You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Electrochemical Drug Infusion Pump

    SBC: LYNNTECH INC.            Topic: OSD05H01

    The CONOPS for the Expeditionary Medical Support System (EMEDS) is based on practical effectiveness, speed, and efficiency. Key among the tools required by the Air Mobility Command and the Air Combat Command, which are two of the major commands that are part of the United Air Force is a multi-channel intravenous infusion pump capable of delivering fluids that meets the safe-to-fly criteria for all ...

    SBIR Phase II 2019 Department of DefenseDefense Health Agency
  2. Clinical Evaluation of Biocompatible Dressings for the Delivery of Analgesics

    SBC: Keratin Biosciences Inc.            Topic: A14048

    The Phase I and Phase II projects that are the basis for this Phase II enhancement proposal tested the feasibility of releasing opiate compounds from a topical wound dressing for burn pain relief and treatment. This project culminated with a regulatory s

    SBIR Phase II 2019 Department of DefenseDefense Health Agency
  3. Low-Cost, Plug-and-Play Data Diodes for Solar Equipment Cybersecurity

    SBC: Fend Incorporated            Topic: 12b

    Reimagining a trusted technology (data diodes) into a low-cost plug and play appliance, to provide greater situational awareness and predictive analytics, while safeguarding the infrastructure.That is the Fend mission, and SBIR Phase I helped to demonstrate the need and feasibility for this solution.Solar energy operators need real-time situational awareness and the insight of advanced analytics t ...

    SBIR Phase II 2019 Department of Energy
  4. Permanent Magnet (PM) Induction Heater for Paraffin Abatement

    SBC: AUSTIN GEOTECH SERVICES INC            Topic: 20b

    There are an estimated 1.7 million oil and gas wells in the United States, 771,000 of these are considered marginal producers. Combined they make up 11.3% of the US oil production and 8.3% of the US gas production. In that last 10 years, over 131,000 of these oil wells and 48,000 gas wells have been plugged and abandoned. Most of these wells suffer from paraffin plugging problems. The only way to ...

    STTR Phase II 2019 Department of Energy
  5. An Energy Internet Platform for Transactive Energy and Demand Response Applications

    SBC: BEMCONTROLS, LLC            Topic: 12c

    For over a century, the structure of the electric utility business has been a supplier driven model with consumers receiving and paying for electricity without any participation in how the electricity is produced, transmitted, or consumed.However, advances in renewable energy technologies (e.g., PV panels), battery storage, smart devices, as well as financing models have given rise to prosumers - ...

    SBIR Phase II 2019 Department of Energy
  6. Detection of Micron-Scale Flaws through Nonlinear Wave Mixing

    SBC: LUNA INNOVATIONS INCORPORATED            Topic: 10c

    Storage of hydrogen is challenging due to high storage pressures and potential for hydrogen embrittlement.Pressure vessels are currently retired from service under conservative guidelines due to the inability to identify damage until damage is imminent.There exists a need for a system that can resolve micrometer-scale features and relate these to the damage state of pressure vessels for accurate l ...

    SBIR Phase II 2019 Department of Energy
  7. A Multi-channel Radiation-tolerant, Low-power, High-speed, and Resolution Analog-to-Digital Converter for Nuclear Physics Detectors

    SBC: APOGEE SEMICONDUCTOR, INC.            Topic: 28b

    Cost-effective and power-efficient radiation tolerant semiconductors are needed in various harsh environments, such as particle detectors, communication satellites, high-altitude avionics and medical imagining equipment. These include amplifiers, voltage regulators, analog-to-digital converters (ADCs) and digital logic circuitry. However, radiation-tolerant high-speed ADCs currently cost more than ...

    STTR Phase II 2019 Department of Energy
  8. PoreStudio: First Cloud-Based Multiscale Reactive Flow Simulator

    SBC: AQUANRG CONSULTING INC.            Topic: 06a

    Reactive transport models (RTMs) are quantitative tools to analyze the interaction between physical, chemical, and biological processes in various material and energy systems. Oil and gas, mining, nuclear waste management, and environmental consulting companies use RTMs to acquire critical information which are essential to: estimate the oil and gas production rates under different hydraulic fract ...

    SBIR Phase II 2019 Department of Energy
  9. CAD-Integrated Web-Based Building Performance Simulation Platform

    SBC: LADYBUG TOOLS LLC            Topic: 09c

    Today’s building energy modeling practice is highly fractured between different simulation engines, Computer Aided Design (CAD) interfaces, and computing resources.While preferences for these fractured components vary between professions and individuals, one principle is unanimously agreed upon: a strong, flexible, and programmable connection between these three categories of software is needed ...

    SBIR Phase II 2019 Department of Energy
  10. High Performance Substrate Embedded Microgrids for High Efficiency, Flexible Organic Light Emitting Diodes

    SBC: ELECTRONINKS INCORPORATED            Topic: 09b

    Indium tin oxide (ITO) films are currently the most widely used transparent conductor in optoelectronic applications. However, ITO suffers from several major technological and economic limitations for large area applications such as inadequate performance, high cost, and brittleness. The primary objective of this Small Business Technology Transfer (STTR) Phase I/Phase II project is to develop the ...

    STTR Phase II 2019 Department of Energy
US Flag An Official Website of the United States Government