You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Synoptic Approach to Harmonize Discrete Data Streams in Application Development

    SBC: IT WORKS! INC.            Topic: 180NH1

    Research conducted in Phase I identified a range of data sources providing vehicle related information to consumers shopping around or interested in knowing more about vehicles. Majority of the commercial data sources focused on vehicle features, new/used/CPO pricing, and vehicles listings. Such data sources lacked safety as their central focus, which is a concern for U.S. Department of Transporta ...

    SBIR Phase II 2019 Department of Transportation
  2. The S0 UAS, an Air Deployed Solution for Boundary Layer Observations in Turbulent Environments

    SBC: BLACK SWIFT TECHNOLOGIES LLC            Topic: 8213

    Previous efforts have demonstrated that targeted observations of tropical storms by UAS can provide extremely valuable data sets for improving forecasts and models, but are also difficult to obtain. A number of obstacles including regulations and the distance required to intercept evolving storms have limited the number of land based flights. The use of airborne deployed UAS have recently overcome ...

    SBIR Phase II 2019 Department of CommerceNational Oceanic and Atmospheric Administration
  3. Development of a Solar Powered Aerosol Reference Calibrator

    SBC: Access Sensor Technologies LLC            Topic: 813

    This project will develop and demonstrate an inexpensive and portable calibration system for low-cost aerosol sensors. Current calibration methods are cost prohibitive and lack generalizability from one location (or season) to the next, making them impractical for implementation. Access Sensor Technologies (AST) proposes to improve and validate a solar powered aerosol reference calibrator (SPARC) ...

    SBIR Phase II 2019 Department of CommerceNational Oceanic and Atmospheric Administration
  4. COMPUTER TECHNOLOGY TO EVALUATE AIRCRAFT VORTEX WAKE INTENSITY

    SBC: CONTINUUM DYNAMICS INC            Topic: N/A

    THERE DOES NOT EXIST TODAY A UNIFIED MEANS OF EVALUATING THE VORTEX INTENSITY BEHIND COMMERCIAL JET LINERS PRIOR TO PROTOTYPE DEVELOPMENT AND TESTING AT FULLSCALE. OVER THE PAST SEVERAL YEARS, DATA AND ANALYTICAL DEVELOPMENTS HAVE PROVIDED MUCH ADDITIONAL TECHNOLOGY WHICH MAY MAKE POSSIBLE THE PREDICTION OF WAKE INTENSITY AND DECAY FROM FIRST PRINCIPLES. THE OBJECT OF THIS INVESTIGATION IS TO DEMO ...

    SBIR Phase II 1985 Department of Transportation
  5. UNDER IFR CONDITIONS, AIRPORT CAPACITY IS CURRENTLY LIMITED BY FAA SEPARATION STANDARDS BETWEEN AIRCRAFT.

    SBC: CONTINUUM DYNAMICS INC            Topic: N/A

    UNDER IFR CONDITIONS, AIRPORT CAPACITY IS CURRENTLY LIMITED BY FAA SEPARATION STANDARDS BETWEEN AIRCRAFT. THESE STANDARDS ARE SET TO AVOID A LANDING ENCOUNTER WITH A VORTEX WAKE. IF AN ONBOARD VORTEX SENSOR AN ESCAPE SYSTEM COULD BE DEVELOPED WHICH IS BOTH RELIABLE AND INEXPENSIVE, THE A AVIATION COMMUNITY COULD BENEFIT BY DECREASED TERMINAL DELAYS WITHOUT COMPROMISING SAFETY. THE CONCEPT TO BE ST ...

    SBIR Phase I 1985 Department of Transportation
  6. AN ICING DETECTION SYSTEM BASED ON OPTICAL REFRACTOMETRIC TECHNIQUES IS DECRIBED IN THE PROPOSAL.

