You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Dual Plane 3D Compton Scattering Imager with Pixelated CZT Detectors for 1-10MeV Gamma Ray
SBC: H3D INC Topic: NonePhase I has proven that the current setup achieves better than 8mm spatial resolution for 2.2MeV prompt gammas. However, 1mm spatial resolution presents a significant challenge for the current setup due in part to limited timing resolution and count rate. A new analog ASIC will be developed to replace the current analog ASIC that will have better timing resolution and deliver higher count rates. I ...
SBIR Phase II 2019 Department of CommerceNational Institute of Standards and Technology -
Safe, High Energy Batteries for Space Suits
SBC: NOHMS TECHNOLOGIES INC Topic: H4NASA requires breakthrough battery cell technologies that are much safer than current state-of-the-art lithium-ion cell technologies in order to achieve NASAs far-term energy storage goals for human and robotic missions. A new generation of spacesuits is needed to support EVAs for future surface exploration missions. These new suits will require decreased mass and volume, improved functionality, a ...
SBIR Phase II 2019 National Aeronautics and Space Administration -
Capacitive Vector Skin Friction Measurement Systems for Complex Flow Fields
SBC: INTERDISCIPLINARY CONSULTING CORP Topic: A1The Interdisciplinary Consulting Corporation (IC2) proposes to continue development of dual-axis shear stress sensors that are applicable in ground test facilities covering a large range of flow speeds in response to NASA SBIR 2018 Phase I solicitation subtopic A1.08. The proposed sensing system addresses a critically unmet measurement need in NASArsquo;s technology portfolio, specifically the abi ...
SBIR Phase II 2019 National Aeronautics and Space Administration -
4.3 GHz Passive Wireless Sensor System
SBC: Pegasense, LLC Topic: Z11The purpose of this Phase II proposal is development of a completely operational 4.3 GHz passive sensor system that will be compliant in the newnbsp;Wireless Avionics Intra-Communications (WAIC) band.nbsp;nbsp;This band will be useful to both space and aerospace, and the center frequency significantly advances SAW sensor device capabilities to very high frequencies.nbsp;nbsp;The focus of the effor ...
SBIR Phase II 2019 National Aeronautics and Space Administration -
Three Band Thermal Infrared Detector for CubeSats and UAS
SBC: XIOMAS TECHNOLOGIES LLC Topic: S1The proposed Phase II prototype will deliver high spatial resolution, wide field of view, high signal to noise performance, and three spectral bands.nbsp; The system includes onboard processing to extract the information of greatest value, orthorectify the imagery, and reduce the size of the data for transmission.nbsp; This sensor system is designed to fit within the size, weight, and power (SWaP) ...
SBIR Phase II 2019 National Aeronautics and Space Administration -
Ultra-Compact, Field-Deployable, Quantum-Compatible Receiver for Free-Space Optical Communication
SBC: Quantum Opus, LLC Topic: H9Quantum Opus is excited to propose compactifying, enclosing, and automating ALL of the required vacuum, cryogenics, and electrical systems of a superconducting nanowire single-photon detection system into a 14-inch tall by 17-inch wide by 18-inch deep package and re-engineering the optical collection mechanisms to be compatible with existing NASA telescope infrastructure. The end product will be a ...
SBIR Phase II 2019 National Aeronautics and Space Administration -
Broadband Vector Vortices for High Contrast Coronagraphy
SBC: BEAM ENGINEERING FOR ADVANCED MEASUREMENTS CO. Topic: S2The requirement of detecting nearly ten orders of magnitude smaller signal of a planet compared to the nearby star puts forward extreme challenges for coronagraphs designed for exoplanet imaging. Vector vortex waveplates (VWs) appear to be capable of providing best performance compared to other mask technologies due to their structure as thin film coatings of continuous texture that minimizes ligh ...
SBIR Phase II 2019 National Aeronautics and Space Administration -
5 Watt per Kilogram Tritium Betavoltaic
SBC: CITY LABS, INC. Topic: S3The central goal of this Phase II effort is to create the worldrsquo;s first milliwatt scale betavoltaic. This project will utilize an ultra-thin, light weight, betavoltaic p/n junction, developed in Phase I, that increases the efficiency of betavoltaic devices from 8% to greater than 10% based on the incident tritium beta flux.nbsp; Betavoltaic power sources offer advantages under conditions that ...
SBIR Phase II 2019 National Aeronautics and Space Administration -
Glass Alloy in Microgravity (GAMMA)
SBC: Made In Space, Inc. Topic: H8MIS is pioneering the use of the microgravity environment on the International Space Station (ISS) for manufacturing technology and product development. MIS has leveraged NASA SBIR support to create the first polymer additive manufacturing machines in space, develop a hybrid additive-subtractive metal manufacturing technology, and investigate the creation of large single-crystal industrial materia ...
SBIR Phase II 2019 National Aeronautics and Space Administration -
Precision In-Space Manufacturing for Structurally-Connected Space Interferometry
SBC: Made In Space, Inc. Topic: S2Made In Space, Inc. continues the development of an in-space manufacturing architecture for precision long-baseline structures that support space interferometry missions in the infrared. In-space manufacturing and assembly of interferometer structures optimized for the target environment dramatically reduce the system cost, mass, and areal density without sacrificing the structural control of the ...
SBIR Phase II 2019 National Aeronautics and Space Administration