You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Advanced Manufacturing and Material Measurements Software Tool Weave ™ for the Acceleration and Automation of SEM Image Analysis in the Semiconductor Industry

    SBC: Sandbox Semiconductor Incorporated            Topic: None

    In this Phase I SBIR proposal, SandBox Semiconductor™ proposes to develop an Advanced Manufacturing and Material Measurements software tool called Weave ™ for accelerating and automating SEM image analysis for the semiconductor industry. During the development of a new manufacturing process line for a semiconductor device, tens of thousands of scanning electron microscopy (SEM) images are take ...

    SBIR Phase I 2019 Department of CommerceNational Institute of Standards and Technology
  2. Advanced Simulated Patient Intelligent Response Engine (ASPIRE)

    SBC: VCOM3D INC            Topic: DHA191002

    The goal of medical simulation-based training such as high-fidelity manikin simulators, part task trainers, and screen-based virtual patients, is to approximate real-life treatment experiences without risk to live patients. While the use of sensors has ma

    SBIR Phase I 2019 Department of DefenseDefense Health Agency
  3. Bottom Feeder- A Highly Maneuverable Autonomous Underwater Vehicle

    SBC: Tridentis Advanced Marine Vehicles LLC            Topic: 822

    The Bottom Feeder project is designed to prove out the research done in Phase I using a prototype platform. The prototype will be a full size version of the platform designed during Phase I. The Phase I platform was designed to work in two operational configurations, a highly efficient mode and a highly maneuverable mode, with the ability to switch between them while submerged. The platform is equ ...

    SBIR Phase II 2019 Department of CommerceNational Oceanic and Atmospheric Administration
  4. Clinical Evaluation of Biocompatible Dressings for the Delivery of Analgesics

    SBC: Keratin Biosciences Inc.            Topic: A14048

    The Phase I and Phase II projects that are the basis for this Phase II enhancement proposal tested the feasibility of releasing opiate compounds from a topical wound dressing for burn pain relief and treatment. This project culminated with a regulatory s

    SBIR Phase II 2019 Department of DefenseDefense Health Agency
  5. Complex Crystalloid Resuscitative Fluid

    SBC: GanD, Inc.            Topic: DHA172009

    Problem: Currently available resuscitation fluids have been shown to induce detrimental effects on trauma outcomes. Objective: The objective of this proposal is to use the data from the successful Phase 1 studies to guide the continued development and te

    SBIR Phase II 2019 Department of DefenseDefense Health Agency
  6. Electrochemical Drug Infusion Pump

    SBC: LYNNTECH INC.            Topic: OSD05H01

    The CONOPS for the Expeditionary Medical Support System (EMEDS) is based on practical effectiveness, speed, and efficiency. Key among the tools required by the Air Mobility Command and the Air Combat Command, which are two of the major commands that are part of the United Air Force is a multi-channel intravenous infusion pump capable of delivering fluids that meets the safe-to-fly criteria for all ...

    SBIR Phase II 2019 Department of DefenseDefense Health Agency
  7. Extended Wear Deep-Fitting Noise Dosimeter

    SBC: Nittany Acoustics, LLC            Topic: DHA182002

    22 million workers go to work each day in damaging noise. Noise-induced hearing loss remains a problem in US industry and in the US military despite our best preventative efforts. A significant roadblock in preventing hearing loss is the lack of an accu

    SBIR Phase I 2019 Department of DefenseDefense Health Agency
  8. Gap-Free Model-Based Engineering for Manufacturing and Analysis: Digital Thread without Translation

    SBC: Nvariate, Inc.            Topic: None

    Modern Model-Based Enterprise / Engineering (MBE) systems rely on freeform surfaces built as complex combinations of geometric primitives to define engineered objects. Unfortunately, the intersection of freeform surfaces in MBE applications results in highly approximated solutions, degrading models that cost billions annually by US industry to fix. Current technology limits the abilities of users ...

    SBIR Phase I 2019 Department of CommerceNational Institute of Standards and Technology
  9. Intelligent Patient Simulation Platform

    SBC: SHARP VISION SOFTWARE LLC            Topic: DHA191002

    A proof-of-concept research on Intelligent Patient Platform is proposed with the goal to improve healthcare training experience by adding natural language capability to patient simulators by leveraging the latest artificial intelligent technologies so tha

    SBIR Phase I 2019 Department of DefenseDefense Health Agency
  10. Limb Cooling Device to Preserve Ischemic Extremity for Prolonged Field Care

    SBC: ADVANCED COOLING TECHNOLOGIES INC            Topic: DHA182003

    To extend the usage of tourniquets during a war, Advanced Cooling Technologies, Inc. (ACT) proposes to develop an innovative limb cooling device charged with two-phase working fluid, which is able to rapidly cool down the limb and keep the limb temperatur

    SBIR Phase I 2019 Department of DefenseDefense Health Agency
US Flag An Official Website of the United States Government