You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
A COMPACT ACCELERATOR-BASED NEUTRON SOURCE FOR BAGGAGE INTERROGATION
SBC: Accsys Technology, Inc. Topic: N/AN/A
SBIR Phase I 1987 Department of Transportation -
AGING PROCESSES IN NUCLEAR REACTORS
SBC: Pdi Technology Inc Topic: N/AAS NUCLEAR PLANTS GROW OLDER, ENVIRONMENTAL CONDITIONS MAY AFFECT THE PERFORMANCE OF PLANT CONCRETE AND STEEL STRUCTURES. WE PROPOSE TO DEVELOP A STRATEGY WHICH CAN BE APPLIED TO CONCRETE STRUCTURES. IT WILL BE DIRECTED TOWARDSTHE DEVELOPMENT OF METHODS TO ANALYZE AND UNDERSTAND AGING EFFECTS, INCLUDING THE COMBINED EFFECTS OF TIME, TEMPERATURE, RADIATION, HUMIDITY, STRESS, CHEMICAL ENVIRONMENT AN ...
SBIR Phase I 1987 Nuclear Regulatory Commission -
A LOW-COST OPTICAL WEATHER IDENTIFIER FOR AN AUTOMATED WEATHER OBSERVING SYSTEM
SBC: DYNAMICS TECHNOLOGY, INC. Topic: N/ATHE IDENTIFICATION OF THE TYPE OF PRECIPITATION (RAIN, SNOW, FOG/HAZE, HAIL) HAS TRACTIONALLY RELIED ON HUMAN JUDGMENT. RECENTLY, THE WAVE PROPAGATION LABORATORY OF DEVELOPED A TECHNOLOGY FOR AUTOMATIC WEATHER IDENTIFICATION USING LASER SCINTILLATION AND SCATTERING. THE TECHNIQUE HAS BEEN SUCCESSFULLY TESTED IN FIELD OPERATION. HOWEVER, THE SYSTEM IS TOO CLUMSY AND EXPENSIVE FOR LARGE-SCALE FIELD ...
SBIR Phase II 1985 Department of Transportation -
AN AUTOMATED INJURY CODING PROGRAM
SBC: Advanced Decision Systems Topic: N/AN/A
SBIR Phase I 1987 Department of Transportation -
AUTOMATIC CREATION AND RENODALIZATION OF TRAC-BWR INPUT DECKS
SBC: Expert-ease Systems Topic: N/ATHE OBJECTIVE OF THE PROPOSED RESEARCH IS TO BUILD A USER-FRIENDLY, PERSONAL COMPUTER BASED WORKSTATION FOR PERFORMING TRAC-BWR ANALYSIS. THE SOFTWARE WILL ALLOW A USER TO READ-IN DATA FROM EXISTING TRAC-BWR INPUT DECKS (ASCII), DRAW NODALIZATION DIAGRAM, MODIFY INPUT, AUTOMATICALLY RENODALIZE THE VESSEL, CHAN AND PIPE COMPONENTS, GENERATE INPUT DECK, SUBMIT JOB, BRING BACK PLOTDATA, DISPLAY RESUL ...
SBIR Phase I 1987 Nuclear Regulatory Commission -
COMPUTER VOICE AND SPEECH DATA ENTRY AND RECOGNITION
SBC: Speech Systems Inc Topic: N/AN/A
SBIR Phase I 1987 Department of Transportation -
CONDITIONS
SBC: INNOVATIVE SCIENCE & TECHNOLOGY Topic: N/AOVER THE LAST 5 YEARS, A NUMBER OF ULTRASONIC APPROACHES TO RESIDUAL AND APPLIED STRESS MEASUREMENTS USING EMATS HAVE BEEN REPORTED. NONE OF THESE HAS BEEN EVALUATED ON STEEL BUT THERE ARE NO FUNDAMENTAL REASONS WHY MOST CANNOT BE APPLIED TO STEEL. WHEN THE MEASUREMENT CONSTRAINTS IMPOSED BY MAKING MEASUREMENTS WITH A DEVICE ATTACHED TO A RAILCAR TESTING VEHICLE ARE CONSIDERED, TWO EMAT ULTRASONIC ...
SBIR Phase I 1985 Department of Transportation -
FACILITATE DEVELOPMENT AND EVALUATION OF FAULT TREES
SBC: Expert-ease Systems Topic: N/AWORKSTATION AND EXPERT SYSTEM TECHNOLOGIES HAVE A POTENTIAL OF SUBSTANTIALLY FACILITATING THE DEVELOPMENT AND EVALUATIONOF FAULT TREES. INTRODUCING A WORKSTATION PHILOSOPHY WITH AN INTERACTIVE SET OF INTEGRATED SOFTWARE TOOLS ON A LOCAL COMPUTER WILL PROMOTE IMPROVED CONTINUITY IN THE THOUGHT PROCESS DURING A FAULT TREE DEVELOPMENT. THE EXPERT SYSTEM TECHNOLOGY WILL SIMPLIFY THE WAY FAULT TREES AR ...
SBIR Phase I 1985 Nuclear Regulatory Commission -
IN-REACTOR MEASUREMENTS INVOLVING ELECTROCHEMICAL POTENTIAL A NUMBER OF BOILING WATER REACTORS (BWRS) SUGGEST THAT THE WATER CHEMISTRY OF THE PRIMARY COOLANT OF EACH BWR MAY BE UNIQUE WITH RESPECT TO ITS ABILITY TO FACILITATE IGSCC AND/ OR MAY CHANGE
SBC: Michael Fox Topic: N/AIN-REACTOR MEASUREMENTS INVOLVING ELECTROCHEMICAL POTENTIAL A NUMBER OF BOILING WATER REACTORS (BWRS) SUGGEST THAT THE WATER CHEMISTRY OF THE PRIMARY COOLANT OF EACH BWR MAY BE UNIQUE WITH RESPECT TO ITS ABILITY TO FACILITATE IGSCC AND/ OR MAY CHANGE WITH REACTOR OPERATING TIME OR AGE. THE WORK PROPOSED IS TO GATHER, REVIEW, ORGANIZE, COMPILE, C COMPUTERIZE, AND ANALYZE IN-REACTOR DATA PERTAINING ...
SBIR Phase I 1985 Nuclear Regulatory Commission -
Integrated Sensor Unit for Signalized Intersections
SBC: Physical Optics Corporation Topic: 180FH3The DOT seeks an integrated unit capable of identifying and tracking individual vehicles with high accuracy using multiple vehicle detection inputs, including video images, radar-based detection, and vehicle-to-everything radio signal inputs (DSRC, cellular-V2X), with a deep learning-based engine to fuse collected data. To address this DOT need, Physical Optics Corporation (POC) proposes to contin ...
SBIR Phase II 2019 Department of Transportation