You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. High Resolution Hyperspecral System for Rapid Coastal Marine Geophysical Data Acquisition and Processing

    SBC: ADVANCED POWER TECHNOLOGIES, INC.            Topic: N/A

    N/A

    SBIR Phase II 2000 Department of Commerce
  2. Build a Prototype "Grid In A Box" Software Product for NOAA

    SBC: FAIRFIELD TECHNOLOGIES INC.            Topic: 817

    Brief Description of Problem: NOAA¿s AWIPS is a cornerstone of NWS¿ forecast mission. As advanced as AWIPS is, it still faces challenges similar to many systems, including: system capacity over-/under-utilization; data and analysis stovepiping; and complex data management needs. Innovations: In Phase 1, FTI successfully demonstrated that grid computing and ontologies could enable communicati ...

    SBIR Phase II 2004 Department of Commerce
  3. Innovative Manufacturing Methods for Diamond Indenters

    SBC: Gilmore Diamond Tools, Inc.            Topic: N/A

    N/A

    SBIR Phase II 2000 Department of Commerce
  4. LOW COST SMART MAGNETOMETER FOR TRAIN DETECTION/MONITORING

    SBC: KVH INDUSTRIES, INC.            Topic: N/A

    PRESENT TRAIN DETECTION SCHEMES RELY LARGELY ON A LOW RESISTANCE THROUGH THE TRAIN'S WHEELS TO PERTURBATE A STABLE ELECTRICAL CIRCUIT. WHILE ELEGANT IN PRINCIPLE, THE DESIGN IS PLAGUED BY OXIDE FILMS AND MATERIAL BUILDUP ON THE RAIL, SNEAK PATHS THROUGH THE BALLAST AND OTHER UNCONTROLLABLE VARIABLES. KVH INDUSTRIES PROPOSES TO DESIGN AND DELIVER A "SMART MAGNETOMETER"-BASED SENSOR PACKAGE WHICH WI ...

    SBIR Phase II 1995 Department of Transportation
  5. URBAN TRANSIT COST RECOVERY FEASIBILITY STUDY

    SBC: Williams-kuebelbeck & Assc Inc            Topic: N/A

    URBAN TRANSIT IMPROVEMENTS ENHANCE THE VALUE OF THE PROPERTY THEY SERVE. TRADITIONAL URBAN TRANSIT FINANCING TECHNIQUES NEGLECT THIS POTENTIAL SOURCE OF REVENUE. BENEFIT ASSESSMENT DISTRICTS AND IMPACT MITIGATION FEES, BASED ON CONCEPTS ORIGINALLY DEVISED FOR MINOR IMPROVEMENTS (EG. SIDEWALKS), HAVE BEEN APPLIED EXPERIMENTALLY TO URBAN TRANSIT, BUT DO NOT GENERATE THE MAJOR FUNDING URBAN TRANSIT R ...

    SBIR Phase I 1987 Department of Transportation
US Flag An Official Website of the United States Government