    SBC: First Omega Group Inc            Topic: N/A

    AN ICING DETECTION SYSTEM BASED ON OPTICAL REFRACTOMETRIC TECHNIQUES IS DECRIBED IN THE PROPOSAL. THE FIRST OMEGA GROUP, INC. PROPOSES TO DEMONSTRATE THE APPLICABILITY OF THIS CONCEPT TO ENABLE THE CONSTRUCTION OF INSTRUMENTATION THAT AUTOMATICALLY DETERMINES THE ONSET, DURATION, ACCU MULATION AND DISSOLUTION OF ICING ON AIRPORT RUNWAYS, PARKEDAIRCRAFT, AIRPORT NAVIGATIONAL AID STRUCTURES, ETC. TH ...

    SBIR Phase I 1985 Department of Transportation
  7. MDA PROPOSES TO DESIGN, TEST AND MARKET A NEW DRIVERS LICENSE TEST UTILIZING THE INTERACTIVE CAPABILITIES OF F COMPUTER MEDIATED VIDEODISC SYSTEMS.

    SBC: Media Design Associates, Inc.            Topic: N/A

    MDA PROPOSES TO DESIGN, TEST AND MARKET A NEW DRIVERS LICENSE TEST UTILIZING THE INTERACTIVE CAPABILITIES OF F COMPUTER MEDIATED VIDEODISC SYSTEMS. CURRENT WRITTEN DRIVERSTESTS WILL BE ANALYZED AND MORE VALID TEST ELEMENTS WILL BE DESIGNED TO MEASURE UNDERSTANDING IN THESE CONTENT AREAS. THE NEW COMPUTER MEDIATED VIDEODISC SYSTEMS PERMIT THE TESTING OF PERFORMANCE. THE SIMULATION POSSIBILITIES WIL ...

    SBIR Phase I 1985 Department of Transportation
  8. RUNWAYS

    SBC: Ophir Corporation            Topic: N/A

    A RUNWAY-IMPLANTABLE ELECTRONIC SENSOR IS PROPOSED FOR MEASUREMENT OF ICE ACCUMULATION ON AIRPORT RUNWAYS AND NAVIGATION AID STRUCTURES. THE SENSOR OPERATES BY MEASURING PHASE AND FREQUENCY RESOLVED DIFFERENTIAL ELECTRIC FIELD FLUCTUATIONS WITHIN AN AIR/ICE DIELECTRIC LAYER IN RESPONSE TO AN APPLIED VOLTAGE WAVEFORM ON A RUNWAY-IMPLANTED INSUL ATED SENSOR PLATE. THE SIGNIFICANT FREQUENCY DEPENDENC ...

    SBIR Phase I 1985 Department of Transportation
  9. DIFFERENTIALLY DRIVEN GENERATORS (DDG)

    SBC: Transmission Technology Co Inc            Topic: N/A

    TRADITIONALLY, SHIPBOARD POWER GENERATION IS ACCOMPLISHED VIA AUXILIARY ENGINES AND GENERATOR SETS. SIGNIFICANT COST ADVANTAGES CAN BE PROJECTED IF THIS ELECTRICAL DEMAND COULD BE MET BY EXTRACTING POWER FROM THE SHIP'S PRIME MOVER. TO ACCOMPLISH THIS, AND TO MAINTAIN A CONSTANT FREQUENCY ON THEGENERATOR WHILE THE SPEED OF THE PRIME MOVER VARIES OVER A WIDE RANGE, THIS CONTRACTOR PROPOSES THE USE ...

    SBIR Phase I 1985 Department of Transportation
  10. OPERATIONS

    SBC: Transmission Technology Co Inc            Topic: N/A

    COST OF CARGO HANDLING OPERATIONS CAN BE REDUCED BY EQUIPMENT THAT USES LESS TIME AND ENERGY TO PERFORM AND RANDREQUIRES LESS MANPOWER TO OPERATE, MONITOR, AND MAINTAIN. ONE OBJECTIVE OF THIS PROPOSAL IS TO EVOLVE A PRELIMINARY DESIGN OF A REPRESENTATIVE PIECE OF MACHINERY, NAMELY A MOORING/WARPING AUTOMATIC TENSIONING WINCH USING ADVANCED ELECTRO-MECHANICAL TECHNOLOGY, ELIMINATING HYDRAULICS AND ...

    SBIR Phase I 1985 Department of Transportation
US Flag An Official Website of the United States Government