You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Gap-Free Model-Based Engineering for Manufacturing and Analysis: Digital Thread without Translation

    SBC: Nvariate, Inc.            Topic: None

    Modern Model-Based Enterprise / Engineering (MBE) systems rely on freeform surfaces built as complex combinations of geometric primitives to define engineered objects. Unfortunately, the intersection of freeform surfaces in MBE applications results in highly approximated solutions, degrading models that cost billions annually by US industry to fix. Current technology limits the abilities of users ...

    SBIR Phase I 2019 Department of CommerceNational Institute of Standards and Technology
  2. Advanced Manufacturing and Material Measurements Software Tool Weave ™ for the Acceleration and Automation of SEM Image Analysis in the Semiconductor Industry

    SBC: Sandbox Semiconductor Incorporated            Topic: None

    In this Phase I SBIR proposal, SandBox Semiconductor™ proposes to develop an Advanced Manufacturing and Material Measurements software tool called Weave ™ for accelerating and automating SEM image analysis for the semiconductor industry. During the development of a new manufacturing process line for a semiconductor device, tens of thousands of scanning electron microscopy (SEM) images are take ...

    SBIR Phase I 2019 Department of CommerceNational Institute of Standards and Technology
  3. Decentralized, Public, and Mobile-Based Sidewalk Inventory Tool

    SBC: KNOWLEDGE BASED SYSTEMS INC            Topic: 142FH1

    Knowledge Based Systems, Inc. (KBSI) is pleased to propose the design and development of “MySidewalk,” a mobile application that will facilitate the crowd-sourced collection of sidewalk inventory and condition assessment data. The proposed tool will utilize the recent advances in social networks, mobile data collection, and data mining to provide integrated sidewalk datasets. The proposed tool ...

    SBIR Phase I 2015 Department of Transportation
  4. Management System Display to Track Emergency Response Vehicles and Mutual Aid During a Crash Response

    SBC: LYNNTECH INC.            Topic: 142FA2

    We present the National Incident Visualization System, NIVS. NIVS is a combination of software elements that leverage the capabilities and prevalence of smart-phone technology to create a single point of reference for aggregated information and information sharing during a fire-based emergency at an airport. NIVS aggregates GPS location and status information from personnel and resources with Airp ...

    SBIR Phase I 2015 Department of Transportation
  5. Large-Area, High-Uniformity Photodiodes for Infrared Trap Detectors

    SBC: AMETHYST RESEARCH INC            Topic: 9020168R

    methyst Research Inc. will design, fabricate and test a high uniformity, large area, low noise infrared trap-detector detector for the 1- 4.5 μm wavelength range. This state of the art detector will have a large area (e.g., 1-1.8 cm diameter active area) with a spatial variability of internal quantum efficiency of less than 0.1 % between 1 μm and 4.5 μm. In addition, the internal quantum effici ...

    SBIR Phase I 2015 Department of CommerceNational Institute of Standards and Technology
  6. A FUZZY SET APPROACH FOR SEISMIC SAFETY MARGINS ASSESSMENT.

    SBC: Eda Consultants            Topic: N/A

    THE CONTRACTOR SHALL DEVELOP A FUZZY SET METHODOLOGY FOR UNCERTAINTY ANALYSIS IN PROBABILISTIC SEISMIC SAFETY ASSESSMENT OF NUCLEAR POWER PLANTS. FUZZY SET LOGIC WILL BEUSED FOR COLLECTING, QUANTIFYING AND PROPAGATING SUBJECTIVE,ENGINEERING JUDGEMENT USED IN THE UNCERTAINTY ANALYSIS. IN PHASE I, FEASIBILITY OF THE PROPOSED APPROACH WILL BE DEMONSTRATED BY APPLYING IT TO SELECTED PARTS OF A PROBABI ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
  7. SIMULATION MODEL OF AIRCRAFT EVACUATION PROCESS

    SBC: Gourary Assoc Inc            Topic: N/A

    THE FEASIBILITY OF BUILDING A PERSONAL COMPUTER MODEL OF THEEVACUATION PROCESS WILL BE STUDIED, USING AN EXPERIMENTAL MODEL DEVELOPED BY GOURARY ASSOCIATES INC. THE RESULTING MODEL WILL PERMIT THE STUDY AND VISUALIZATION OF PASSENGER MOVEMENTS DURING EVACUATION. IT WILL ALSO ALLOW THE STUDY OF THE EFFECTS OF CROWDING, FIRE, OBSTRUCTIONS, AND OTHER EFFECTS DURING THE EVACUATION PROCESS. THE MODEL W ...

    SBIR Phase I 1987 Department of Transportation
  8. PROGRAMMABLE REFLECTANCE OF ARTIFICIAL FLAWS IN RAIL MATERIALS

    SBC: REINHART & ASSOC., INC.            Topic: N/A

    A PROGRAMMABLE DEFECT SIMULATOR IS NEEDED TO TEST ULTRASONIC RAIL FLAW DETECTION SYSTEMS. CALIBRATION STANDARDS CAN BE DEVELOPED WITH VARIABLE PHYSICAL CHARACTERISTICS ACCORDING TO A PREDESCRIBED SCHEME THAT SIMULATES COMMONLY-OCCURRING FLAWS (CROSS-HEAD FATIGUE CRACKS) IN RAILWAY SYSTEM RAILS. THIS PROJECT WOULD DEVELOP A METHOD OF ALTERING THE EFFECTIVE REFLECTIVITY OF A SOLID-GAS INTERFACE THRO ...

    SBIR Phase I 1987 Department of Transportation
  9. PREDICTION OF CHECK VALVE PERFORMANCE & DEGRADATION IN NUCLEAR POWER PLANT SYSTEMS

    SBC: KALSI ENGINEERING, INC            Topic: N/A

    N/A

    SBIR Phase I 1987 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government