You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. DEGRATION OF NUCLEAR PLANT TEMPERATURE SENSORS

    SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION            Topic: N/A

    SAFETY SYSTEM TEMPERATURE SENSORS IN NUCLEAR POWER PLANTS ARE SUBJECT TO PERFORMANCE DEGRATION BECAISE PF AGING EFFECTS. A PROGRAM OF LABORATORY TESTING AND IN-SITU TESTINGIS NEEDED TO ENSURE THAT AGING DOES NOT LEAD TO REDUCED SAFETY AND AVAILABILITY. MUCH OF THE TECHNOLOGY NEEDED FOR THIS PROGRAM NOW EXISTS AS ISOLATED METHODS AND PROCEDURES. THESE WILL BE USED IN THIS PROJECT TO PERFORM AN AGIN ...

    SBIR Phase II 1987 Nuclear Regulatory Commission
  2. "EXTENDING A HCLPF-BASED SEISMIC MARGIN REVIEW TO ANALYZE PLANT DAMAGE STATES AND THE ROLE OF HUMAN FACTORS AND NON-SEISMIC FAILURES"

    SBC: Future Resources Associate Inc            Topic: N/A

    TECHNIQUES HAVE RECENTLY BEEN DEVELOPED TO ANALYZE THE 'SEISMIC MARGIN' OF A NUCLEAR POWER PLANT USING THE HCLPF CONCEPT (HIGH CONFIDENCE OF A LOW PROBABILITY OF FAILURE). STARTING WITH AN EARTHQUAKE LEVEL SHOSEN FOR MARGIN REVIEW, THE TECHNIQUE DETERMINES WHETHER THE PLANT CAN OR CANNOT 'WITHSTAND THE REVIEW-EARTHQUAKE WITHOUT CORE DAMAGE. HERE 'WITHSTAND' MEANS 'WITHSTAND WITH A HIGH CONFIDENCE ...

    SBIR Phase II 1987 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government