You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
A MULTI-ANGLE TRAFFIC SIGNAL PHOTOMETER
SBC: Lighting Sciences Inc. Topic: N/AN/A
SBIR Phase I 1987 Department of Transportation -
PROGRAMMABLE REFLECTANCE OF ARTIFICIAL FLAWS IN RAIL MATERIALS
SBC: REINHART & ASSOC., INC. Topic: N/AA PROGRAMMABLE DEFECT SIMULATOR IS NEEDED TO TEST ULTRASONIC RAIL FLAW DETECTION SYSTEMS. CALIBRATION STANDARDS CAN BE DEVELOPED WITH VARIABLE PHYSICAL CHARACTERISTICS ACCORDING TO A PREDESCRIBED SCHEME THAT SIMULATES COMMONLY-OCCURRING FLAWS (CROSS-HEAD FATIGUE CRACKS) IN RAILWAY SYSTEM RAILS. THIS PROJECT WOULD DEVELOP A METHOD OF ALTERING THE EFFECTIVE REFLECTIVITY OF A SOLID-GAS INTERFACE THRO ...
SBIR Phase I 1987 Department of Transportation -
Real Time Signal State Transition Software for ATC- NTCIP Interface
SBC: Advanced Technologies, Inc Topic: 06FH1Phase II Project Scope: ATI has developed an open source Signal Control Programming Environment (SCOPE) that ➢ Implements Actuated Control with Min Recall Mode, Max Recall Mode, Gap Out Mode, Max Out Mode, Presence Mode, Lane-by-Lane Control. ➢ Contains a Pretimed Mode allowing control of 3-leg, 4-leg, and Texas Diamond Intersections ➢ Can be easily ported to any operating system. ➢ Can ha ...
SBIR Phase II 2012 Department of Transportation -
A Quantitative Non-destructive Residual Stress Assessment Tool for Pipelines
SBC: Generation 2 Materials Technology Llc Topic: 111PH2There exists a wide-range need in both industry and government for quantitative residual stress measurements. Generation 2 Materials Technology LLC (G2MT) will collaborate with partners from industry and government to calibrate and commercialize the eStress system to assess residual stress from mechanical damage and re-rounding. The industrial members, consortiums, and government laboratories who ...
SBIR Phase II 2012 Department of Transportation -
Fulcrum Biometrics' Plan for Research and Development of WS-BD Conformant Handheld Fingerprint Sensor
SBC: Fulcrum Biometrics, LLC Topic: N/ATrusted biometric validation of individual identities has never been more important. Several contributing factors are the increase in global terrorism, identity theft and the increase in legislation which are driving the accelerated adoption of biometric technology. Unfortunately, the biometrics industry has not actively responded to the changing market conditions being driven by the explosion in ...
SBIR Phase I 2012 Department of CommerceNational Institute of Standards and Technology -
Decentralized, Public, and Mobile-Based Sidewalk Inventory Tool
SBC: KNOWLEDGE BASED SYSTEMS INC Topic: 142FH1Knowledge Based Systems, Inc. (KBSI) is pleased to propose the design and development of “MySidewalk,” a mobile application that will facilitate the crowd-sourced collection of sidewalk inventory and condition assessment data. The proposed tool will utilize the recent advances in social networks, mobile data collection, and data mining to provide integrated sidewalk datasets. The proposed tool ...
SBIR Phase I 2015 Department of Transportation -
Management System Display to Track Emergency Response Vehicles and Mutual Aid During a Crash Response
SBC: LYNNTECH INC. Topic: 142FA2We present the National Incident Visualization System, NIVS. NIVS is a combination of software elements that leverage the capabilities and prevalence of smart-phone technology to create a single point of reference for aggregated information and information sharing during a fire-based emergency at an airport. NIVS aggregates GPS location and status information from personnel and resources with Airp ...
SBIR Phase I 2015 Department of Transportation -
Long Range ROW Detection and Warning System
SBC: R-DEX SYSTEMS, INC. Topic: 151FR7R-DEX Systems proposes to develop the TrackMap System, an innovative and groundbreaking long-range detection and warning system (DWS) for the detection of unlawful targets on the railroad right of way (ROW). TrackMap will leverage low-cost radar sensors, proven software, and high-performance embedded processing to enable the Federal Railroad Administration (FRA) and its safety partners to signific ...
SBIR Phase I 2015 Department of Transportation -
Large-Area, High-Uniformity Photodiodes for Infrared Trap Detectors
SBC: AMETHYST RESEARCH INC Topic: 9020168Rmethyst Research Inc. will design, fabricate and test a high uniformity, large area, low noise infrared trap-detector detector for the 1- 4.5 μm wavelength range. This state of the art detector will have a large area (e.g., 1-1.8 cm diameter active area) with a spatial variability of internal quantum efficiency of less than 0.1 % between 1 μm and 4.5 μm. In addition, the internal quantum effici ...
SBIR Phase I 2015 Department of CommerceNational Institute of Standards and Technology -
Development of Innovative Welding for High Performance Bridge Steel
SBC: KAI, LLC Topic: 132FH1With this research, we would like to provide new materials joining methods to the DOT. This will be achieved with a pulse energy store that has already demonstrated game changing capability in welding a wide variety of metals and alloys. The process we are proposing is known as Homopolar Welding. The weld is created by a solid state fusion welding process whereby high current is passed through ...
SBIR Phase II 2015 Department of Transportation