You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A REAL-TIME 3-D CLOUD SIMULATION SYSTEM DEVELOPMENT

    SBC: Aeromet, Inc.            Topic: N/A

    THIS PROPOSAL DESCRIBES A FEASIBILITY STUDY FOR IMPLEMENTING A REALTIME, THREE-DIMENSIONAL CLOUD MODEL TO SUPPORT REENTRY VEHICLE TEST OPERATIONS. AN EXISTING RESEARCH CLOUD MODEL WOULD BE INTERFACED TO A MESOSCALE ATMOSPHERIC MODEL. THE COMBINED MODELING SYSTEM WOULD BE ADAPTED FOR USE AT THE KWAJALEIN MISSILE RANGE (KMR). FORECASTS OF DETAILED CLOUD FEATURES SUCH AS WATER CONTENT, RADAR REFLECTI ...

    SBIR Phase II 1987 Department of DefenseAir Force
  2. MESOSCALE ENVIRONMENTAL NOWCASTING FOR TACTICAL ARMY OPERATIONS

    SBC: Aeromet, Inc.            Topic: N/A

    A PLAN FOR THE DEVELOPMENT OF A MESOSCALE WEATHER NOWCASTING SYSTEM IS PROPOSED. THAT SYSTEM WOULD BE USED AS A TACTICAL DECISION AID FOR SUPPORT OF TACTICAL ARMY OPERATIONS. THE SYSTEM WOULD BE COMPOSED OF MODULAR SENSOR PACKAGES, A TELEMETRY SYSTEM, A FLEXIBLE SYSTEM OF SENSOR DEPLOYMENT, AND A MICROPROCESSOR BASED TACTICAL COMPUTER SYSTEM FOR THE ANALYSIS AND DISPLAY OF DATA COLLECTED. THE PROP ...

    SBIR Phase I 1987 Department of DefenseArmy
  3. HIGH-TEMPERATURE TURBINE--ADVANCED DEVELOPMENT

    SBC: Air Turbine Technology Inc.            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseNavy
  4. NOISE SUPPRESSOR DEVELOPMENT- QUITE VALVES FOR AIR PRESSURE REDUCTION MANIFOLDS

    SBC: American Energy Valve Co            Topic: N/A

    THIS PROPOSAL WILL DEMONSTRATE (IN 2" TO 4" SIZE), A NOISE REUCING TRIM THAT CAN BE UTILIZED IN ROTARY CONTROL/ON-OFF BALL VALVES. THIS VALVE TRIM ADDRESSES NOISE AT THE SOURCE. THE BASIC DESIGN HAS A VARIABLE IMPEDENCE TRIM TO CAUSE A HIGH IMPEDENCE AT LOW ANGLES OF OPENING AND LOW IMPEDENCE (VERY LITTLE FLOW RESTRICTION) AT LARGE OPENING ANGLES. IT IS AN IDEAL VALVE FOR PRESSURIZATION/DE-PRESSUR ...

    SBIR Phase I 1987 Department of DefenseNavy
  5. NOISE SUPPRESSOR DEVELOPMENT-QUIET VALVES FOR AIR PRESSURE REDUCTION MANIFOLDS

    SBC: Annapolis Research & Dev            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseNavy
  6. CREATION OF AS-BUILT DRAWINGS IN CAD SYSTEMS

    SBC: Antech Inc.            Topic: N/A

    A STUDY WILL BE MADE OF THE FEASIBILITY OF MAKING FIELD MEASUREMENTS OF EXISTING BUILDINGS AND AUTOMATICALLY CREATING AS-BUILT DRAWINGS IN A CAD SYSTEM. VARIOUS TYPES OF SCANNING DEVICES SUCH AS LASERS, SONARS, MECHANICAL, PHOTOGRAMMETRY, ETC. WILL BE STUDIED AND EVALUATIONS MADE REGARDING ACCURACY AND CONVENIENCE VERSUS COST. DATA PROTOCOL COMPATIBILITY BETWEEN THE MEASURING DEVICE AND THE DATA R ...

    SBIR Phase I 1987 Department of DefenseArmy
  7. CREATION OF AS-BUILT DRAWINGS IN CAD SYSTEMS

    SBC: Antech Inc.            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseArmy
  8. TIME RESOLVED TARGET AND PLUME OPTICAL PROPERTIES MEASUREMENTS DURING RP LASER INTERACTIONS

    SBC: Antropix Corpon            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseAir Force
  9. ON-BOARD AIRCRAFT EMBEDDED TRAINING CAPABILITY

    SBC: Applications Resources Inc            Topic: N/A

    THIS RESEARCH WILL INVESTIGATE PERFORMANCE MEAUREMENT TECHNIQUES AND COMPUTER SIMULATION TECHNIQUES REQUIRED FOR AN ON-BOARD AIRCRAFT "EMBEDDED TRAINING" CAPABILITY APPLICABLE TO BOTH TRAINING AND MUNITION CONCEPT EVALUATION. DATA REQUIREMENTS FOR ON-BOARD SIMULATION OF THE MUNITIONS TO ACCOMPLISH SIMULATED LAUNCH, FLYOUT AND TERMINAL ENGAGEMENT WILL BE DETERMINED. AVAILABILITY OF REAL-WORLD INPUT ...

    SBIR Phase II 1987 Department of DefenseAir Force
  10. VERY LOW FREQUENCY HIGH POWER SONAR PROJECTOR

    SBC: Argotec Inc            Topic: N/A

    THE SEEMINGLY IMPOSSIBLE TASK OF PRODUCING ONE-HALF OF A MEGAWATT OF ACOUSTIC POWER UNDERWATER AT A FREQUENCY OF 5 HZ IS ADDRESSED. THE EXPLOITATION OF THE RECENT INTRODUCTION OF NEW RARE EARTH PERMANENT MAGNET MATERIALS, THE CONCEPT OF USING A FLEXURAL DISC RADIATOR, AND THE RECENT CULMINATION OF TWO YEARS OF ELECTRODYNAMIC TRANSDUCER DEVELOPMENT IS PROPOSED. THE USE OF MATHEMATICAL MODELING, EXP ...

    SBIR Phase I 1987 Department of DefenseNavy
US Flag An Official Website of the United States Government