the need for reducing wireless signal degradation associated cost to meet the modem NAVY shipboard communication requirements. AEPTEC has concluded from the Phase I of the work that Ultra-wide band (UWB) and SoftRadio are two prominent technologies could affect WLAN design most in terms of achieving m ...

    SBIR Phase II 2004 Department of DefenseNavy
  9. Intrusion detection for 802.11 networks

    SBC: 3E TECHNOLOGIES INTERNATIONAL, INC.            Topic: OSD02WT02

    This Phase II proposal outlines the development plan, including implementation, prototyping, and demonstration of a Wireless Intrusion Detection and Security Management Solution (WIDSMS) to provide early warning and directional indication of intrusion attempts to the protected wireless network, assessment of the threat or RF anomaly, recommended response actions in the form of operator notificatio ...

    SBIR Phase II 2004 Department of DefenseNavy
  10. Anti-Terrorism- Survivability and Denial

    SBC: ADVANCED TECHNOLOGY AND RESEARCH CORPORATION            Topic: N022072

    The phase II effort is to refine the analytical and finite-element analyses tools developed under phase I to the design and analyses of low-cost protective structures to mitigate shock loading on Naval ships and National infrastructure such as dams, bridges, dry docks, etc. The phase II approach will advance the phase I methodology utilizing sandwich panels constructed of high-strength steel face ...

    SBIR Phase II 2004 Department of DefenseNavy
US Flag An Official Website of the United States Government