You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Coal-Core Composites for Low Cost, Light Weight, Fire-Resistant Panels and Roofing Materials

    SBC: SEMPLASTICS EHC LLC            Topic: 18c

    Two main problems are targeted by the proposed work: (1) the underutilization of coal, a valuable natural resource, has led to a catastrophic drop in employment within the coal industry ecosystem in specific geographic areas in the country; and (2) the need within the insurance-driven roof replacement market for a suitable, light weight, low cost, high durability roofing material.These problems wi ...

    SBIR Phase II 2019 Department of Energy
  2. SCOREBOARD: The Management and Creation of In Situ Data Extractions and Computational Steering at Exascale Through HPC-FV

    SBC: JMSI, INC            Topic: 03b

    With in situ data management favoring workflows composed of multiple simulations and analyses connected in transit on heterogeneous machines, scientists and engineers need for a tool that enables them to create data extracts, visualizations, and interactively monitor and steer their simulations. JMSI is developing SCOREBOARD, an easy to use library for data extract production and simulation monito ...

    SBIR Phase II 2019 Department of Energy
  3. Developing Aggregated Datasets to Standardize the Collateral Valuation Process Utilizing an Economic Pricing Model.

    SBC: Energy Sense Finance, LLC            Topic: 06b

    Due to the difficulty in developing credible opinions of value for solar assets, there is a disconnect between traditional mortgage lending which uses established appraisal methodologies and current solar lending efforts which are limited in their ability to utilize those same tried and true appraisal methodologies. This disconnect restricts the amount of capital available for the solar market eve ...

    SBIR Phase II 2015 Department of Energy
  4. Compact Heat Exchanger for High Temperature High Pressure Applications Using Advanced Cermet

    SBC: CompRex, LLC            Topic: N/A

    In this proposal, CompRex, LLC (“CompRex”) seeks to realize a transformational and disruptive advancement in heat exchange technology for high temperature and high pressure applications through 1) the use of advanced metal and ceramic composite material, 2) development of a new simplified manufacturing approach, and 3) optimization of heat exchanger design to maximize the performance benefits ...

    SBIR Phase II 2019 Department of EnergyARPA-E
  5. Hydrothermal Liquefaction of Food Waste and Remediation of Aqueous Byproducts

    SBC: MAINSTREAM ENGINEERING CORP            Topic: 10b

    Thermochemical processing via hydrothermal liquefaction (HTL) is capable of processing a broad range of feedstocks, has a favorable net energy ratio, and produces an energy-dense liquid biooil product.However, there is an obstacle with current HTL processes that has hampered the adoption of this technology—the HTL process produces a considerable amount of aqueous organic byproducts and HTL oil r ...

    SBIR Phase II 2019 Department of Energy
  6. HYPERTUNNEL- A MR/VR Remote Collaboration System

    SBC: FACTUALVR INC            Topic: 05a

    An important challenge electric utilities will face in the foreseeable future is a workforce that is rapidly retiring and the resulting loss of institutional knowledge.This will also create a vulnerability in the electric grid, especially during widespread power outages where recovery efforts rely on a team of well-trained and experienced personnel.Disasters like Hurricane Maria in Puerto Rico hig ...

    SBIR Phase II 2019 Department of Energy
  7. Permanent Magnet (PM) Induction Heater for Paraffin Abatement

    SBC: AUSTIN GEOTECH SERVICES INC            Topic: 20b

    There are an estimated 1.7 million oil and gas wells in the United States, 771,000 of these are considered marginal producers. Combined they make up 11.3% of the US oil production and 8.3% of the US gas production. In that last 10 years, over 131,000 of these oil wells and 48,000 gas wells have been plugged and abandoned. Most of these wells suffer from paraffin plugging problems. The only way to ...

    STTR Phase II 2019 Department of Energy
  8. High Energy Safe Anodes for Lithium Ion Batteries

    SBC: CONOVATE INC            Topic: 13a

    Electric vehicle manufacturers and the Department of Energy want safe and fast charging batteries for electric and hybrid vehicles with significant improvement in specific power. Of particular interest are new low-cost materials that can accept high-power recharging during regenerative braking and are compatible with existing manufacturing infrastructure. The applicant holds an exclusive license t ...

    STTR Phase II 2019 Department of Energy
  9. Next-Generation TechNology for the Extremely Efficient Storage, Distribution, and Processing of Nuclear Physics Data

    SBC: Accelogic, LLC            Topic: 27a

    Millions of dollars are spent every year in generating the tons of data that are necessary for addressing nuclear physics grand challenge problems at DOE facilities. Due to inherent technical and financial limitations at the “last- mile” of the data delivery pipeline, only a small fraction of these expensive Peta bytes of data is available for immediate access by end-users at any given time. T ...

    SBIR Phase II 2019 Department of Energy
  10. High Resolution Diffraction Imaging of Natural Fracture Zones in Unconventional Shale Reservoirs for Well Placement Optimization

    SBC: Z-Terra Inc.            Topic: 15c

    Accounting for the geologic conditions in unconventional shales is an important factor in an optimization problem. Placing the wells too close wastes drilling money. Placing the wells too far leaves resources in the ground. Given the fact that a well in unconventional shales may cost $12-20 million, optimizing the well placement of hundreds of wells in a field becomes a very large cost savings and ...

    SBIR Phase II 2015 Department of Energy
US Flag An Official Website of the United States Government