You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Improved Tactical Airborne Gimbal System
SBC: IJK CONTROLS, LLC Topic: SOCOM15004The proposed Improved Tactical Airborne Gimbal System (ITAGS) provides airborne imaging capability from a lightweight 15" ball gimbal. The imaging performance achieved was previously only available with larger gimbals. IJK Controls innovative gimbal mechanism and accompanying stabilization controller are tightly integrated with best-in-class optics and detectors.
SBIR Phase I 2015 Department of DefenseSpecial Operations Command -
Collapsible Stabilization Devices as Broad-Spectrum Force Multipliers
SBC: LYNNTECH INC. Topic: SOCOM15005The modern operator is expected to perform an increasingly diverse set of tasks; the associated growth in basic and mission-specific loads places a burden on personnel, reducing agility and compromising combat effectiveness. SOCOM seeks a lightweight, compact stabilization solution for weapons, optics, and laser target designators. An ideal stabilization solution would permit special operators to ...
SBIR Phase I 2015 Department of DefenseSpecial Operations Command -
Small Lightweight Concealable Stabilization Device
SBC: TEXAS RESEARCH INSTITUTE , AUSTIN, INC. Topic: SOCOM15005U.S. SOCOM requires small, lightweight, concealable stabilization devices for target designators, cameras, and other imagers. A fieldable solution must be rugged, fold into a very small form factor, and weigh less than one pound. Joint Tactical Air Controller (JTAC) missions have experienced reduced targeting capabilities as current tripods are often omitted from mission equipment due to excessi ...
SBIR Phase I 2015 Department of DefenseSpecial Operations Command -
Large-Area, High-Uniformity Photodiodes for Infrared Trap Detectors
SBC: AMETHYST RESEARCH INC Topic: 9020168Rmethyst Research Inc. will design, fabricate and test a high uniformity, large area, low noise infrared trap-detector detector for the 1- 4.5 μm wavelength range. This state of the art detector will have a large area (e.g., 1-1.8 cm diameter active area) with a spatial variability of internal quantum efficiency of less than 0.1 % between 1 μm and 4.5 μm. In addition, the internal quantum effici ...
SBIR Phase I 2015 Department of CommerceNational Institute of Standards and Technology -
Cognitive Residential Heat Pumps Fault Detection and Diagnostic Datalogger
SBC: MANAGEMENT SCIENCES INC Topic: 9010173RDuring Phase I, Management Sciences, Inc. (MSI) proved feasibility of adapting their current technology into a product capable of improving performance resulting in increased efficiency and extended life cycles of heat pumps. The resultant product is a tool named the Heat Pump Sentient (HP-Sentient). The HP-Sentient will improve performance and reduce maintenance costs through aggressive goal-seek ...
SBIR Phase II 2015 Department of CommerceNational Institute of Standards and Technology -
.50 Caliber Light Weight Precision Ammunition
SBC: PCP TACTICAL, LLC Topic: SOCOM13006The A606 round is the current round of choice for sniper operations using the M107 or MK-15 weapons platforms.The A606 round was designed as an anti-materiel munitions, is not overly accurate (estimated 2 Minute of Angle), and is heavy (every two rounds weigh approximately a pound).(For example, the M107 weighs 36 pounds and 50 rounds of ammunition weigh 25 additional pounds for a total of 61 poun ...
SBIR Phase II 2015 Department of DefenseSpecial Operations Command -
Precision 10 kV Programmable Voltage Source
SBC: Low Thermal Electronics, Inc. Topic: NALow Thermal Electronics, Inc. proposes to design a stand-alone, programmable voltage source capable of supplying precision voltages in the range of zero to 1,000 volts direct current (DC), with options for scaling up to 10,000 volts, and with a total expanded uncertainty (k=2) of less than 10uV/V for the 10,000 volt version. This instrument will improve state-of-the-art measurements in high resist ...
SBIR Phase I 2017 Department of CommerceNational Institute of Standards and Technology -
Fiber Pigtailed On-Chip Mid-infrared Difference Frequency Generation in Silicon
SBC: OMEGA OPTICS, INC. Topic: NAWe propose a fiber-pigtailed strained silicon platform for tunable difference frequency generation (DFG) in mid-infrared (MIR) with tunable continuous wave near-infrared (NIR) sources. Stress exerted by silicon nitride induces second-order nonlinear susceptibility c(2) on underlying centro-symmetric silicon. NIR light is coupled into silicon and MIR light is coupled out of silicon using sub-wavele ...
SBIR Phase II 2017 Department of CommerceNational Institute of Standards and Technology -
Liquid cooled viscoelastic actuation for robust legged robot locomotion
SBC: APPTRONIK INC Topic: H601Apptronik Systems in cooperation with the University of Texass Human Centered Robotics Lab (HCRL), Carnegie Mellon Universitys Robotics Institute and Italys National Research Institute (CNR), will collaborate to develop a new type of exoskeleton that is founded upon Apptroniks Visco-Elastic Liquid Cooled Actuator (VLCA). The fundamental goal of this program is the development of a powered exoskel ...
STTR Phase II 2017 Department of DefenseSpecial Operations Command -
Upper Body Addendum to Proposal S2-0328
SBC: APPTRONIK INC Topic: H601This is an Addendum to previously submitted proposal that includes the addition of a powered upper body portion of an exoskeleton. In this addendum we propose the additional requirements of researching, fabricating and integrating a powered upper body to the previously outlined lower body. These two systems together will comprise the entire exoskeleton proposed by the contractor. Through this ...
STTR Phase II 2017 Department of DefenseSpecial Operations Command