You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Advanced Instrumentation for Non-Nulling Stack Velocity Testing

    SBC: AIRFLOW SCIENCES CORP            Topic: None

    Industrial facilities, manufacturing plants, and electric power plants that burn fossil fuels exhaust the combustion products to atmosphere through their smokestacks. Stack pollutant emissions are quantified using manual testing methods developed in the 1960s, which are prone to error if non-axial flow exists in a stack.Recently, NIST has been working on an improved technique of performing 3D flow ...

    SBIR Phase I 2019 Department of CommerceNational Institute of Standards and Technology
  2. Development of a Neutron-based Nondestructive Test Method for Concrete Petrography and Chemical Analysis

    SBC: TOURNEY CONSULTING GROUP, LLC            Topic: None

    To evaluate the technical feasibility of prompt gamma neutron activation (PGAA) as an alternative to a set of standard destructive tests of concrete petrography including aggregate type, water/cement ratio, aggregate/binder ratio, density, chloride content and chloride bulk diffusion constant; and to determine the specifications for the design of a dedicated commercial laboratory-based PGAA facili ...

    SBIR Phase I 2019 Department of CommerceNational Institute of Standards and Technology
  3. Category-Theoretic Tool for Manufacturing-related Information Integration

    SBC: CATEGORICAL INFORMATICS, INC.            Topic: 9010173R

    Categorical theory has recently been successfully applied to translate information from one computer system to another. Researchers at MIT have developed a prototype software tool based on category theory for solving information-integration programs. The tool has successfully solved small-scale information-integration problems including a problem identified by NIST about enriching the manufacturin ...

    SBIR Phase I 2015 Department of CommerceNational Institute of Standards and Technology
  4. Large-Area, High-Uniformity Photodiodes for Infrared Trap Detectors

    SBC: AMETHYST RESEARCH INC            Topic: 9020168R

    methyst Research Inc. will design, fabricate and test a high uniformity, large area, low noise infrared trap-detector detector for the 1- 4.5 μm wavelength range. This state of the art detector will have a large area (e.g., 1-1.8 cm diameter active area) with a spatial variability of internal quantum efficiency of less than 0.1 % between 1 μm and 4.5 μm. In addition, the internal quantum effici ...

    SBIR Phase I 2015 Department of CommerceNational Institute of Standards and Technology
  5. High Speed and High Sensitivity Quadrant Photo Detector

    SBC: RADIATION MONITORING DEVICES, INC.            Topic: N/A

    To further advance the characterization and utility of microcantilevers, next generation optical detectors with higher frequency response, improved displacement resolution and lower noise for weak signal detection are needed. Consequently, Radiation Monitoring Devices, Inc. (RMD) will develop a turnkey optical detector module for use in characterizing the displacement and resonant frequencies of m ...

    SBIR Phase I 2010 Department of CommerceNational Institute of Standards and Technology
  6. Decision Support Tools for Sustainable Manufacturing

    SBC: BIMCON Inc.            Topic: N/A

    The objective of this proposal is to establish the feasibility of developing an integrated decision support tool that transforms the current time-consuming and reactive (post-design) sustainability assessment into a real-time, proactive approach available in the early phases of product design. This tool, called Sustainability Integrated into Early Design (SIED), will define and capture lifecycle-w ...

    SBIR Phase I 2010 Department of CommerceNational Institute of Standards and Technology
US Flag An Official Website of the United States Government