Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until June, 2020.

  1. Fulcrum Biometrics' Plan for Research and Development of WS-BD Conformant Handheld Fingerprint Sensor

    SBC: Fulcrum Biometrics, LLC            Topic: N/A

    Trusted biometric validation of individual identities has never been more important. Several contributing factors are the increase in global terrorism, identity theft and the increase in legislation which are driving the accelerated adoption of biometric technology. Unfortunately, the biometrics industry has not actively responded to the changing market conditions being driven by the explosion in ...

    SBIR Phase I 2012 Department of CommerceNational Institute of Standards and Technology
  2. Precision 10 kV Programmable Voltage Source

    SBC: Low Thermal Electronics, Inc.            Topic: NA

    Low Thermal Electronics, Inc. proposes to design a stand-alone, programmable voltage source capable of supplying precision voltages in the range of zero to 1,000 volts direct current (DC), with options for scaling up to 10,000 volts, and with a total expanded uncertainty (k=2) of less than 10uV/V for the 10,000 volt version. This instrument will improve state-of-the-art measurements in high resist ...

    SBIR Phase I 2017 Department of CommerceNational Institute of Standards and Technology
  3. Enhanced Small Arms Ammunition

    SBC: LIBERTY AMMUNITION, INC.            Topic: SOCOM06008

    Historically, small arms ammunition has been limited in it's performance due to dated projectile designs. Recently, Liberty Ammunition has introduced a novel patented projectile design, which optimizies accuracy, range, hard and soft target perfomance in a single round. This innovation increases the capability of existing small arms and eliminates the need for users to carry more than one typ ...

    SBIR Phase II 2012 Department of DefenseSpecial Operations Command
  4. Advanced Longevity System for the Environmental Protection of Electrochromic Materials

    SBC: ECLIPSE ENERGY SYSTEMS, INC.            Topic: AF06019

    Eclipse has a variable transmittance coating to meet the requirement for a single day/night visor for aircrews. The Eclipse Electrochromic Device (EclipseECD) is well suited for light modulation applications. The EclipseECD modulates transmitted light intensity over a broad range (80% to 20% transmission) by changing optical density under an applied electric field (1.5V). This process is reversed ...

    SBIR Phase II 2012 Department of DefenseSpecial Operations Command
  5. Improved Tactical Airborne Gimbal System

    SBC: IJK CONTROLS, LLC            Topic: SOCOM15004

    The proposed Improved Tactical Airborne Gimbal System (ITAGS) provides airborne imaging capability from a lightweight 15" ball gimbal. The imaging performance achieved was previously only available with larger gimbals. IJK Controls innovative gimbal mechanism and accompanying stabilization controller are tightly integrated with best-in-class optics and detectors.

    SBIR Phase I 2015 Department of DefenseSpecial Operations Command
  6. Collapsible Stabilization Devices as Broad-Spectrum Force Multipliers

    SBC: Lynntech Inc.            Topic: SOCOM15005

    The modern operator is expected to perform an increasingly diverse set of tasks; the associated growth in basic and mission-specific loads places a burden on personnel, reducing agility and compromising combat effectiveness. SOCOM seeks a lightweight, compact stabilization solution for weapons, optics, and laser target designators. An ideal stabilization solution would permit special operators to ...

    SBIR Phase I 2015 Department of DefenseSpecial Operations Command
  7. Small Lightweight Concealable Stabilization Device

    SBC: Texas Research Institute, Austin, Inc.            Topic: SOCOM15005

    U.S. SOCOM requires small, lightweight, concealable stabilization devices for target designators, cameras, and other imagers. A fieldable solution must be rugged, fold into a very small form factor, and weigh less than one pound. Joint Tactical Air Controller (JTAC) missions have experienced reduced targeting capabilities as current tripods are often omitted from mission equipment due to excessi ...

    SBIR Phase I 2015 Department of DefenseSpecial Operations Command
  8. .50 Caliber Light Weight Precision Ammunition

    SBC: PCP TACTICAL, LLC            Topic: SOCOM13006

    The A606 round is the current round of choice for sniper operations using the M107 or MK-15 weapons platforms.The A606 round was designed as an anti-materiel munitions, is not overly accurate (estimated 2 Minute of Angle), and is heavy (every two rounds weigh approximately a pound).(For example, the M107 weighs 36 pounds and 50 rounds of ammunition weigh 25 additional pounds for a total of 61 poun ...

    SBIR Phase II 2015 Department of DefenseSpecial Operations Command
  9. Liquid cooled viscoelastic actuation for robust legged robot locomotion

    SBC: Apptronik, Inc.            Topic: H601

    Apptronik Systems in cooperation with the University of Texass Human Centered Robotics Lab (HCRL), Carnegie Mellon Universitys Robotics Institute and Italys National Research Institute (CNR), will collaborate to develop a new type of exoskeleton that is founded upon Apptroniks Visco-Elastic Liquid Cooled Actuator (VLCA). The fundamental goal of this program is the development of a powered exoskel ...

    STTR Phase II 2017 Department of DefenseSpecial Operations Command
  10. Upper Body Addendum to Proposal S2-0328

    SBC: Apptronik, Inc.            Topic: H601

    This is an Addendum to previously submitted proposal that includes the addition of a powered upper body portion of an exoskeleton. In this addendum we propose the additional requirements of researching, fabricating and integrating a powered upper body to the previously outlined lower body. These two systems together will comprise the entire exoskeleton proposed by the contractor. Through this ...

    STTR Phase II 2017 Department of DefenseSpecial Operations Command
US Flag An Official Website of the United States Government