Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until June, 2020.

  1. Dual Plane 3D Compton Scattering Imager with Pixelated CZT Detectors for 1-10MeV Gamma Ray

    SBC: H3D            Topic: None

    Phase I has proven that the current setup achieves better than 8mm spatial resolution for 2.2MeV prompt gammas. However, 1mm spatial resolution presents a significant challenge for the current setup due in part to limited timing resolution and count rate. A new analog ASIC will be developed to replace the current analog ASIC that will have better timing resolution and deliver higher count rates. I ...

    SBIR Phase II 2019 Department of CommerceNational Institute of Standards and Technology
  2. Advanced Instrumentation for Non-Nulling Stack Velocity Testing

    SBC: AIRFLOW SCIENCES CORPORATION            Topic: None

    Industrial facilities, manufacturing plants, and electric power plants that burn fossil fuels exhaust the combustion products to atmosphere through their smokestacks. Stack pollutant emissions are quantified using manual testing methods developed in the 1960s, which are prone to error if non-axial flow exists in a stack.Recently, NIST has been working on an improved technique of performing 3D flow ...

    SBIR Phase I 2019 Department of CommerceNational Institute of Standards and Technology
  3. Development of a Neutron-based Nondestructive Test Method for Concrete Petrography and Chemical Analysis

    SBC: TOURNEY CONSULTING GROUP, LLC            Topic: None

    To evaluate the technical feasibility of prompt gamma neutron activation (PGAA) as an alternative to a set of standard destructive tests of concrete petrography including aggregate type, water/cement ratio, aggregate/binder ratio, density, chloride content and chloride bulk diffusion constant; and to determine the specifications for the design of a dedicated commercial laboratory-based PGAA facili ...

    SBIR Phase I 2019 Department of CommerceNational Institute of Standards and Technology
  4. Reusable Pilot Vehicle Interface (PVI) Components and Widgets using ARINC 661 and FACE Architectures

    SBC: ART OFFICE CORP.            Topic: A17082

    Attempts to reuse modern graphical software applications are met with difficulty because avionics applications are typically developed with a specific platform in mind; in these instances, portability is an afterthought. This proposal provides a solution for prioritizing and maximizing the reuse of graphical avionics systems by detailing an innovative software development process and reference arc ...

    SBIR Phase II 2019 Department of DefenseArmy
  5. Prototyping of GPS Interference Mitigation Module

    SBC: Qunav LLC            Topic: A17119

    Phase II effort will develop and implement an embedded prototype of GPS Interference Mitigation Module (GIMM) as a tailored design of the overall Exploitation of Discrete GPS Interference for Enhanced Navigation (EDGE) technology toward a higher potential for transitioning to fielded systems. Phase II will build on Phase I algorithmic components and their feasibility demonstration results. Main ob ...

    SBIR Phase II 2019 Department of DefenseArmy
  6. Wide bandgap, bi-directional, high voltage DC-DC converter

    SBC: GLOBAL EMBEDDED TECHNOLOGIES, INC            Topic: A18103

    On military vehicles, high voltage power architectures shrink component size, weight & cooling, improve fuel efficiency, optimize vehicle performance, and reduce noise to ultimately increase defense and mission capabilities. Advanced high voltage electrical loads are being created and the electrification of loads allows for the removal of constant mechanical drag on the engine, an increase in effi ...

    SBIR Phase I 2019 Department of DefenseArmy
  7. Power Conditioning Surge Module

    SBC: MAINSTREAM ENGINEERING CORPORATION            Topic: A18139

    Standalone power systems and tactical microgrids are used by the Army to provide power to equipment used in theater. Unlike a full-scale power grid, Army tactical microgrids are powered by 60 kW generators. Because these generators are very small sources compared to those on a full-scale power grid, they are sensitive to power surges, inrush current, and current harmonics generated by non-linear l ...

    SBIR Phase I 2019 Department of DefenseArmy
  8. Robust Transport Service Aligned to the FACE Technical Standard 3.0

    SBC: Jovian Software Consulting LLC            Topic: A18111

    The Transport Services Segment (TSS) provides integral capabilities that support system integration, software reuse, and fast fielding.Current implementations of the TSS only cover the basic features from the standard.Tool support and the overall maturity of the TSS solutions are limited.Our vision of the TSS solution is a Transport Services Development Kit (TSDK) that is open and extendible.Due t ...

    SBIR Phase I 2019 Department of DefenseArmy
  9. Armor support ring optimization

    SBC: GS ENGINEERING, INC.            Topic: A18156

    Current tactical vehicles are designed in a high-paced environment where trade studies to determine optimal materials and manufacturing processes cannot be contained within product development timelines.GS Engineering proposes to develop a process and complimentary tools to facilitate more rapid informed decision making along these lines.The armor support ring for the Armored Multi-Purpose Vehicle ...

    SBIR Phase I 2019 Department of DefenseArmy
  10. High-Speed Cryogenic Optical Connector for Focal Plane Array Read-out

    SBC: SDPHOTONICS LLC            Topic: A17022

    This proposal is to develop and implement a cryogenic optical data link into an infrared camera that includes a focal plane array. The cryogenic optical data link uses a specially designed laser that can achieve very low bit energy and very low optical loss in cryogenic environments. The laser is a vertical cavity surface emitting laser (VCSEL) that is designed to reach high reliability and high e ...

    SBIR Phase II 2019 Department of DefenseArmy
US Flag An Official Website of the United States Government