You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
A REAL-TIME 3-D CLOUD SIMULATION SYSTEM DEVELOPMENT
SBC: Aeromet, Inc. Topic: N/ATHIS PROPOSAL DESCRIBES A FEASIBILITY STUDY FOR IMPLEMENTING A REALTIME, THREE-DIMENSIONAL CLOUD MODEL TO SUPPORT REENTRY VEHICLE TEST OPERATIONS. AN EXISTING RESEARCH CLOUD MODEL WOULD BE INTERFACED TO A MESOSCALE ATMOSPHERIC MODEL. THE COMBINED MODELING SYSTEM WOULD BE ADAPTED FOR USE AT THE KWAJALEIN MISSILE RANGE (KMR). FORECASTS OF DETAILED CLOUD FEATURES SUCH AS WATER CONTENT, RADAR REFLECTI ...
SBIR Phase II 1987 Department of DefenseAir Force -
TIME RESOLVED TARGET AND PLUME OPTICAL PROPERTIES MEASUREMENTS DURING RP LASER INTERACTIONS
SBC: Antropix Corpon Topic: N/AN/A
SBIR Phase I 1987 Department of DefenseAir Force -
ON-BOARD AIRCRAFT EMBEDDED TRAINING CAPABILITY
SBC: Applications Resources Inc Topic: N/ATHIS RESEARCH WILL INVESTIGATE PERFORMANCE MEAUREMENT TECHNIQUES AND COMPUTER SIMULATION TECHNIQUES REQUIRED FOR AN ON-BOARD AIRCRAFT "EMBEDDED TRAINING" CAPABILITY APPLICABLE TO BOTH TRAINING AND MUNITION CONCEPT EVALUATION. DATA REQUIREMENTS FOR ON-BOARD SIMULATION OF THE MUNITIONS TO ACCOMPLISH SIMULATED LAUNCH, FLYOUT AND TERMINAL ENGAGEMENT WILL BE DETERMINED. AVAILABILITY OF REAL-WORLD INPUT ...
SBIR Phase II 1987 Department of DefenseAir Force -
GRAVITY EFFECTS ON SMALL-SCALE STRUCTURAL MODELING
SBC: Applied Research Associates, Inc. Topic: N/ATHE PROPOSED EFFORT IS TO DEVELOP MATERIALS AND PROCEDURES TO APPLY REECH-FROUDE SCALING TO SUB-SCALE MODEL TESTS OF REINFORCED CONCRETE STRUCTURES SUBJECTED TO CONVENTIONAL (NON-NUCLEAR) WEAPON EFFECTS.
SBIR Phase I 1987 Department of DefenseAir Force -
PHASED ARRAY IMAGING IN PARTIALLY COHERENT LIGHT
SBC: A-TECH CORPORATION Topic: N/ATHE COMBINED REQUIREMENTS FOR HIGH SPATIAL RESOLUTION AND HIGH SIGNAL-TO-NOISE RATIO HAVE LED MANY RECENT TRACKING SYSTEMS ANALYSTS TO CONSIDERACTIVE TRACKERS IMPLEMENTED WITH PHASED ARRAY OPTICS. THE PHASED ARRAY OVERCOMES THE TECHNOLOGY LIMITS ON APERTURE SIZE WHILE THE LASER SOURCES PROVIDE A DETECTABLE TARGET RETURN. THE PHASED ARRAY IMAGER HAS BEEN MODELLED FOR BOTH NON-COHERENT AND FULLY COH ...
SBIR Phase II 1987 Department of DefenseAir Force -
CONTROLLED COOLDOWN OF AIRCRAFT TURBINE ENGINES
SBC: Cef Industries Inc Topic: N/AAN "INTELLIGENT" MECHANISM TO CONTROL AIRCRAFT TURBINE ENGINE COOLDOWN UTILIZING INTEGRAL SENSORS, LOGIC, DRIVE AND FAIL-SAFE, FOR EXTENDING THE PERFORMANCE LIFE OF AIRCRAFT GAS TURBINE ENGINES IS PROPOSED. AIRCRAFT TURBINE ENGINES ARE PRECISELY MADE AND CONTROLLED MECHAISMS UNTIL SHUTDOWN. THEN, HEAT SOAK AND SOAKBACK PHENOMEN DELETERIOUSLY AFFECT ENGINE PERFORMANCE, LIFE, MAINTENANCE COSTS AND L ...
SBIR Phase I 1987 Department of DefenseAir Force -
EGRESS BORING MACHINE CUTTER DEVELOPMENT
SBC: Cobbs Engineering Inc Topic: N/ATHE PROGRAM GOALS FOR THE EGRESS BORING MACHINE REQUIRE A ROCK BORING SYSTEM WHICH WILL PRODUCE PENETRATION RATES OVER TEN TIMES GREATER THAN THOSE PRODUCED TO DATE UNDER SIMILAR CONDITIONS. THIS PROPOSAL IS TO DEVELOP A CUTTER SYSTEM WHICH USES THE CONCEPT OF AN INTERRUPTED DISC CUTTER. IT WILL TAKE FULL ADVANTAGE OF INDEXING BETWEEN CRATERS TO MAXIMIZE ROCK REMOVAL WHILE MINIMIZING THRUST REQUIR ...
SBIR Phase I 1987 Department of DefenseAir Force -
ADAPTIVE GRID TECHNIQUES FOR USE IN COMPUTATIONAL FLUID DYNAMICS
SBC: Computational Mechan Topic: N/ATHIS PROJECT FOCUSES ON THE TWO MOST IMPORTANT ISSUES OF ALL OF COMPUTATIONAL FLUID DYNAMICS: 1) HOW GOOD ARE THE NUMERICAL ANSWERS OBTAINED IN A COMPUTATION? AND 2) HOW CAN THE BEST POSSIBLE ANSWERS BE OBTAINED FOR A FIXED AND LIMITED COMPUTATIONAL EFFORT, BUDGET, OR COMPUTING CAPABILITY? IN GENERAL TERMS THE ANSWERS TO THESE QUESTIONS ARE 1) TO DETERMINE RELIABLE A-POSTERIORI ESTIMATES OF ERROR ...
SBIR Phase II 1987 Department of DefenseAir Force -
ADAPTIVE NULLING BY ELECTRICAL SURFACE CONTROL OF A REFLECTOR ANTENNA
SBC: COMPUTER SCIENCE INNOVATIONS, INC. Topic: N/AAN INNOVATIVE APPROACH TO FORMING A NULL IN THE SECONDARY PATTERN OF A REFLECTOR ANTENNA IS DEVELOPED BY THIS PROJECT. AN ELECTRONICALLY CONTROLLABLE REFLECTIVE SURFACE BEING DEVELOPED ON A NASA SBIR IS THE STARTING POINT FOR THE WORK. THIS PROJECT EXTENDS THE PERFORMANCE OF THE SURFACE SO THAT IT IS USEFUL AS A NULL FORMER. THE RESULT IS CONSIDERABLY REDUCED COST OF NULL STEERING ANTENNAS. THE DE ...
SBIR Phase II 1987 Department of DefenseAir Force -
HIGH POWER MICROWAVE (HPM) INTEGRATED CIRCUIT SCREENING CRITERIA
SBC: Design Engineering Inc Topic: N/AN/A
SBIR Phase I 1987 Department of DefenseAir Force