You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
A FUZZY SET APPROACH FOR SEISMIC SAFETY MARGINS ASSESSMENT.
SBC: Eda Consultants Topic: N/ATHE CONTRACTOR SHALL DEVELOP A FUZZY SET METHODOLOGY FOR UNCERTAINTY ANALYSIS IN PROBABILISTIC SEISMIC SAFETY ASSESSMENT OF NUCLEAR POWER PLANTS. FUZZY SET LOGIC WILL BEUSED FOR COLLECTING, QUANTIFYING AND PROPAGATING SUBJECTIVE,ENGINEERING JUDGEMENT USED IN THE UNCERTAINTY ANALYSIS. IN PHASE I, FEASIBILITY OF THE PROPOSED APPROACH WILL BE DEMONSTRATED BY APPLYING IT TO SELECTED PARTS OF A PROBABI ...
SBIR Phase I 1987 Nuclear Regulatory Commission -
Large-Area, High-Uniformity Photodiodes for Infrared Trap Detectors
SBC: AMETHYST RESEARCH INC Topic: 9020168Rmethyst Research Inc. will design, fabricate and test a high uniformity, large area, low noise infrared trap-detector detector for the 1- 4.5 μm wavelength range. This state of the art detector will have a large area (e.g., 1-1.8 cm diameter active area) with a spatial variability of internal quantum efficiency of less than 0.1 % between 1 μm and 4.5 μm. In addition, the internal quantum effici ...
SBIR Phase I 2015 Department of CommerceNational Institute of Standards and Technology -
Gap-Free Model-Based Engineering for Manufacturing and Analysis: Digital Thread without Translation
SBC: Nvariate, Inc. Topic: NoneModern Model-Based Enterprise / Engineering (MBE) systems rely on freeform surfaces built as complex combinations of geometric primitives to define engineered objects. Unfortunately, the intersection of freeform surfaces in MBE applications results in highly approximated solutions, degrading models that cost billions annually by US industry to fix. Current technology limits the abilities of users ...
SBIR Phase I 2019 Department of CommerceNational Institute of Standards and Technology -
Advanced Manufacturing and Material Measurements Software Tool Weave ™ for the Acceleration and Automation of SEM Image Analysis in the Semiconductor Industry
SBC: Sandbox Semiconductor Incorporated Topic: NoneIn this Phase I SBIR proposal, SandBox Semiconductor™ proposes to develop an Advanced Manufacturing and Material Measurements software tool called Weave ™ for accelerating and automating SEM image analysis for the semiconductor industry. During the development of a new manufacturing process line for a semiconductor device, tens of thousands of scanning electron microscopy (SEM) images are take ...
SBIR Phase I 2019 Department of CommerceNational Institute of Standards and Technology -
IMPROVEMENTS IN MOTOR OPERATED GATE VALVE DESIGN AND PREDICTIVE MODELS FOR RELIABILITY IMPROVEMENTS IN NUCLEAR POWER PLANT SAFETY SYSTEMS
SBC: KALSI ENGINEERING, INC Topic: N/AMOTOR OPERATED GATE VALVE OPERABILITY PROBLEMS AND FAILURES AT NUCLEAR POWER PLANTS ARE A MAJOR SAFETY CONCERN AS STATEDIN NRC IE BULLETIN 85-03 AND GENERIC LETTER 89-10. THIS PROPOSAL IS AIMED AT IMPROVING GATE VALVE PERFORMANCE BY (1) DEVELOPING COMPREHENSIVE PERFORMANCE PREDICTION MODELS FOR USE OVER A RANGE OF OPERATING CONDITIONS, (2) DEFINING LIMITS, BASED ON SPECIFIC DESIGNS, BEYOND WHICH E ...
SBIR Phase I 1990 Nuclear Regulatory Commission -
PREDICTION OF CHECK VALVE PERFORMANCE & DEGRADATION IN NUCLEAR POWER PLANT SYSTEMS
SBC: KALSI ENGINEERING, INC Topic: N/AN/A
SBIR Phase I 1987 Nuclear Regulatory Commission